BALTIMORE GAS AND ELECTRIC 1650 CALVERT CLIFFS PARKWAY
- LUSBY, MARYLAND 20657-4702 Gronor C. CnttL vice ParsicirNT NuctEAM LhtNGY (410) #00 = 4 4 9 5 December 24,1991 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2: Docket Nos. 50 317 & 50-318 Pressurizer Surge Line Thermal Stratification,Bulletin 88-11 Calvert Cliffs Unit 1 and Unit 2 (TAC Nos. M72119 and M72120)
REFERENCES:
(a)
Mr. J. J. Hutchinson (CEOG) to Mr. J. W. Shea (NRC),
- Schedule for Completion of Generic Bounding Analysis of Surge Line Thermal Stratification", CEOG.91523, dated September 24,1991 (attached)
(b)
Mr. D. G. Mcdonald. Jr. (NRC) to Mr. G. C. Creel (BG&E),
" Pressurizer Surge Line Thermal Stratification,Bulletin 88-11, Calvert Cliffs Nuclear Power Plant, Unit I and Unit 2", dated September 9,1991 (c)
Mr. J. J. Hutchinson (CEOG) to NRC Document Control Desk,
" Combustion Engineering Owners Group Response to NRC Bulletin 88-11, ' Pressurizer Surge Line Flow _ Stratification',
CEN-387-P, Rev.1-P," dated December 20,1991 (attached)
Gentlemen:
The purpose of this letter is to clarify Baltimore Gas and Electric Company's schedule for completion of actions in response to the subject NRC Bulletin. Two Bulletin action items,1.b. and 1.d., remain to be submitted and accepted by the NRC to fulfill our required response. The following schedule for completion of ther.c action items was agreed to dunng an NRC review meeting of the CEOG Surge Line Analysis Program held on September 18 and 19,1991, as documented in Reference (a).
l l
Action Ite n 1.b. requests demonstration that the pressurizer surge line meets the applicable design codes and regulatory commitments for the licensed life of the plant. This action item will be accomplished by the performance of a generic bounding analysis to be performed by the Combustion Engineering Owners Group (CEOG). CEOG's final report, including the bounding analysis, was l
t'uc to the NRC by December 31,1991, and was submitted on December 20,1991 (Reference c).
thbi% lil w
nacen ww?M,
()$
&rDa 7
4 Document Contiol Desk
' December 24,1991 Page 2 The second unresolved action item,1.d., requests that we update our stress and fatigue analyses to-ensure compliance with applicable code requirements. As documented in Reference (a), an agreement was reached between the NRC Staff and CEOG in September that the completion of this activity would be scheduled to occur after the issuance of a favorable Safety Evaluation Report (SER). Ilowever, there is a statement in Reference (b) indicating NRC's belief that all plant-specific actions will be complete by December 31,1991. This is contrary to the agreement described above.
Our plans are to complete any plantupecific activitics within 60 days following the issuance of the NRCSER.
Should you have any further questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, p
)
GCC/NII/nh/ dim Attachment cc:
D. A. Brune, Esquire J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald Jr., NRC T. T. Martin, NRC L E. Nicholson, NRC R. I. Mclean, DNR J. II. Walter, PSC l
U f
L__./
n rWCOMBUSTION ENGINEERING OWNERS GROUP
.....-..-u c..
c.
.........,c.
o-.s......, o....
'$3Eb!Y""
- ""[N.5r" SL
-"$$lh5f~""
"" S M "-"
John J. Hutchinson, Chairman c/o Florida Power & Lightn00 Universe Boulevard / Juno Beach, FL 33408 September 24, 1991 CEOG-91-523 U.
S.
Nuclear Regulatory Commission Mr. Joseph W.
Shea Lead project Manager Division of Reactor Projects Office of Nuclear Reactor Regulation Washington, DC 20555
Subject:
Schedule for Completion of Generic Dounding Analysis of Surge Line Thermal Stratification
Reference:
J. W. Shea to J. J. Hutchinson, " Audit of Combustion Engineering Owners Group Regarding Status of Generic Final Analysis of Surge Line Thermal Stratification (NRC Bulletin 88-11)", NRC Letter dated August 2, 1991.
Dear Mr. Shea:
As requested by the Reference, the purpose of this letter is to inform the Staff of the revised completion schedule for the Surge Line thermal stratification generic bounding analysis. The generic bounding analysis and the final report will be submitted to the Staff by December 31, 1991.
This schedule for completion was discussed during an August 14, 1991 conference call with the Staff and agreed to during an NRC review meeting of the CEOG Surge Line analysis program held on Sectember 18 and 19, 1991 in Windsor, CT.
The generic bounding analysis provided in the final report will demonstrate the structural integrity of CEOG member utility surge lines is maintained for a forty year design life.
In addition, the final report will verify that no hardware modifications are required for the present surge lines.
It is our understanding, based upon the September review meeting, that submittal of the final report meets the requirements for completion of NRC Bulletin 88-11 action item 1.b.
In addition, specific Justification for Continued Operation by CEOG member utilities will not be required provided that the final report is submitted to the staff by December 31, 1991.
It is also our understanding, based upon the September review meeting, that the completion of the plant specific activities to update surge line design documentation (NRC Bulletin 88-11 action item 1.d) can be scheduled based upon the date of issuance of a favoraPle SER by the Staff on the final report.
fi
,- p.
o k
.%. l ) {
\\ \\
Mr. Joseph W.
Shea September 24, 1991 Page 2 CEOG-91-523 If you have any questions on this matter, please do not hesitate to contact me.
Very truly)yours, A-QV %<
( ohn J.
Hutchinson, Chairman C-E Owners Group JJH/pjh cc:
C-E Owners Group T.
Chan, USNRC 1