Monthly Operating Rept for Nov 1991 for Comanche Peak Steam Electric Station,Unit 1
ML20086L670
Person / Time
Site: Comanche Peak 
Issue date: 11/30/1991
From: Thatcher G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20086L666 List:
References
NUDOCS 9112170029
Download: ML20086L670 (4)


Text

.

-. Atta6hment to TXX 9142 Page 1 of 4 COMANCHE: PEAK STEAM ELECTRIC STATION, UNIT 1 N11C MONTHLY OPERATING REPORT' DOCKETNO:

50 445 UNIT:

CPSES1 DATE:

December 11,1991 COMPLETED BY:

Gre0 Thatcher TELEPHONE:

817 897 8223 OPERATING STATUS 1.

-Reporting Period: NOVEMBER 1991 Gross hours in reporting period:

22Q 2.

Currently authorized power level (MWI):

3.4.11 Max, depend, capacity (MWe Net): 11%

  • Design Electrical Rating (MWe. Net):

1150 3.

_ Power level to which restricted (if any) (MWe Net):

UQNE 4.

Reasons for restriction (if any):

THIS MONTH YRTO DATE CUMULATIVE ~

5.

Number of hours reactor was critical 0

4906.85 7833.25 6.

Reactor reserve shutdown hours 0

1709.55 1982.45 0

4863.55 7729.25 7.

Hours generator on line 0

0 0

8.

Unit reserve shutdown hours 0

15.938,920 23,899,374 9.

Gross thermal energy generated (MWH) 0 5,208,683 7,873,683

10. - Cross electrical energy generated (MWH)
11. Net electrical energy generated (MWH) 0' 4.960,737 7,474,251
18. Reactor Service factor 0

61.2

-68.8

13. - Reactor availability factor 0

82.5 86.2-

14. - Unit service factor-0-

60.7 67.8 i

s

,15.

Unit availability factor _

0 60,7 67.8

16., Unit capacity factor (Using MDC)

+0 53.8 57.0 0

53.8 57.0

17. Unit capacity factor (Using Design MWe)
18. Unit forced outage rate _

0 13.2 11.3

19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20. If shutdown at end of repor1 period, estimated date of startup:

911210

' 21. Units in test status (prior to commercial operation):

ACHIEVED Commercial Operation 900813 Ll:

L Estimated '

9112170020 911213

  1. DR-ADOCK 05000445 F D,s
g_

+

Atiachment to fXX 91462 Pago 2 of 4

]

AVERAGE DAILY UNIT POWER LEVEL DOCKETtO:

60 445 UNIT:

CPSES 1

[ ATE:

December 11,1991 COMPLETED BY:

Greg Thatcher TELEPHONE

  • B17 897-0223

~

MONTH: NOVEMDER 1991 CAY AVERAGE DAILY POWER LEVEL CAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWo Not) 1 O

g7 o

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9-0 25 0

10.

0 26 0

11 0

27 0

.12 0-28 0

13-0 29 0-l 14 0

30 0

15 0

31 16 0-

Att'achmont to TXX. 91462 Page 3 of.4 SUMM ARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO:

50 445 UNIT:

CPSES1 CMTE:

December 11,1991 COMPLETED BY:

Greg Thatcher TELEPHONE:

817 097-8223 MONTH: NOVEMBER 1@1 11/1 0000 Unn staded month in MODE 5.

11/7 1510 Commenced Coro Alterations.

11/11 1600 Core Roload Complete 11/22 0311 Entered MODE 5.

11/30 2400 Unit ended month in MODE 5.

Major work items:

RCP42 seat wo*, Re,nixe L 5 blades LP 2 turbine, Generator rotor upgrado, Diesel Generator overhaul, Snubber inspections, Steam Generator in service inspec1 ions.

l

i Attachment to TXX. 91462 Page 4 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET?Q S0-445 UNIT:

CPSES1 DATE-Decer 11,1991 COMPLETED BY:

Greg Thatcher REPORT MONTH NOVEMBER 1991 PETHQDOF TYPE SHUTTING DO'AN Ff0RCED DURATK)N THEREACTOROR LO.

DATE SSCRDUtFD

! HOURS)

RaSCN REDUCNG PONER CORRECTWE At'.T, IONSCOf.T.91TS 010 911101 S

720 C

1 First Refueing Outage i

i L

i l

-l 1)

REASON

2) METHOO A-EQUIPMENT FA! LURE (EXPLAIN)

E. OPERATOR TPA!NING AND UCENSE EXN.t: NATION 1: P/ANUAL 8: MAINT OR TEST F: ADMIN STRATI'E 2: MANUALSCRAM C: REFUEUNG G OPERATiONALERROR(EXPLAFJ) 3: AUTOr/ATCSCRAM D: REGULATORY RESTRCTION H-OTHER(EXPLAW) 4: OTHER (EXPLAIN) i

.