-. Atta6hment to TXX 9142 Page 1 of 4 COMANCHE: PEAK STEAM ELECTRIC STATION, UNIT 1 N11C MONTHLY OPERATING REPORT' DOCKETNO:
50 445 UNIT:
CPSES1 DATE:
December 11,1991 COMPLETED BY:
Gre0 Thatcher TELEPHONE:
817 897 8223 OPERATING STATUS 1.
-Reporting Period: NOVEMBER 1991 Gross hours in reporting period:
22Q 2.
Currently authorized power level (MWI):
3.4.11 Max, depend, capacity (MWe Net): 11%
- Design Electrical Rating (MWe. Net):
1150 3.
_ Power level to which restricted (if any) (MWe Net):
UQNE 4.
Reasons for restriction (if any):
THIS MONTH YRTO DATE CUMULATIVE ~
5.
Number of hours reactor was critical 0
4906.85 7833.25 6.
Reactor reserve shutdown hours 0
1709.55 1982.45 0
4863.55 7729.25 7.
Hours generator on line 0
0 0
8.
Unit reserve shutdown hours 0
15.938,920 23,899,374 9.
Gross thermal energy generated (MWH) 0 5,208,683 7,873,683
- 10. - Cross electrical energy generated (MWH)
- 11. Net electrical energy generated (MWH) 0' 4.960,737 7,474,251
- 18. Reactor Service factor 0
61.2
-68.8
- 13. - Reactor availability factor 0
82.5 86.2-
- 14. - Unit service factor-0-
60.7 67.8 i
s
,15.
Unit availability factor _
0 60,7 67.8
- 16., Unit capacity factor (Using MDC)
+0 53.8 57.0 0
53.8 57.0
- 17. Unit capacity factor (Using Design MWe)
- 18. Unit forced outage rate _
0 13.2 11.3
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
- 20. If shutdown at end of repor1 period, estimated date of startup:
911210
' 21. Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 Ll:
L Estimated '
9112170020 911213
- DR-ADOCK 05000445 F D,s
- g_
+
Atiachment to fXX 91462 Pago 2 of 4
]
AVERAGE DAILY UNIT POWER LEVEL DOCKETtO:
60 445 UNIT:
CPSES 1
[ ATE:
December 11,1991 COMPLETED BY:
Greg Thatcher TELEPHONE
- B17 897-0223
~
MONTH: NOVEMDER 1991 CAY AVERAGE DAILY POWER LEVEL CAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWo Not) 1 O
g7 o
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9-0 25 0
10.
0 26 0
11 0
27 0
.12 0-28 0
13-0 29 0-l 14 0
30 0
15 0
31 16 0-
Att'achmont to TXX. 91462 Page 3 of.4 SUMM ARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO:
50 445 UNIT:
CPSES1 CMTE:
December 11,1991 COMPLETED BY:
Greg Thatcher TELEPHONE:
817 097-8223 MONTH: NOVEMBER 1@1 11/1 0000 Unn staded month in MODE 5.
11/7 1510 Commenced Coro Alterations.
11/11 1600 Core Roload Complete 11/22 0311 Entered MODE 5.
11/30 2400 Unit ended month in MODE 5.
Major work items:
RCP42 seat wo*, Re,nixe L 5 blades LP 2 turbine, Generator rotor upgrado, Diesel Generator overhaul, Snubber inspections, Steam Generator in service inspec1 ions.
l
i Attachment to TXX. 91462 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET?Q S0-445 UNIT:
CPSES1 DATE-Decer 11,1991 COMPLETED BY:
Greg Thatcher REPORT MONTH NOVEMBER 1991 PETHQDOF TYPE SHUTTING DO'AN Ff0RCED DURATK)N THEREACTOROR LO.
DATE SSCRDUtFD
! HOURS)
RaSCN REDUCNG PONER CORRECTWE At'.T, IONSCOf.T.91TS 010 911101 S
720 C
1 First Refueing Outage i
i L
i l
-l 1)
REASON
- 2) METHOO A-EQUIPMENT FA! LURE (EXPLAIN)
E. OPERATOR TPA!NING AND UCENSE EXN.t: NATION 1: P/ANUAL 8: MAINT OR TEST F: ADMIN STRATI'E 2: MANUALSCRAM C: REFUEUNG G OPERATiONALERROR(EXPLAFJ) 3: AUTOr/ATCSCRAM D: REGULATORY RESTRCTION H-OTHER(EXPLAW) 4: OTHER (EXPLAIN) i
.