ML20086R077

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Consisting of Proposed Change 165 Re Analog Sys Replacement
ML20086R077
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/23/1991
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20086R062 List:
References
NUDOCS 9112310141
Download: ML20086R077 (1)


Text

_ _ _ _ _ _ _ _ _ _ _

m p

\\,

Q"l h

~

VYNPS 7 'is

' TABLE 4.2.2 c-26.y Minimium Test and Calibration Frequencies D-Uo3 Primary Containment Isolation ins t rimmenta tion os

<32 Trip Function Functional Test (6)

Calibration (8)

Iustrument L.seck l

ow-Low Reactor Vessel (Note 1)

Once/ Operating Cycle Once Each Day 7ty Water Level ligh Steam Line Area (Note 1)

Each Refueling Outage Temperature liigh Steam Line Flow (Note 1)

Once/Operatirrg Cycle Once Each Day Low Main Steam Line Pressure (Note 1)

Every Three Months Low Reactor Vessel (Note 1)

Once/ Operating Cycle Water Level Illgh Main Steam Line Radiation (Notes 1 and 7)

Each Refueling Outage Once Each Day liigh Drywell Pressure (Note 1)

Once/ Operating Cycle Once Each Day Condenser lov Vacuum (Note 1)

Every Three Months Trip System Logic Once/0g rating Cycle Once/ Operating Cycle (Note 2)

(Note 3)

Amendment No. 18. /f>, 195 5%

-