ML20086L527
| ML20086L527 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/18/1974 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086L524 | List: |
| References | |
| AO-74-10, NUDOCS 8402080295 | |
| Download: ML20086L527 (1) | |
Text
'
7.M#
lhrch 18, 3974 N
h' (d'
~
y.r. Jaucc.P, O' 33y, Director thited Sintes Atozie. Energy Comission Nectornte of Regu3ntory Operationc 631 Park Avenue I
j Eing of Pruccias Penncyltarsia 19406 i
D.M eet:
Abnorm 1 Occurrence P'4-Hour liotification 7
}
{
Confirc.ing Mr. F.leicchtrom's convercation with Mr. E. Erunner, 4.E.C, j
Region 1 Regalatory Operntions Office on )hrch 17s 1974.
Referencta 1.icence llun.bor DTR 44, /cenhent ) tup.ber 1, Technical Specification hble 3 2. A
!. Report lio.:
hD-277-74-10 1
[
Import. Dat e:
Ihrch 18,19'?4 Occurrence Dste:
ihrch 16s 1974 hel)ity:
Pooch Botton-Atomic Power Station - Unit 2 i
R. D. 1 Deita Pennr.ylvania 17314 5
s 1
i 1
P 3dentifiention of Occurrence Betpoint chirt a on PS 2-2-3-1340 and P5-2-2-3-134D which isolates i.
the nnin nican 31nec if preware drops btaov 850 psig when in the run rode.
k l
ConSitiona Prior to Occurrence:
}
Plant stable at upproxinntely 3DW pover.
[
Dr.ccription of Occurrence:
{
Daring inctrur.ent curveiDance tentingc PS 2-2-3-1340 an$ PS-2-2-3-134D 1
trippu6 e oppro.xir.ately Sh pcic and 847 pcis rerpective)y inr, ten 6 of l
J. 650 prig en specified in the ' loch,Speen.
1 i
Designation of Apy.orent Cause of Coeurrenco:
j Innbility of evitch to hold precice netpoints.
[
halysis of Occurrences l
Setpoint chift of the nubject mediches vou'Jd not Inve defeated the
{
logic to proGuce the required actionc.
'The operable witches in cach channe) vou)61mve caused trips r,t the proper seipuints.
{
Seipoint chifte vere ninor enn have no safety inp'Jications.
F Corrective Actioni i
}
'the onlibration was che:heS. netpoint recet and checked 5n accordu.ce
[
vith the curveinance tect. The remaining cvitches in this logic were.
r checked ned found to b./ vithin the Tech Spec lititc.
)
l Pnilure Datn:
Setpoint chift c hrrvo occurred on this type of cecitch in other opp'lientionc.
fi'W8U f
b'. 7. UDrich. Daperintendent I
i Peneb Botto: Aton.ic Power Station i
.t j
e4020e0295 740321
~
g PDR ADOCK 05000277 s
8 S
PDR 5
l r
m