ML20086L526
| ML20086L526 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/12/1974 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086L524 | List: |
| References | |
| AO-74-9, NUDOCS 8402080294 | |
| Download: ML20086L526 (2) | |
Text
Peach lbtton Ato:dcDroworMe n
m Do3ta, Pennsylvania 2d n
[
{
y
, g. 0 hk March 12, 1974 l
t i
P i
Xr. Ja.v.es P. O'Eeilly, Director l
rnited Statec Ator.ic Energy Co::=ission Mrectorate of Regulatory Operationn QA Ttri: Avenue Eing of Prcenia, Pennsylvania 10406 fubject :
Abnorm 10:entrence 24-Mour !!otiff ention Cor,firr. ins ny convercation with Kr. R. A. Teil, A.E.C. Region.1 Regulatory Operations Office on March 12,3974.
Eeference:
Licenr.e Kunber IM 44, A:::endeent flunber 1, 'Icchniesl Spe-ifiestion
[c is'epori ho.:
50-277-74-9 P.eference Tab)e 4.2.B hport Dr.te:
3/32/74 0:currence Date:
}/13/74 heility:
Pcoch Potton Ato.wie Power Station Unit 2 R. D.1,141ta, Pennsylvania 37314 i
3dentification of Occurrence:
Conta:te of rehy 2LKB, of the autontic deprecturinstion syste:*,
in11ed to clo.9e per decign intent during surveilltmco tecting of the "E" nutonstic depreccurication systen logic.
~
Conditiono Prior to Occurrer.cei Reactor operatir.g at appror. ira.tely 2% power. 7ho high prescure coolant. injection synte:> vas inoptrable.
z Description of Occurrenco:
j After detemining that the high pret:sure coolant injection system vos inoperablo, testing vs.c performd on the automtio deproce.trization oystem in accordance with Technical Specification 4 5 0.2.
'No.
rart:any opcn contacto of rehq 2LKS fni. led to close when ceded Vpon to do no. 'ihe coil of thic relay is connected directly acrocs the "L" 125-volt d.c. bus which cupplies the nort:a1 power to the sycte.n's r
t
'%" logic.
If a power failure on the "B" but occurs, the relay do-energiros, twa nore. ally open contacts cloce, and power in transferre:i 4
J to the "A" 125-volt d.c. bus. Tocco contacto failed to close upo::,-
t i
simulatin;; a power feihre on the "B" buc.
c.l Designation of Apparent Cauce of Occurrence:
the IG'A type
' W@bbdsfM)$ tact stuck l
A spring lonied firepr contact on tho 3 f06Pc'S il rehy was found to be eticking in the
]
.in the cloning direction. it would preront, tinother contact fro:a closing.
If the contact stuck-in the opening recgig..g{ggvouldnotclose.-
s.
c..
. % t.g.,,.y,,.,.
]
~
~ 'O'3 M 3333
<. - 4 '. J..b'.db 4, t u..,.. -
.r
. <c r p
.e j...
..i
..*'.e t t i.6:
8402080294 740321
. m et.? '"1. e
?.:. M T.-
ti r ' I-
^ 1 '( " :..
L *' ;
PDR ADOCK 05000277 V.
'
- w m ~ ',; *s.'v d 1.* N....
V e v, 8
- N '
\\.
- l. A p s,'y -
a
. ;,. m u.
9. :5.. ;.< L.;, ;
- .. :b....y.,...
... l.
M t
m
O.. '.>
Analynia of Occurrenect 1
Tnc auto q"7.eprensurimtion system in d,c:;igned ruch-that no 9
i
~
ningle fui u c. such t.o the ono jue decer g d,. con render the j
i
.k,...g -
nyste.,.ir.cpertible.. Even if a povor. failure on.the "B" buo occurred, and the "L'" Icgic group van not capablo.of cvapping l
- l over to the otber power buc, a redundant.Iogic group "A" povered from the "A" bun, would c
- 113. Le capablo of. initiating the automatic l[)
depreccurimtior. system.
't c
I Corrective i.ction:
She oticking relay finger contact von adjusted co that it cloced.
'croner3y.. Tae entire reluy.nrnture was replaced and reteated
['..'.'
durir.g the reactor chutdovu followir.g the-loan of-power terc on Vll/74.
1,
!^
-),
Very truly yeuro.
L f
f R. 3. Fleir.c'r.:r. ann. II Accietant 5tperir.tendent Peach Ectta Ato:nic Power. Station-e e
e
.e e
E,
a