Telecopy AO 74-10:on 740316,setpoint Shift Found on Switches PS-2-2-3-134C & 134D.Caused by Inability of Switch to Hold Precise Setpoints.Calibr Checked,Setpoint Reset & Checked in Accordance W/Surveillance Test
ML20086L527
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/18/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086L524 List:
References
AO-74-10, NUDOCS 8402080295
Download: ML20086L527 (1)


Text

'

7.M#

lhrch 18, 3974 N

h' (d'

~

y.r. Jaucc.P, O' 33y, Director thited Sintes Atozie. Energy Comission Nectornte of Regu3ntory Operationc 631 Park Avenue I

j Eing of Pruccias Penncyltarsia 19406 i

D.M eet:

Abnorm 1 Occurrence P'4-Hour liotification 7

}

{

Confirc.ing Mr. F.leicchtrom's convercation with Mr. E. Erunner, 4.E.C, j

Region 1 Regalatory Operntions Office on )hrch 17s 1974.

Referencta 1.icence llun.bor DTR 44, /cenhent ) tup.ber 1, Technical Specification hble 3 2. A

!. Report lio.:

hD-277-74-10 1

[

Import. Dat e:

Ihrch 18,19'?4 Occurrence Dste:

ihrch 16s 1974 hel)ity:

Pooch Botton-Atomic Power Station - Unit 2 i

R. D. 1 Deita Pennr.ylvania 17314 5

s 1

i 1

P 3dentifiention of Occurrence Betpoint chirt a on PS 2-2-3-1340 and P5-2-2-3-134D which isolates i.

the nnin nican 31nec if preware drops btaov 850 psig when in the run rode.

k l

ConSitiona Prior to Occurrence:

}

Plant stable at upproxinntely 3DW pover.

[

Dr.ccription of Occurrence:

{

Daring inctrur.ent curveiDance tentingc PS 2-2-3-1340 an$ PS-2-2-3-134D 1

trippu6 e oppro.xir.ately Sh pcic and 847 pcis rerpective)y inr, ten 6 of l

J. 650 prig en specified in the ' loch,Speen.

1 i

Designation of Apy.orent Cause of Coeurrenco:

j Innbility of evitch to hold precice netpoints.

[

halysis of Occurrences l

Setpoint chift of the nubject mediches vou'Jd not Inve defeated the

{

logic to proGuce the required actionc.

'The operable witches in cach channe) vou)61mve caused trips r,t the proper seipuints.

{

Seipoint chifte vere ninor enn have no safety inp'Jications.

F Corrective Actioni i

}

'the onlibration was che:heS. netpoint recet and checked 5n accordu.ce

[

vith the curveinance tect. The remaining cvitches in this logic were.

r checked ned found to b./ vithin the Tech Spec lititc.

)

l Pnilure Datn:

Setpoint chift c hrrvo occurred on this type of cecitch in other opp'lientionc.

fi'W8U f

b'. 7. UDrich. Daperintendent I

i Peneb Botto: Aton.ic Power Station i

.t j

e4020e0295 740321

~

g PDR ADOCK 05000277 s