Text
- - _ _ _ _ _ _
L
'~
O' l
TENNESSEE VALLEY AUTHORITY CHATTANOdGA.' TENNESSEE 374ot 400 Chestnut Street Tower II BLRD-50-438/83-49 BLRD-50-439/83-42 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - QUALITY ASSURANCE ON VALVE PURCHASE ORDERS BY ATWOOD AND MORRILL - BLRD-50-438/83-49.
BLRD-50-439/83 THIRD INTERIM REPORT The subject deficiency was initially mported to NRC-0IE Inspector P. E. Fredrickson on September 1, 1983 in accordance with 10 CFR 50.55(e) as NC3 837-66 Deficiency No. 2.
This was followed by our interim reports dated September 26 and December 19, 1983 Enclosed is our third interim repor t.
We expect to submit our next report by June 15, 1984.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very traly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosurc cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. - 20555 Records Center (Enclosure)
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 TyFIClld> COPY 8402270020 840217 PDR ADOCK 05000438 9
8 PDR b'
}
t\\
An Equal Opportunity Employer
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 QUALITY ASSURANCE ON VALVE PURCHASE ORDERS BY ATWOOD AND MORRILL NCR 837-66-2 BLRD-50-438/83-49, BLRD-50-439/83-42 10 CFR 50.55(e)
THIRD INTERIM REPORT Description of Deficiency Vendor audit 83V-66 was conducted _ at Atwood and Morrill Company, Salem, Massachusetts, during the period of August 8-11, 1983 As a result of this audit, deviation 83V-66-2 was initiated which identifled the lack of adequate quality assurance requirements imposed on purchase orders for the manufacture of class 1E solenoid valves and air-operated valve actuators. TVA contract No.
82K21-830319, Appendix B, " Quality Assurance Requirements for ASME Section III Valves, requires ANSI N45.2, " Quality Assurance Program Requirements," to be imposed on the valve actuator manufacturer. No cbjective evidence was available to indicate that the purchase and manufacture of air operators were in accordance wit?. contract requirements.
Interim Progress Valves for the noted contract have not been shipped. A hold on Atwood and Morrill equipment was initiated by TVA's Division of Purchasing on September 2, 1983 An audit of Komox Corporation, Tufline Division, Cincinnati, Ohio was conducted during the period December 6 and 7,1983, by the Atwood and Morrill quality assurance manager with surveillance performed by TVA's Office of Quality Assurance Design Quality Assurance Branch personnel. This review and audit of Tufline Division's quality assurance program determined that adequate controls were implemented for the manufacture of air actuator subassemblies.
Inspection and test activities will be performed by Atwood and Morrill on the assembled actuators to verify conformance to specification requirements. These tests will be documented and witnessed as required by TVA's Division of Engineering Design (EN DES) Quality Engineering Branch (QEB). The release of the valves is subject to acceptable TVA inspection results.
I e
h pbew
+4