Text
c
)
N W!.iJg' '. -
... :6 c.
4$ xJ.
Q I,%sch Bottos Atomic Power tion 3,1
?
Delta, Pennsylvania eOS' S 5 "YY8D &
m
~~
f. f),ie
.YL h 17314
- I d*
May 28, 174 l..
Mr. James P. O'Reilly, Director b
United States Atomic Ibergy Comaimaion Directorate of Regulatory Operations y
631 Park Avenue j
King of Prussia, Pennsylvania 19406 i
Subject:
Abnormal Occurrence 24-Hour Notification Confirming my conversation with Mr. A. D. Toth, A.E.C. Region 1 Regulatory j
Operations Office on May 26, 1974.
t
Reference:
License Number DPR 44, Amendment Number 1 i
Technical Specification Table 4.2.A Report No.:
50-277-74-28 Report Date:
May 26, 1974 1
Occurrence Date May 25, 1974 i
I Facility:
Peach Bottom Atomic Power Station R.D. 1, Delta, Pennsylvania 17314 Identification of Occurrence:
E-Failure of APIS-2-2-ll8D to trip consistently J
Conditions Prior to Occurrence:
j Plant operating at close to rated power.
i 4
Description of Occurrence:
[!
During a functional instrument surveillance test, dPIS-2-2-118D, a
]
PCIS Group I input on Main Steam Line High Flow, failed to trip consistently. This switch monitors steam flow in the "C" Main Steen Line.
l
(
Designation of Apparent Cause of Occurrence:
Improper "as built" positioning of the mercury bulb type reed switch arch that the magnet would not fully pick up the reed consistently.
I When the switch did function, however, it did function at the proper setpoint.
d Analysis of Occurrence:
I A
There are no safety implications associated with this occurrence since its companion switch in a one-of-two-twice logic on the same t
j!
steam line had just been tested and found fully operable.
Corrective Action:
The mercury bulb was repositioned to provide positive and consistent operation. The device was recalibrated and tested per t':e calibration check type of surveillance test which includes a functional test. On May 27, 1974, the other 15 similar switches were inspected for a afeitar l
problem, and functionally tested with no failures and no adjusteente s
necesamry.
ij
$7 N
l O
PDR c i q
M
.$h$ di..l@ '~
~
, [j;.
, ijd(~,,9f;2; dig o.
O
- $j hilure Data
U
'm ',, i
{
A functional failure of a similar switch was reported as an Abnormal l-occurrence on september 6, 1973
-4
'+
i.
NNM
{l W. T. Ullrich, Superintendent i.
Peach Bottom Atomic Power Station i
k 5
4 5
s 4
I i
a h
I i
,