ML20086N764

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 5.3.2, Control Rod Assemblies
ML20086N764
Person / Time
Site: Perry 
Issue date: 12/18/1991
From:
CENTERIOR ENERGY
To:
Shared Package
ML20086N761 List:
References
NUDOCS 9112240281
Download: ML20086N764 (2)


Text

.. -.... -..

~~

Q_

  • -u g.g 4
    • y PY-CEI/NRR-1419 L i.M

Attachment:

2

DESIGN' FEATURES

,2

~

DESIGN TEMPERATURE AND PRESSURE (Continued)

. b.

Maximum internal temperature:

1.

Drywe11 !330*F.

2.

Suppression.- pool 185'F.'

Maximum external to internal ~ differential pressure:

c.

1.

Drywell 21 psid.

2..

Containment 0.8 psid.

I-SECONDARY CONTAINMENT 5.2.3 j The secondary containment consists of the annulus between the shield --

building and' the primary containment and has a sinimus free volume of 392,548 cubic riet.-

it 5

5.3 ' REACTOR--CORE

' FUEL ASSEMBLIES =

5.3.1-The reactor shall-contain 748 fuel assemblies. Each assembly shall consist of a tr. atrix of Zircaloy clad fuel rods with an initial composition of slignely enriched uranium dioxide (UO = as fuel material. Fuel assenblies -

- I--..-

shall, be-limited to those fuel designs ahp) roved by the NRC Staff for use in ec

-BWR's.

i

' CONTROL R00 A;35EM8 LIES 15.3.21 The reactor core shall contain 177 control red' assembliesI kach mo.W skal y

. consi st4ee-of: a - cruciform array ofI-*2i-::

4;! ^ ' ~ --- --- -

r.O. 7 = r.;;;f -

2;r;; :;r;; ;, :p, p:d:7 22. ; ZM D : 0-"0" -^ c ': :I

  • 2i-!::: :tre! !N :"Af-neutron absorbing material'. Thecontrolmaterial-3 5.4 REACTOR C00l. ANT SYSTEM shall be boron carbide powder (5 c) and/or hafnius 4

metal and have a nominal absorber length of 143.7 w (~

!OESIGN PRESSURE AND TEMPERATURE M

5.4.1 ' The reactor' coolant system is designed and shall be maintain'id:.

In accordance with the code requirements specified in Section'5'.2' a.

of the FSAR with allowance for-normal degradation pursuant to. the applicable Surveillanca Requirements,

~

l-b.

For a pressure of:

1.

1250 psig on the suction side of the et 4 Aq..

rculation pump.

g7 PERRY - UNIT 1 5-4

  • mencem ':. 33 h

hf$bk O

P

PY-CEI/NRR-1419 L Page 2 of 2 CONTROL R0D ASSEMBLIES 5.3.2 The reactor core shall contain 177 control rod assemblies. Each assembl'; shall consist of a cruciform array of neutron absorbing material.

The control material shall be boron carbide powder (B 0) and/or hafnium metal 4

and have a nominal absorber length of 143.7 inches.

LCS/ CODED /5213

__,