Revised Monthly Operating Repts for Oct 1989 for Quad Cities Nuclear Station,Units 1 & 2,consisting of Refueling Info
ML20086L657
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/31/1989
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20086L639 List:
References
NUDOCS 9112170026
Download: ML20086L657 (3)


Text

. _ . _ _ _ ._ _ _ _ . . _ . _ . _ _ _ .. _ _ - _ _ . _. _ _ . - _ _ _ _ . _

QTP 300-532 Revision 2 QUA0 CITIES REFUELING October 1989 INFORMATION REQUEST 1

Unit: 41 Reload: 11 Cycle: __ __12

2. Scheduled date for next refueling shutdown: 9-5-92 - - _ .

3.

Scheduled date for restart following refueling: 12-5-92 4.

Will refueling or resumption of operation thereaf ter require a Technical '

Specification change or other license amendment:

UOT AS YET DETERMINED.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:  !

NOT AS YET DETERMINED. r

~

6.

Important licensing considerations associated with refueling e.g., new or different fuel design or supplier, unreviewed design or pe,rformance analysis methods, significant changes in fuel design, new operating procedures:

NONE AT PRESENT TIME.

i t

7. The number of fuel assemblies,
a. Number of assemblies in core: 724
b. Number of assemblies in spent fuel pool:  !

1405 8.

.The present licensed spent fuel pool storage capacity and the size of any increase in-licensed storage capacity that has been requested or is planned in number of fuel assemblies:

L j~ a.- Licensed storage capacity for spent fueli 3657

b. Planned increase in licensed storage: 0 9.

~The projected date of the last refueling that can be discharged to the

! spent fuel pool assuming the present _Ilcensed capacity: 2009, APPROVED-14/0395t

('""

1- OCT 3 01949 kbk21{gg{gyggggjg4 g,c,o,g,g, R_ PDR

- - _ - , - ~ . _ . _ _ - . . _ _ . , _ _ . _ . _ _ _ . _ _ _ . _ _ . . - . . _ _ . . _ _ _ _ . . _ _ . _ _ _ . . _ _ _ . . . _ _ . .

'O l QTP 300-S32 Revision 2 QUAD CITIES REFUELING October 1989 INFORMATION REQUEST

1. Unit: 02 Reload: 10 Cycle: 11
2. Scheduled date for next refueling shutdown: 01/01/92
3. Scheduled date for restart following refueling: 03/11/92
4. Hill refueling or resumption of operation thereafter require a Technical Specification change or other Ilcense amendment: Yes, as listed below:
1. Remove Table 3.7-2
2. Modification to turbine control valve fast acting solenoid valve.
3. Modification to llPCI turbine exhaust steam line.
4. IIPC1/RCIC 94-hour shutdown action provision.
5. Scheduled date(s) .'or submitting proposed licensing action and supporting informatism:
1. 01/15/92
2. 04/18/91
3. 06/28/91
4. 12/31/91
6. Important licensing considerations associated with refueling, e.g.. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

NONE AT PRESENT TIME.

7. The number o# fuel assemblies,
a. Number of assemblies in core: 724
b. Number of assemblies in spent fuel pool: 2287*
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned in number of fuel assemblies:
a. Licensed storage capacity for spent fuel: 3697
b. Planned increase in licensed storage: 0
9. The projected date of the last refue.ing that can be discharged to the spent fuel pool assuming the present 'icensed capacity: 2009
  • 152 new fuel assemblies in new fuel vault.

APPROVED

. I

( '"

14/0395t _" OCT 3 01989 l Q.C.O.S.R.

v VIII. GLOSSARY 4

The following abbreviations which may have been used in the Monthly Report, are defined below:

ACAD/ CAM - Atmospheric Containment Atmospheric .

Dilution / Containment Atnospheric Monitoring l

- American National Standards Institute ANSI APRM - Average Power Range Monitor ATHS - Anticipated T1ansient Without Scram BHR - Soiling Hator Reactor CRD - Control Rod Drive EHC - Electro-Hydraulic Control System i EOF - Emergency Operations facility l GSEP - Generating Stations Emergency Plan HEPA - High-Efficiency Particulate filter

- Licensee Event Report LER LLRT - Local Leak Rate Test LPCI - Low Pressure Coolant Injection Mode of RHRs LPRM - Local Power Range Monitor HAPLHGR - Maximum Average Planar 1.1near Heat Generation Rate MCPR - Minimum Critical Power Ratio HTLCPR - Hax1 mum Fraction Limiting Critical Power Ratto '

HPC - Maximum Permissible Concentration .

MSIV - Main Steam Isolation Valve >

NIOSH - National Institute for Occupational Safety and Health PCI - Primary Containment Isolation PCIOMR - Preconditioning Interim Operating Management Recommendations RBCCH - Reactor Building Closed Cooling Hater System i RBH - Rod Block Honitor RCIC. - Reactor Core Isolation Cooling System RHRS - Residual Heat Removal System RPS - Reactor Protection System RHH - Rod Horth Minimizer SBGTS - Standby Gas Treatment System SBLC - Standby Liquid Control SDC - Shutdown Cooling Modelof RHRS SDV - Scram Discharge Volume SRM - Source Range Monitor-TBCCH - Turbine Bu11 ding Closed Cooling Hater System TIP - Traversing Incore Probe TSC - Technical Sepoort Center i

l TS 14