ML20087A177
| ML20087A177 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/03/1992 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20087A175 | List: |
| References | |
| NUDOCS 9201080226 | |
| Download: ML20087A177 (8) | |
Text
e g.
TABLE 4.3-2 MQ ENGINEERED ' SAFETY FEAIl1RES ACillATION SYS;?j INSTRilHENTA10N SilHVfill ANCE REQlllREMElliS
+
0 0
CilANNEt H00ES FOR WillCil CilANNLt CllANNEt iIINCT IONAl.
SilRVt1LIANCE
^
g filNCTIONAl. IlNil CilECK CALIBRATION TESI 15 REgillRED G
1.
SAFETY INJECTION (SIAS) a.
Hanual (Irip Buttons) ' _
li. A N.A.
H 1, 2, ' 3, - 4 b.
Containment Pressure - liigh 5
R H
1, 2. 3 c.
Pressurizer Pressure Low S-R H
1, 2, 3 d.
Automat ic Actuation logic FL A.
N.A.
H(2) (3) (6) 1, 2, 3 l
2.
CONTAINHElli SPHAY (CSAS) a.
Manual (Trip Buttons)
IL A.
N.A.
H 1, 2, 3, 4 t'
'b.
Containment Pressure --
liigh - liigh 5.
R H
1, 2, 3
'f c.
Automatic Actuation Logic N.A.
N.A.
H(1) (2) (3)
I, 2, 3 3.
CONIAINMENI IS0lATION (CIAS) a.
Manual CIAS (Irip Buttons)-
N.A.
N.A.
H 1, 2, 3, 4 b.
Containment Pressure - liigh 5
R H
I, 2, 3 o
c.
Pressurizer Pressure - Low S
R H
1, 2, 3 d.
Automatic Actuation Logic H.A.
N.A.
H(1) (2) (3)
I, 2, 3 4.
MAIN STEAM LINE 1501AIICH a.
Manual (Trip Buttons)
IL A.
H.A.
H 1, 2, 3 b.
Steam Generator Pre sure - low S R
H 1, 2, 3 c.
Containment Pressure - liigh 5
R H
1, 2, 3 d.
Automatic Actuation 1ogic H.A.
- 11. A.
H(I) (2) (3) 1, 2, 3 3 'M m
TO 2
y-O n
$} -
2 cv
.:. ii
'O ij t
p.
f IABIE 4.'3-2 (Continued}-
' [.
.g
~ [NGlHEERED-SAFEIY TEAll1RES ACillAll0ti SYSTEM INSTRilHfNIAll0N SilRVElll ANCE REQlllREMENIS
. in -
- o,-
o' CllAl4NEL HODES 10R WillCil
- i CilANNLL CilANNE L
- 1IlNCT10NAL -
SURVEILtANCE filNC110NAL IJNI T CllECK.
CALIBRATION
. TEST IS REQUIRED' g:p' S.'
SATEIY lilJECTION SYSTEM RECIRCillATION (RAS) a.
Manua l RAS' ('s',' IP llultonS) it. A.
N.A.
-N' b.
Refueling Water Storage I, 2
- i. 4 t-Pool - low R
1, 2, 3, 4 c.
-Automatic' Actuation Iogic N. A.
N. A.-
M(I) (2) (3) 1, 2, 3. 4 6.
LOSS Of POWIR (10V).
4.16 kV Emergency Bus -
a.
findervoltage (Loss of Voltage) il A.
R U(4)
I, 2, 3
,g is.
480 V Emergent.y 11os ilndervoltage-(1oss of
- 4 Voltage)
- 11. A.
R 1)( 4 )
1, 2 J
.m c.
4.16 kV.imergency ljus lindesvoltage (Degraded Voltage) fl. A.
R D(4) 1 2,
3 i
I h
l.
MitM?,%
4
(
1ABlE 4.3.-2 (Continued)
C4 ENGillEERED SAFETY FEAlllRES AcillAi!ON SYSTEH IllSTRilHEllIATION SilRVElll ANCE REQll!REHENTS q
S CllAllNEL H0 DES FOR WillCil j
o CHAHilEL CllANNL1 IllflCTIONAL SilRVElll ANCE lilNCIIOilAL llNII tilECK CAtIBRATI0tt IEST 15 REQ] IRED Ea*
7.
Manual (Trip Buttons)
N. A.
N.A.
R 1, 2, 3 i.,
6.
SG Level (1/2)-Low and AP (1/2) - liigh 5
R 11 1, 2, 3 c.
SG level (1/2) - Low and No Pressure - tow Trip (1/2)
S R
11 1, 2, 3
d.
Automatic Actuation Logic H.A.
H.A.
H(1) (2) (3) 1, 2, 3 e.
Control Valve Logic 5
R SA(S) 1, 2, 3 (Wide Range SG level - low) 2 y
C:
TABLE NOTATION (1) Each train or logic channel shall be tested at least every 62 days on a STAGGERED IEST DASIS.
lest ing of Automatic Actuation logic sliali isiclude energizationi/deenergization of each inillation relay (2) and verification of the OPERABILITY of each initiation relay.
l (3) A subgroup relay test shall be performed which shall include the energfration/deenergization of each subgroup relay and verification of the OPERABILITY of each subgroup relay.
Relays K109, K114, d202, 3
K301, K30S, K308 and K313 are exempt from testing during power operation but shall be tested at least 9l once per 18 months and during each COID SilllTDOWil condition unless tested within the previous 62 days.
1 m
U (4) llsing installed test switches.
($)
To be perf or med during each C010 SilillDOWN if not performed in the previous 6 months.
O (6) Lach train shall be tested, with the exemption of relays, K110, K410 and K412, at least every 62 days on a SIAGGERED IESI BASIS.
Relays K110, K410 and K412 shall be tested at
'st every 62 days but will be exempt from the STA(RED TfSi 8A515.
1 t
8 NPF-38-119 ATTACllMENT 11
]
.a
o i
4 g
IABIE 4.3-2 My EllGINEERED SAFEIY FEAlllRES ACillATI0li SYSTEH ItiSIRilHEllIAION StiltVElfl ANCE REQIIIREHEf415 O
O CliArltit!
!! ODES 19H Willegg CilAt4N1 t CliANNEL i ilNCIIGN41 SilRVL11I ANr' g
t ilNCTIONAI IINI I CIIECK CAITBRATION Tl SI
_Is REQtilRil 1.
SAFEIY lilJECTION (SIA5) a.
Manisal (Irip Buttons) ti. A.
H.A.
H I, 2, 3, 4 b.
Containtnent Pressure - liigh S
R H
I, 2, 3 c.
Pressurizer P m sure - tow 5
R I, 2, 3 d.
(Antomatic r.ctuationfogic tf A.
N.A.
if( 2 ) (3) (6) i, 2, 3h l
~
~
2.
CONTA!!it!ENI SPHAY (CSAS) l a.
Manual (Trip Buttons) li. A.
fl. A.
II I, 2, 3, 4
}
R b.
Containment Pressure --
liigh - liigh S
R L2 3
%g (Automatic Actination logic ti. A.
H.A.
M(1) (2) 13)
I, 2, 3jaa y
c.
i 3.
CONTAINHEtil IS01AIION (CIAS) a.
Manual CIAS (frip Buttons) fl. A.
N.A.
H 1, 2, 3, 4 tNirH b.
Containr ent Pressure - liigh 5
R H
I, 2, 3 t Nse rqr "A" c.
Pressurizer Pressure - tow S
R H
1, 2 3 -
]
l i
d.
GiithAaticActuationlogic 1[ A m lL A.
HII)(2)(3)
I, 2 4.
MAIN SIEAll LlHE 1501AI' N f
a.
Manual (Trip But'..is)
H.A.
N.A.
H 1, 2, 3 b.
Steam Generator tessure - low 5 R
H 1, 2, 3 c.
Containment Pr ssure - liigh 5
R H
1, 2. _ 3 d.
(Automatic Ac_ti stfrin logic fl. A.
fl. A.
H(1) (2) (3) 1, 2, 3, J
$G SifG 5
t I
I IAlltE 4.3-2 (Continued) t E'
g ENGI'4EERED SAFETY TEAlllRES ACillAIInff SYSIIH INSTRllHf filAIION SilRVE!!I ANCE REQUIREMIt415 I
o,.
CIIANNE1 HODES f OH WillCli o
CilANNLL CilANNEL iIANCTIONAL SilRVt.ill AM. E FliNCil0NAt 16r411 CIIECK CAtTBRATION TEST 15 REQUIRED l
Ey 5.
SAFETY lilJECTION SYSTEN 1
RECIRCutATION (RAS) l Manual RAS (Trip Buttons)
H. A.
N.A.
R 1, 2, 3, 4 d.
b.
Refiseling Water Storage Pool - Iow S
R 1, 2, 3, 4f homatic Actasatiota logic c.
N.A.
H.A.
M(I) (2) (3)
I, 2, 3, 4 6.
1051 Uf POWER (10V) a.
4.16 kV Emergency Bus Rg w I
L L
lindervoltage (Eoss of M
t Voltage)
H. A.
R II( 4 )
I, 2, 3 i MSERT " A "
g h.
480 V Emergent.y Dus Undervoltage (Loss of 4
Voltage) ti A.
H II( 4 )
1, 2, 3
- m 4.16 kV [ men gency Bus c.
Undervoltage,(Degraded Voltage) ti. A.
R U(4)
I, 2, 3 1
1 i
i
n
~
(
y IABIE 4.3.-2 (Continued}
M ig ENGINEEREP SAFETY FEATURES ACielATION SYSTEH INSTRi! MENTATION SilRVEILtANCE REQll!REMENTS 8
C' Cl!ANNEI HODES FOR WillCil CilANNEL CilAN!!Et iIINCTIONAL SilRVL11IANCE E
FilHCTIONAL UNIT CIIECK CALIBRATION TEST 15 REQtlIRED Z
7.
EMERGENCY FEEDWAIER (EFAS) m a.
Manual (Trip Buttons)
N.A.
H.A.
R 1, 2, 3 b.
SG tevel (1/2)-Low and AP (1/2) - liigh S
R H
1, 2, 3 c.
SG level (1/2) - low and No J essure - Low Trip (1/2)
S R
11
- 1. ' 3e d.
[ Automatic Actuation Logic
_N.A.
_ J A.
H(1) (2) (3) 1, 2, ME e.
Control Val W fogic 5
R SAf5) 1, z. 3 W' M (Wide Range SG level - Low)
WSEG %,
m2 i
'i' Ci TABLE NOTATION Q]
(1) Each train or log'c channel shall be tested at least every days on a STAGGERED TEST BASIS.
(2) lesting of Automatic Actuation logic shall include energization/deenergization of eacia initiation relay and verification of the OPERABILITY of each initiation relay.
(3) A subgroup re nj test shall be performed which shall include the energization/deenergization of each 4
s subgroup relay and verification of the OPERABILITY of each subgroup relay.
Relays K109, K114, K202, 9
K301, K305, K308 and K313 are exempt from testing during power operation but shall be tested at least y
once per 18 months and during each C010 SiluTDOWN condition unless tested within the previous 62 days.
-i (4) Using installed test switches.
5 (5) 10 be performed during each C010 SiltlIDOWN if not performed in the previous 6 months.
J (6) Each train shall be tested, with the exemption of relays, K110. K410 and K412, at least every 62 days on a STAGGERED IESI BASIS.
Relays K110, K410 and K412 shall be tested at Da.ETE 1 'st every 62 days but will'be exempt from the STA " RED TEST !! ASIS.
[
l Insert "A"
]'
1-4 i
.i e
Automatic Actuation Logic (except subgroup relays)
N.A.
N.A.
M(2) 1, 2, 3 Actuation Subgroup Relays N.A.
N.A.
SA(1) (3) 1, 2, 3 a
1 l
j i
i i
I' l
i.
\\
i I
i i
i
{
i i
1 l
l 1
i 4
i I
i b
.~,,.
.. -.. ~... ~ -
- ~.. -
.