ML20086P293

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to Vols 1-5 of long-term Program plant-unique Analysis Rept.Approval Documented in Sser 3
ML20086P293
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/21/1984
From: Jens W
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20086P296 List:
References
EF2-66-818, NUDOCS 8402270090
Download: ML20086P293 (3)


Text

Cryne H. Jens tearN$ tons Deholt Edison EG?!="

February 21, 1984 EF2 - 66,818 Director of Nuclear Reactor Regulation Attention: Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Youngbloou:

Reference:

(1) Enrico Ferm1 Atomic Power Plant, Unit 2 NRC Docket No. 50-341 (2) Letter, Detroit Edison to NRC, EF2-56942,

" Submittal of Plant Unique Analysis Report",

April 30, 1982

Subject:

Incorporate Previous Responses to the Mark I Containment Plant Unique Analysis Report Enclosed please find 40 copies of revision pages to Volumes I through V of the Fermi 2 Long Term Program-Plant Unique Analysis Report (LTP-PUAR) submitted with reference (2).

This revision, as agreed with your staff, merely incorporates the responses to your questions into the LTP-PUAR which were asked during the review of the document. The approval of these responses was documented in Supplement No. 3 to the Fermi 2 SER.

If you have any questions, please contact Mr. O. Keener Earle (313) 586-4211.

Sincerely,

/I Enclosure o/

cc: Mr. P. M. Byron Mr. M. D. Lynch Mr. B. Siegel

,p B402270090 840221 PDR ADOCK 05000341 k A PDR

FERMI 2 PLANT UNIQUE ANALYSIS REPORT REVISION 1

SUMMARY

SHEET i - ,,

The following instructions indicate replacement pages and additional pages'-'for the Fermi 2 Plant Unique Analysis Report, Volumes 1 through 5. Remove old pages and insert corresponding replacement pages. . Place additional pages where indicated.by.,thise. instruction sheet.

~ ' '

' ~" ~

INSERT REVISION 1

. ' LOCATION REMOVE PAGES PAGES Volume 1 ,, , ,

^

' ^

Affected pages Cover Sheet Cover Sheet 1-iii 1-iii 1-iv/1-v 1-iv/1-v 1-viii/1-ix 1-viii/1-ix l-1.3/1-1.4 1-1.3/1-1.4 e 1-1.5/1-1.6 1-1.4/1-1.6

( l-2.29/1-2.30 1-2.29/1-2.30 1-4.47/1-4.48 1-4.47/1-4.48 1-4.82/1-4.84 1-4.83/1-4.84 1-4.89/1-4.90 1-4.89/1-4.90 1-6.1/1-6.2 1-6.1/1-6.2 Add Appendix A (Responses to NRC Questions on the Fermi 2 Plant Unique Analysis Report) ,

DET-04-028-1A, Revision 0, November _1983 to i- the back of Volume 1.

A-ii through A-v A-1 through A-91 Volume 2 Affected pages Cover Sheet Cover sheet 2-ii 2-ii 7- s .

2-iv 2-iv is 2-2.39/2-2.40 2-2.39/2-2.40 2-2.47/2-2.48 2-2.47/2-2.48 2-2.143/2-2.144 2-2.143/2-2.144

s g FERMI 2 PLANT UNIQUB ANALYSIS REPORT REVISION 1

SUMMARY

SHEET (concluded)

INSERT REVISION 1 LOCATION REMOVE PAGES PAGES Volume 3 Affected pages Cover Sheet Cover Sheet 3-ii 3-ii 3-v 3-v 3-2.37/3-2.38 3-2.37/3-2.38 3-2.69/3-2.70 3-2.69/3-2.70 3-2.128/3-2.129 3-2.128/3-2.129 rs \ 3-2.184/3-2.185 3-2.184/3-2.185 I

i, / 3-3.1 3-3.1 Volume 5 Affected pages Cover Sheet Cover Sheet 5-ii 5-ii

, 5-iv 5-iv l

l 5-2.61/5-2.62 5-2.61/5-2.62 l

l 5-4.1 5-4.1 i

I l

l (G) c