MONTHYEARML20153B7921998-08-31031 August 1998 Rev 0 to Fermi 1 Sar ML20197A9921997-12-15015 December 1997 Rev 0 to Efp,Unit 1 Fermi 1 Sar ML20148A3191997-05-0202 May 1997 SE Summary Rept for Fermi 2, Rev 1 ML20137N1261997-03-25025 March 1997 Rev 0 to Leak-Before-Break Evaluation for Three Locations on Recirculation Sys at Fermi 2 ML20133A2311996-12-19019 December 1996 Ferm 2 CR Simulator Four Yr Rept ML20129A3511996-03-15015 March 1996 Rev 0 to Cchvac Duct & Duct Support Qualification ML20134J6241996-03-13013 March 1996 Rev 0 to Tmr 96-0003, Safety Evaluation ML20083A7591995-05-0808 May 1995 Safety Evaluation Summary Rept, Rev 7 NRC-94-0093, Main Turbine-Generator Vibration Monitoring & Balancing During Start-Up After RF041994-10-0707 October 1994 Main Turbine-Generator Vibration Monitoring & Balancing During Start-Up After RF04 ML20076J6211994-10-0606 October 1994 Safety Evaluation of Rev a to Edp 26726 ML20076J5831994-08-31031 August 1994 Turbine Failure Post-Event Earthquake Passive Instrumentation Data Evaluation ML20076J6081994-08-27027 August 1994 Root Cause Analyses of Fermi 2 Main Turbine Generator Event, Executive Summary ML20076J5891994-08-0808 August 1994 Structural Walkdown Final Rept ML20093N4781994-03-0303 March 1994 Gamma Spectroscopy Analysis Rept ML20093N4901994-03-0303 March 1994 Gamma Spectroscopy Analysis Rept ML20064L9841994-02-0404 February 1994 Turbine Failure,Post-Event Earthquake Instrumentation Data Evaluation ML20126J1141992-12-30030 December 1992 Nuclear Training Simulator Certification ML20099B9921992-07-10010 July 1992 Rev 0 to Updated NUREG-0619 Feedwater Nozzle Fatigue Crack Growth Analysis,Fermi Nuclear Power Plant Unit 2 ML20086P2551991-12-31031 December 1991 Nuclear Training Simulator Certification NRC-91-0039, Safety Evaluation Summary Rept 19901991-03-18018 March 1991 Safety Evaluation Summary Rept 1990 NRC-90-0041, Safety Evaluation Re as-built Notices1989-12-31031 December 1989 Safety Evaluation Re as-built Notices NRC-90-0104, Rev 1 to Decommissioning Cost Study of Enrico Fermi Atomic Power Plant Unit 11989-11-0808 November 1989 Rev 1 to Decommissioning Cost Study of Enrico Fermi Atomic Power Plant Unit 1 ML19354D4801989-10-20020 October 1989 Rev 1 to Safety Evaluation. ML19324B7551989-09-30030 September 1989 Radioiodine & Particle Transmission Through Sampling Lines for Standby Gas Treatment Sys Effluents at Fermi 2, Final Rept ML20248E7021989-09-30030 September 1989 Control Sys Common Power Source Failure Analysis Evaluation Rept for Enrico Fermi Atomic Power Plant Unit 2 ML20247H8991989-08-31031 August 1989 Control Sys Common Sensor Line Failure Analysis Evaluation Rept for Enrico Fermi Atomic Power Plant Unit 2 ML20245B3851989-06-13013 June 1989 ATWS Alternate Rod Insertion & Recirculation Pump Trip Response to NRC Rule 10CFR50.62 ML20235J4271987-09-30030 September 1987 Supplemental Environ Info Enrico Fermi Atomic Power Plant, Unit 1 ML20235G3041987-09-29029 September 1987 Partially Withheld, Preliminary Investigation of Enrico Fermi II Nuclear Power Plant ML20237K6061987-07-31031 July 1987 Suppl 1 to Dcrdr ML20236C8291987-06-29029 June 1987 Preimplementation Audit Rept for Dcrdr for Fermi-2 ML20234C9821987-05-21021 May 1987 Insp Followup of Failure of South Reactor Feed Pump Turbine,Fermi Unit 2 Nuclear Power Plant, Technical Review Rept ML20236C8601987-05-11011 May 1987 Post-Implementation Audit Rept for Fermi-2,SPDS ML20204F1701987-01-31031 January 1987 Maint,Mod & Outage Mgt Monthly Rept. Maint/Mods for Period Ending 870222, Manpower Tracking - Labor Distribution & Period Ending 870125, Hours by Craft Rept, Also Encl ML20209B8231987-01-30030 January 1987 Rev a to Heavy Loads Handling Review,Control of Heavy Loads Over or in Close Proximity to Irradiated Fuel or Critical Safety Sys Components ML20214Q4521986-11-30030 November 1986 Dcrdr Summary Rept,Fermi 2 ML20211D3961986-10-0303 October 1986 Preliminary Rept on Main Steam Bypass Piping Fatigue Analysis & Life Expectancy ML20211D4211986-10-0303 October 1986 Preliminary Steam Bypass Line Structural Evaluation ML20214J8391986-08-31031 August 1986 Final Rept on Metallurgical Investigation of Various Defects on Surfaces of Diesel Engine Aluminum-Tin Bearings ML20209E7591986-07-0202 July 1986 Response to Independent Overview Committee ML20213A5901986-06-30030 June 1986 Investigation of Surface Scoring of Main Bearings:Fairbanks Morse 38TD8-1/8 Diesels at Fermi II Power Plant ML20209E7791986-06-26026 June 1986 Program to Evaluate & Resolve Engineering Issues ML20141M9441986-01-30030 January 1986 Evaluation of Detroit Edison Mgt at Fermi 2 ML20237J4711985-08-31031 August 1985 Rev 1 to Enrico Fermi Atomic Power Plant Unit 2 Primary Containment Negative Pressure Analysis ML20128B7251985-06-30030 June 1985 Rev 4 to Evaluation of Containment Coatings A10089, Investigation of Engine Bearing Distress in Fairbanks-Morse Emergency Diesel Generators at Fermi-II Power Plant, Phase 1:Insp & Preliminary Conclusions1985-02-28028 February 1985 Investigation of Engine Bearing Distress in Fairbanks-Morse Emergency Diesel Generators at Fermi-II Power Plant, Phase 1:Insp & Preliminary Conclusions ML20115F3901985-02-28028 February 1985 Transfix Sys Description. W/Four Proprietary Drawings 8911-M-2000,2001,2006 & 9402-M-2100 Re Transfix Sys P&Id. Drawings Withheld (Ref 10CFR2.790) ML20115F4381985-02-28028 February 1985 Comparison of NUS Process Svcs Corp Mobile Radwaste Processing Sys W/Guidelines of Us NRC Reg Guide 1.143 ML20106G1011985-01-31031 January 1985 Evaluation of Fire Doors 3-20 & 3-13 at Fermi 2 ML20117D5201985-01-31031 January 1985 Rev 0 to Mark I Wetwell to Drywell Differential Pressure Load & Vacuum Breaker Response for Fermi Atomic Power Plant Unit 2 1998-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N4381999-10-25025 October 1999 Safety Evaluation Supporting Amend 17 to License DPR-9 ML20217P3551999-10-22022 October 1999 LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fermi 2.With NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fermi 2.With NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fermi 2.With NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with1999-06-30030 June 1999 Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fermi 2.With NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fermi 2.With ML20206J9301999-05-10010 May 1999 SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves ML20206G5081999-05-0505 May 1999 Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety NRC-99-0022, Monthly Operating Rept for Apr 1999 for Fermi 2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fermi 2.With ML20205Q7141999-04-15015 April 1999 Safety Evaluation Supporting Amend 16 to License DPR-9 ML20205P9721999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fermi 2 ML20204E0371999-03-17017 March 1999 Safety Evaluation Accepting Licensee Request for NRC Approval of Alternative Rv Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Plant,Unit 2 for 40-month Period ML20204D0361999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fermi 2 ML20198S3341999-01-0606 January 1999 Safety Evaluation Supporting Amend 15 to License DPR-9 NRC-99-0005, Monthly Operating Rept for Dec 1998 for Fermi 2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fermi 2.With ML20207B7491998-12-31031 December 1998 1998 Annual Operating Rept for Fermi 2 ML20205Q9621998-12-31031 December 1998 Revised Monthly Operating Rept for Dec 1998 for Fermi 2 NRC-99-0021, 1998 Annual Financial Rept for Detroit Edison Co. with1998-12-31031 December 1998 1998 Annual Financial Rept for Detroit Edison Co. with NRC-98-0153, Monthly Operating Rept for Nov 1998 for Fermi 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fermi 2.With NRC-98-0160, Monthly Operating Rept for Oct 1998 for Fermi 2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fermi 2.With ML20154R2331998-10-21021 October 1998 Safety Evaluation Supporting Amend 13 to License DPR-9 ML20154L1031998-10-14014 October 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode NRC-98-0139, Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With ML20154H8161998-09-30030 September 1998 Rev 0 to COLR Cycle 7 for Fermi 2 ML20153B8811998-09-18018 September 1998 Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 ML20151X0651998-09-11011 September 1998 Safety Evaluation Re Inservice Testing Program Relief Request VR-63 for Plant NRC-98-0111, Monthly Operating Rept for Aug 1998 for Fermi 2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fermi 2.With ML20153B7921998-08-31031 August 1998 Rev 0 to Fermi 1 Sar ML20237E1171998-08-25025 August 1998 Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program ML20236X8611998-08-0505 August 1998 SER Related to Revised Feedwater Nozzle Analysis to Facility Operating License NPF-43,Enrico Fermi Nuclear Power Plant, Unit 2 NRC-98-0109, Monthly Operating Rept for July 1998 for Fermi 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fermi 2 ML20236K3261998-07-0101 July 1998 SER Accepting Licensee Response Related to Revised Feedwater Nozzle Analysis to License NPF-43 for Enrico Fermi Nuclear Power Plant,Unit 2 NRC-98-0097, Monthly Operating Rept for June 1998 for Fermi,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fermi,Unit 2 NRC-98-0127, Annual Rept for Period 970701-9806301998-06-30030 June 1998 Annual Rept for Period 970701-980630 NRC-98-0079, Monthly Operating Rept for May 1998 for Fermi 21998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fermi 2 NRC-98-0076, Monthly Operating Rept for Apr 1998 for Fermi 21998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Fermi 2 NRC-98-0072, Monthly Operating Rept for Mar 1998 for Fermi 21998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fermi 2 NRC-98-0050, Monthly Operating Rept for Feb 1998 for Fermi 21998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fermi 2 NRC-98-0019, Monthly Operating Rept for Jan 1998 for Fermi 21998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fermi 2 ML20198L4241998-01-0808 January 1998 Safety Evaluation Accepting Proposed Rev 2 to Relief Request VR-51 Under Fermi 2 Pump & Valve Inservice Testing Program Per 10CFR50.55a(f)(6)(i) for First 10-yr Interval NRC-98-0015, Monthly Operating Rept for Dec 1997 for Fermi 21997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fermi 2 ML20217N3821997-12-31031 December 1997 Annual Operating Rept for 970101-1231 NRC-98-0053, 1997 Annual Financial Rept for Detroit Edison Company1997-12-31031 December 1997 1997 Annual Financial Rept for Detroit Edison Company ML20205Q9601997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Fermi 2 NRC-97-0141, Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility1997-12-23023 December 1997 Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility ML20197A9921997-12-15015 December 1997 Rev 0 to Efp,Unit 1 Fermi 1 Sar NRC-97-0131, Monthly Operating Rept for Nov 1997 for Fermi 21997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fermi 2 ML20248H1151997-10-31031 October 1997 Rev 1 to Colr,Cycle 6 for Fermi 2 1999-09-30
[Table view] |
Text
_ .. - .. ___ __ - . . . .
l l
l DET-04-023-3 Revision 1 November 1983 ENRICO FERMI ATOMIC POWER PLANT UNIT 2 PLANT UNIQUE ANALYSIS REPORT VOLUME 3 VENT SYSTEM ANALYSIS I
Prepared for:
Detroit Edison Company ;
) Prepared by:
NUTECH Engineers, Inc.
Approved by: Issued by:
. b Dr. N. W. Edwards, P.E. L. D. Steinert President Project Manager NUTECH Engineers, Inc.
i l
U 8402270106 840221 n PDR ADOCK 05000341 A pm
REVISION CONTROL SHEET (Continuation)
TITLE: ENRICO FERMI ATOMIC REPORT NUMBER: DET-04-028-3 Q POWER PLANT, UNIT 2 PLANT UNIQUE ANALYSIS REPORT Revision 1 VOLUME 3 1
. Un V e bS K. E. Parzyck / Erfaf. Analyst Initial 6
R. D. Quinn / Consultant I Initial 1 l
t b2nr \ ,u ni S. P. Quinn / Senior T4chnician Initial' L/LL S. H. Rosenblum / Consultant I BK Initial Bsc p M.'A. Ruper's / Specialist Initial
{, h Yrpus i
/ P b ,
W. E. Smith / Associate Engineer Initial Ab S. S. Tang / Sqhior Engineer Initial dich .$ ht<a th [57 C. S. Tetamoto / Consultant I Initial ,
NiN F M ' '1 ')
Y.C.Yfti / Ertyineer Initial '
o d7 % M /LOS Initial L. D. Steinert/Droject Manager 3-iii nutg,qb
REVISION CONTROL SHEET (Continuntion)
TITLE: ENRICO FERMI ATOMIC REPORT NUMBER: DET-04-028-3 C POWER PLANT, UNIT 2 Revision 1 Q) PLANT UNIQUE ANALYSIS REPORT VOLUME 3 ACCURACY CRITERIA PRE- ACCURACY CRITERIA E REV PRE- E REV PARED CHECK CHECK rPAGE(S) PARED CHECK CHECK PAGE(S) 3-2.109 0 3-2.172 0 My 44 VA thro h 8M Vk, f6b' 3-2.173 ' w NN 3-2.112 3-2.174 44: 5M EM through 8A RQ VL 3-2.175 KEP #6 4M
.132 ASL VKRL f >l 3-2.176 tbr ac (HT V (, 3-2.177 w< $.M RPd2 3-2.136 3-2.178 ,./5/d Jc
3-2.137 through bg g y[ g pg 3-2.179 M C >T hNL-through 3-2.143 3-2.181 (g thro 3-2.148
% A 84 VK hro 3-2.186 hb 3-2.149 1(EP ( "I M4 3-3.1 0 R V K- S/rt, 3-2.150
$ 3-iii 1 f[3 v$a UK 3-2.159 Q (M AN 3-2.37 1 ,
3-2.160 JDL oq #frL- 3-2.70 1
. . 3-2.129 1 y " y 1 3-2.161 1 2.184 l
through 3-2.162 KEP cif R#4 3-g v4 3-2.163 4 (~5f 3-2.164 through g4 gSk( \/K, 3-2.167 3-2.161. g g yg 3-2.169
[
through 3-2.170 g KpfP Y k.
3-2.171 y yfy Sg V(
0 l
) QEP-001.4-00 V
! 3-v i nutg,qh
components of the vent s,fstem located in spec-ified regions above the rising suppression pool. The components located in Region I which are affected include the downcomer bracing members and ring plates, the vacuum breaker and vacuum breaker supports and the SRV piping supports beneath the vent line.
The components located in Region II which are affected include the vacuum breaker and vacuum breaker supports. The plant unique OSTF test results adjusted for the vent line longitudi-nal location show that froth impingement loads on the vent line'are-negligible.
^
The procedure used to develop the transient forces. and spatial distribution of froth impingement and fallback loads on these com-ponen{s is discussed in Section 1-4.1.4. The resulting magnitudes and distribution of froth
, ' impingement and fallback pressures on the downcomeb bracing members and ring plates, and the vacuum breaker and vacuum breaker supports 1
are, summarized in Table 3-2.2-6. The froth i
I impingement loads acting on the SRV piping and supports located beneath the vent line are presented in Volume 5 of this report. The results shown include the effects of using the
~ .
_ s.
plant unique OSTF movies to determine the
- b. DET-04-028-3~
Revision 1 3-2.37
~
O l
~
l
l source velocity, departure angle, and froth density. Pool swell loads do not occur during the SBA and IBA events.
- d. Pool Fallback Loads: During the later portion the pool swell event, transient drag of pressures are postulated to act on selected components of the vent system located between the maximum bulk pool height and the downcomer exit. The components affected include the downcomer bracing members and ring plates, and the SRV piping and supports located beneath the vent line. The procedure used to develop transient drag pressures and spatial distribu-tion of pool fallback loads on these compo-nents is discussed in Section 1-4.1.4.
The resulting magnitudes and distribution of pool fallback loads on the downcomer bracing members and ring plates are summarized in Table 3-2. 2-7. The pool fallback loads on the SRV piping and supports located beneath the vent line are presented in Volume 5 of this report. The results shown include the effects of maximun pool displacements measured in DET-04-028-3 Revision 0 3- 2. 38 nutgg])
Table 3-2.2-14 MAXIMUM DOWNCOMER CHUGGING LOAD MAGNITUDE DETERMINATION Maximum Chugging Load for Single Downcomer FSTF Maximum Load Magnitude: P l =3.046 kips Tied Downcomer Frequency: fy=2.9 Hz Pulse Duration: t d= 0.003 sec.
Dynamic Load Factor: DLF 1 = vf yd t =0.027 Fermi 2 Downcomer Frequency: f=12.4 Hz
( Dynamic Load Factor: DLF=nft d=0.117 Maximum Load Magnitude (In any direction) :
P,3 =P y (hff-) = (3. 046) ( 4. 276) =13. 02 kips 1
Note:
- 1. See Figure 3-2.4-6 for Fermi downcomer frequency determination.
)
i I
DET-04-028-3 3-2.69 Revision 0 C'
nutgsb
Table 3-2.2-15 MULTIPLE DOWNCCMER CHUGGING LCAD MAGNITUDE DETEPRINATION g i i e i i i i e i i e i i , e L <> I I I I I t I i i i i i l i I
s (1 I i i i i i I i l l I I t i i i I I I I I I
\l I I I 4 I
.c 10.0 g, , , , , , , , , , , , , , ,
~
\l 1 I i i l i I i t i i t I i i
= t I I i I i i l i I I t i I iNi i i i i 5 i i i I i i i e i
\' ' ' ' ' ' ' ' ' '
$ 5.0 I
i I NI I i i i 6 I i i i i I 5 I I I I 1 : i I i i l I i 0- 1 I I I I I I i e i ,
1 I I I I i i i i l I i i l i i i e i I i I e i e : i +
E 50.0.
1 20 40 60 80 Number of Dcwncc:rers Leaded Chugging Leads for Multiple Dcwnce=ers (kips)
Nu=ber of l Mu=ber of ofP Exceedance bability TS""? Lead Te==1 Luad OcwnecmersI Chues Per Ocwncc=er Per Ucwncc=e 5 344 2.91 x 10"* 1.77 7.57 10 688 1.45 x 10-3 1.26 5.39 20 1375 7.27 x 10-4 0.91 3.89
~4 2.91' 40 2751 3.64 x 10 0.68 1.a2 , 10 -4 c.g? 2 . .t .t on 9507 l FSTF
! Chugging duracica: T; = 512 sac Nu=ber of downcemers:,n eeg = 8 Nu=her cf chugs: N; = 313 I
i Fer i 1
l Chugging duration: T., = 900 sec Nu=ber of dcwncemerci n.,c = 2 to 80 l Nu=ber of chugs: N. =
ac: M n gg, x T C x n.a0 Prebability of exceedance: P u "' lN/e 1
NOTE:
l
- 1. SEE ~3E RESPCNSE TO NRC QUESTICN 4 IN APPENDIX A FOR l ADDITICNAL INFORMATICN CN THE MULTIPLE OCWNCCMER
! Caccc:No LATERAL LcAcS.
DET-04-028-3 Revision 1 3-2.70 l nutach
- f. DBA Condensation Oscillation Submerged Struc-i ture Loads: An-equivalent static analysis is performed for the DBA condensation oscillation s submerged structure loads on the support columns. These loads are shown in Table 3-2.2-13. The loads include dynamic amplifi-cation factors which are computed using the methodology described for LOCA air clearing submerged structure loads in load case Se.
The DBA condensation oscillation submerged structure loads acting on the submerged 4
portion of the SRV piping are also' applied.
O 7. Chugging Loads
- a. . Chugging Downcomer Lateral Loads: A harmonic analysis of the downcomers is performed to determine the dominant downcomer frequency for use in calculating the maximum chugging load
['
l magnitude. The harmonic analysis results are shown in Figure 3-2.4-6. The resulting chugg-ing load magnitudes are shown in Table 3-2.2-14. A static analysis using the 1/16th beam model is performed for chugging downcomer lateral load cases 8 through 22. These load DET-04-028-3 Revision 0 3-2.128 i
cases are shown in Tables 3-2.2-16 and 3-2.2-17. An additional static analysis using the 180* beam model is performed for boundary displacements and associated concentrated forces generated for load cases 1 through 7.
A static analysis is also performed for the maximum chugging load shown in Table 3-2.2-18, applied to a single downcomer in the in-plane and out-of-plane directions. The results of this analysis are used in evaluating fatigue.
Reference 7 provides additional information on the Fermi 2 design margins for the single downcomer chagging lateral load.
- b. Chugging Vent System Pressures: An equivalent static analysis is performed for the chugging f vent system pressures applied to the unreacted 1
areas of the vent system. These loads are shown in Table 3-2.2-19. The dominant vent line and vent header frequencies are deter-mined from the harmonic analysis results shown in Figure 3-2.4-7.
DET-04-028-3 Revision 1 3-2.129 nutp_qj)
have a rated capacity of 500 cycles at maximum displace-ment, their adequacy for fatigue is assured.
The ' vent system fatigue usage factors shown in Table 3-2.5-8 are computed for the controlling events, which are Normal Operating plus SBA and Normal Operating plus IBA. The governing vent system cc.,mponent for fatigue is the vent header at the downcomer-vent header inter-section. The magnitudes and cycles of downcomer lateral loads are the primary contributors to fatigue at this location.
The governing vent system weld for fatigue is the nozzle to gusset weld at the SRV penetration to the vent fN i
< line. SRV temperature and thrust loads and the number of SRV actuations are the major contributors to fatigue at this location.
Fatigue effects at other locations in the vent system are less severe than at those described above, due primarily to lower stresses and a lesser number of stress cycles.
Results of studies to analyze and modify the Fermi 2 wetwell-to-drywell vacuum breakers are described in References 8 and 9.
DET-04-028-3 Revision 1 3-2.184 nuttgb i
3-2.5.2 Closure The vent system loads described and presented in Section 3-2.2.1 are conservative estimates of the loads postu-lated to occur during an actual LOCA or SRV discharge event. Applying the methodology discussed in Section 3-2.4 to examine the effects of the governing loads on the vent system results in bounding values of stresses l
l and reactions in vent system components and component supports.
1 The load combinations and event sequencing defined in I Section 3-2.2.2 envelop the actual events postulated to occur during a LOCA or SRV discharge event. Combining l
the vent system responses to the governing loads and evaluating fatigue effects using this methodology results in conservative values of the maximum vent system stresses, support reactions, and fatigue usage f actors for each event or sequence of events postulated to occur throughout the life of the plant.
The acceptance limits defined in Section 3-2.3 are at least as restrictive, and in many cases more restric-tive, than those used in the original containment design documented in the plant's FSAR. Comparing the resulting DET-04-028-3 Revision 0 3-2.185 l
nutp_qh
g 3-3.0 LIST OF REFERENCES J
- 1. " Mark I Containment Long-Term Program," Safety Evaluation Report, NRC, NUREG-0661, July 1980.
- 2. " Mark I Containment- Program Load Definition Report," General Electric Company, NEDO-21888, Revision 2, December 1981.
- 3. " Mark I Containment Program Plant Unique Load Definition," Enrico Fermi Atomic Power Plant Unit 2, General Electric Company, NEDO-24568, Revision 1, June 1981.
- 4. Enrico Fermi Atomic Power Plant Unit 2, Final Safety Analysis Report (FSAR), Detroit Edison Company, Section 3.8, Amendment 12, June 1978.
- 5. " Mark I Containment Program Structural Acceptance Criteria Plant Unique Analysis Application Guide, Task Number 3.1.3," General Electric Company, NEDO-24583-1, October 1979.
- 6. ASME Boiler and Pressure Vessel Code,Section III, Division 1, 1977 Edition with Addenda up to and including Summer 1977.
V 7. Letter EF2-61,658 from Harry Tauber (Detroit Edison) to B. J. Youngblood (NRC), "Downcomer Chugging Lateral Loads," dated February 11, 1983.
- 8. Detroit Edison Letter EF2-59,061 to NRC,
" Evaluation of the Enrico Fermi 2 Drywell-to-Wetwell Vacuum Breakers," dated August 18, 1982.
- 9. Letter EF2-60,296 from Harry Tauber (Detroit Edison) to L. L. Kintner (NRC), " Submittal of Reports for the Fermi 2 Vacuum Breakers," dated November 9, 1982.
p DET-04-028-3 i Revision 1 3-3.1 nutgtgb