. _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
o OPERATING DATA REPORT DOCKET NO.
50-286 DATE 02/02/a4 COMPLETED BY T.
Ke11v TELEPHONE (914) 739-8200 OPERATING STATUS
- 1. Unit Name: Indian Point No. 3 Nuclear Power Plant Notes
- 2. Reparting Period:
3n n"' n' - 1983
- 3. Licensed Thermal Power (MWt):
3025
- 4. Nameplate Rating (Gross MWe):
1013
- 5. Design Electrical Rating (Net MWe):
965
- 6. Maximum Dependable Capacity (Gross MWe):
1000
- 7. Maximum Dependable Capacity (Net MWe):
965
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 744 65,065
- 12. Number Of Hours Reactor Was Critical 61.a 61.8 34,4a6.3
' 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 2a
.2a 33.142.3
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 423.2 423.2 86,426,068.2
- 17. Gross E!setiical Energy Generated (MWH) s.0 5.0 26,366,615
- 18. Net Electrical Energy Generared (MWH) 0 0
25.244.17a
- 19. Unit Service Factor 04
.04 50.9
- 20. Unit Avail.ibility Factor
.04
.04 so.9
- 21. Unit Capacity Factor (Using MDC Net) 0 0
40.2
- 22. Unit Capacity Factor (Using DER Net) 0 0
40.2
- 23. Uplt Ferced Outage Rate 100 100 24.a
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
8402210058 840131 PDR ADCCK 05000206 R
PDR 25 If Shut Down At End Of Report Period. Estimated Date of Startup-26 Units in Test Status t Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 t
Indian Point i
UNIT No. 3 I
DATE 02/02/84 COMPLETED BY L-Kelly TELEPHONE (914) 739-8200 MONDI January 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) t Mwe. Net) 3 0
g7 0
2 0
18 0
3 0
39 0
4 0
20 0
-5 0
21 0
~6 0
22 0
0 0
7 33 8
0 34 0
9 0
0 25 0
0 10 26 11 0
37 0
12 0
0
- g 13 0
39 0
14 0
0 30 0
0 15 3,
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9 /77 )
t
50-286 DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME NO-3 DATE 2/2/84 COMPLETED BY L-Yn11v REPORT MONTH Januarv 1984 TELEPHONE 914-739-8200 e.
E E
.5 g 3
jY2 Licensee
,Ew
{*.
Cause & Corrective No.
Date g
3g j
jj5 Event p
pO Action to y:
j ;f3 g Report #
mU Prevent Recurrence H
g c5 03 830618 F
743.7 A
3 N/A N/A Electrical malfunction in the main j
main generator.
1 I
I 2
3 4
F: Forced Reason:
Method:
Exhibit F Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Eniry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI (1.ER) Fde INURI.G-D-Regulatory I!cstriction 4-Othes ( Explain) 0161)
E-Operator Training & ljcense Examination F-Administrative 5
G-Operational Error (Explain)
Estubit 11-Same Source 19/77) 11-01her (E xplain)
MONTHLY MAINTENANCE REPORT January 1984 MONTH WR# i DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION l
4044 1-03-84 Service Water Pump #37 -
Control fuse stabs Adjusted linkage and cleaned i
480. Volt Breaker do not close l
l 3968 1-05-8 Accumulator Level Trans-Valves leak Replaced valves l
mitter Isolation Valves l
4139 1-06-84 Vapor Containment 95' Air Inside door gasket leak Replaced gasket Lock Door 4022 1-06-84 Charging Pump #32 Packing leak Replaced packing 3723 1-07-84 Steam Generator #33 Packing leak Replaced stem and packing Blow Down Valve BD-1 3721 1-10-84 Steam Generator #31 Packing leak Replaced stem and packing Blow Down Valve BD-1 3722 1-20-84 Steam Generator #32 Packing leak Replaced stem and packing Blow Down Valve BD-1 3727 1-10-84 Steam Generator #34 Packing leak Replaced stem and packing Blow Down Valve BD-1 3996 1-12-84 Fan Cooler Units 31 Damper actuating arm Adjusted limit switches thru 35 Damper D does not travel to proper position 4140 1-12-84 Fan Cooler Unit #31 Breaker does not Adjusted linkage and cleaned close control fuse stabs 4145 1-12-84 Vapor Containment 80' Inside door gasket Adjusted gasket Airlock Door leak 3999 1-13-84 Boric Acid Transfer Shaft seal leak Rebuilt pump pump #32
MONTHLY MAINTENN!CE REPORT January 1984 MONTH
! WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION l4078 1-14-84 Boric Acid Heat Tracing Open Circuit Repaired viring Circuit 133 4080 1-14-84 Foric Acid Heat Tracing High temperature reading Adjusted thermostat Cicuit #54 4081 1-14-84 Boric Acid Heat Tracing Open Circuit Repaired viring Circuit #37 4137 1-14-84 Safety Injection Flow Flange leak Replaced studs and retor-Orifice FT-927 qued 4157 1-14-84 Fan Cooler Unit #34 Valve leak Replaced valve Service Water Valve SWN-43-D 3440 1-16-34 Containment Spray Pump Fump leak at studs Overhauled pump
- 32 3878 1-16-84 Residual Heat Renoval Mechanical seal leak Replaced mechanical seal Pump #32 4006 1-16 -84 Fan Cooler Unit #33 Motor cooler leak Installed new cooler Motor Cooler
?696 1-17-64 Charging Pump #31 Packing leak Repacked seals 4089 1-17-84 Radiation Monitors for Improper sample flow Replaced motor Vapor Containment R-11/R-12 4128 1-17-84 Fan Cooler Unit #32 Motor cooler leak Installed new cooler Motor Cooler
MONTilLY I & C CATEGORY I REPORT January 1984 Month W.R. #
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 1035 12-2-83 bream Generator #34 Temperature Improper reading Rewired detector Indicator 2471 1-6-84 Reactor Coolant Loop #31 Cold Improper reading Replaced span pot Leg Wide Range RTD T-413B 2446 1-7-84 Steam Generator Radiation Improper reading Rewired circuit Monitor R-19
I.
t
SUMMARY
OF OPERATING EXPERIENCE JANUARY 1984 Indian Point 3 was returned to service after a 227 day maintenance outage.
The generator was synchronized to the bus on January 31 at 2343 hours0.0271 days <br />0.651 hours <br />0.00387 weeks <br />8.915115e-4 months <br />'.
lew len Point 3 a
Nuclear Power Plant P.O. Box 215 Buchanan, New Wrk 10S11 914 739.8200
- D NewWrkPbwer
& Authority February 15, 1984 IP-LK-576 Docket No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of January, 1984.
Very truly yours, John C. Brons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 1P3 Reaident Inspectors' Office George Wilverding (SRC), WPO J. P. Bayne, WP0 S. V. Fuller. NYO W. R. Yario, NYO INP0 Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 4l t