ML20087B416

From kanterella
Jump to navigation Jump to search
Deficiency Rept Re Items Supplied by Tube-Line Corp.Final Rept Delayed Until 840430 Per 840213 Telcon
ML20087B416
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/15/1984
From: Rhode G
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
8059, NUDOCS 8403090078
Download: ML20087B416 (1)


Text

-

Y NIAGARA NUMOHAWK M4AGARA MOHAWK POWER COMPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 February 15, 1984 (8059)

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631' Park Avenue

' King of Prussia, PA 19406-

Dear Mr. Starostecki:

RE:

Nine Mile Point Unit 2 Docket No. 50-410 The final report in'accordance with 10CFR50.55(e) concerning items supplied by Tube-Line Corporation will be submitted to the t'uclear Regulatory Commission by April 30, 1984, racher than February 17, 1984, as previously committed. This extension was granted via telecon'between Mr. T. R. Loomis (Nine Mile Point Unit 2 Licensing) and Mr. S. Collins of your staff on February 13, 1984.

Very truly yours, A.

DW&O G. K. Rhode Senior Vice President

,GKR/TRL:lf xc: Director of Inspection and Enforcement U. S. ?!uclear Regulatory Commission Washington, DC 20555 Mr. R. Gramm, Resident Inspector Mr. S. Collins (NRC, Region I) 8403090078 e40215 PDRADOCK05000g g

d i0

_