ML20086L123

From kanterella
Jump to navigation Jump to search
Telecopy AO 73-29:on 731224,RCIC Turbine Tripped Three Times for Unknown Reasons.Caused by Improper Adjustment of Mechanical Linkage in Overspeed Mechanism.Reactor Will Remain Depressurized Until Trip Problem Resolved
ML20086L123
Person / Time
Site: Peach Bottom 
Issue date: 12/24/1973
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086L121 List:
References
AO-73-29, NUDOCS 8402070405
Download: ML20086L123 (2)


Text

. _.

u,G * >

A. $. YW Dmcccher.,4,.19n u

& /.S~- 3 3 7- //.S~C

/

K o2 A 3 foI kir. James P O'Reilly, Director f

h7]$

United Statco Atomic Ibergy Co:::,,icsion Directornto of Regulatory Operatione 6.31 Fark I. venue

~

King of Pruscin, Penneylvhnik 19406 Euhicet:

Abnore.s3_ Occurrance 24-Hour Unti riention Confir. ing my telephone conversation wi+.h Mr. Paul Uc3 con, A.E.C. Region I Heguistory Office on December 2% 1973 Reference *. I.icense Number DFBdh, kendr:ent Number 1, Technical Specification Paragraph 3 5.D.'l

(

On Dcec-ber 24, 1973 Vith the reactor pover at approximtely 3%, the 1C10 turbine wha operated on severkl oceanions to support Teosci injection

'teste. on the ROIC system. During this testinC program the ROIC turbinc

=

' tripped three times for unknown reasons. On each occceion the turbine vos r*=et from the control root and rentarted.

Initial invoatigation indicaten ths.t the mechanical linkage in the overspoed occhnnie:s msy be improperly ad. justed. Finn 1 investication and recolution is avaiting nrrival of the rnnuructurer's reprenentative. Following the successful co:pletion of the PCIC vessel injection test program tbc reactor vse shutdown to pernit work nasociated with the min turbint generator to proceed. The re.ictor chall ree. sin derire.ncurir.ed until tbs itCIC turbine trip probicm in resolved.

!Wf b W. 't. U.tirich, Superintendent Peach Botton Atomic Power ttation.

8402070405 740102 PDR ADOCK 05000277 S

PM Q

1 p

., f

'^

L - % 1._ % k is&L.

P lo o

il 3

5?

-'i

,a

.a MEMO ROUTE SLIP 5*****="N*.

cec ="* ace-

'a *"ia-f orm AIC-94 I Rev. kf av I4,1947) AI Ol 0240 For lgastu e.

For lafore etten, N ote saa retura r

To (nam.ano vait3 i= riats atuaans PillIADELPilIA ELECTRIC COMPANY R0 Chief, FS&EB RO:llQ (5)

PEACil BOITOM 2 RO Files o,,,

Central Mail & Files A0 73-29 Regulatory Standards ni TO (Name and waits imTia s m'=^ans Directorate of The above abnormal occurrence is forwarded for Licensing (13) inf rmation.

Distribution will be made by this OGC 04T:

Regional Directors (37, 777, jy) office to the PDR, I,ocal PDR, NSIC, DTIE, and To,twam. ana waits i= r m.s at=aans State Representatives af ter review by the licensee for proprietary information.

can FROM (Name and wait) atMaans a f fw

~-

E. J. Brunner Region I PMoht McA 0471 8-337-1246 1/9/74 om, i.,, o...,..;

m ointa s.os ron noomo s atens

)

A i

ii I

3 1

~

s

.o

  • t '

p an;.

f

)

y 4

a

.'