ML20086L472

From kanterella
Jump to navigation Jump to search
Forwards RO Insp Rept 50-278/74-04 on 740312-15 & Notice of Violation
ML20086L472
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/15/1974
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20086L448 List:
References
NUDOCS 8402080252
Download: ML20086L472 (2)


See also: IR 05000278/1974004

Text

api! 15 r*1

6

DocketNb.'50-278 {

.

Philadelphia. Electric 'ompany

i

Attention:

Mr. V. S. Boyer

License No. CPPR-38

Vice President

!

2301 lbrket Street

Philadelphia, Pennsylvania 19101

Centlemen:

This refers to the inspection conducted by Mr. Allentuck of this office

on March 12-15, 1974 at the Peach Bottom Atomic Power Station

of activitics authorized by AEC License No. CPPR-38 and to

the discussions of our findings held by Mr. Allentuck with

Mr. Valentino of your staff at the conclusion of the inspection.

I

Areas examined during this inspection are described in the Regulatory

Operations inspection Report which is enclosed with this letter.

.

Within t:ase areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel,

and observations by the inspector.

In addition, our inspector examined those activities conducted under

,

your license relating to the subjects cov'ered in your letters to Mr.

O'Reilly dated February 1 and March 8, 1974. We have no further

questions regarding these matters.

During this inspection, it was found that one of your activities

I

appeared to be in violation of an AEC requirement. The item and

reference to the pertinent requirement are listed in the enclosure

to this letter. This letter constitutes a notice o nt to you

pursuant to the provisions of Section 2.201 of the AEC's " Rules-

of Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within 30 days

'of your receipt of this notice, a written statement of explanation

.in reply, including: (1) corrective steps which have been or will

be taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the date

when full compliance will be achicved.

In accordance with Section 2.790 of the AEC's " Rules nf Practice",

Pari 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

AEC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to. be proprietary, it is

nece'ssary'that'you make a written application within 20 days to

this office to withhold such information from public disclosure.

.

8402080252 740605

PDR ADOCK 0500027

S

,

k

l

-_

- . , . . . ,

. -

g

-

m

-

3

-- ~

'l

y

)

'

,

3[.

-

~

.

.+

s

4

,

___ _ . _ _ _ .

-

-

_=---

v.

. - -

-

.

O

O

Philadelphia Electric Company

-2-

.

-

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a

separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be

placed in the Public Document Room.

-

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

Robert T. Carlson, Chief

Facility Construction and Engineering

.

Support Branch

Enclosures:

1.

Description of Violations

2.

R0 Inspection Report No.'50-278/74-04

.

l

- -- - - - -- -

- - - - - - - - -

-

.

.bec (w/cncis):

.

"O Chief, FS&EB

RO:HQ (5)

DL (4 w/cncis plus 9 cys of Report Only)

DR Central Files

RS (3)

PDR

Local PDR

R0 Files

NSIC

DTIE

Stat.e of Pennsy.lvania

OGC

.

.

6

_ _

_

. _ . _ _ _ _ - - - -