Telecopy AO 74-28:on 740525,switch DPIS-2-2-118D Failed to Trip Consistently.Caused by Improper as-built Positioning of Mercury Bulb Type Reed Switch.Mercury Bulb Repositioned to Provide Positive & Consistent Operation
ML20086K924
Person / Time
Site: Peach Bottom 
Issue date: 05/28/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086K917 List:
References
AO-74-28, NUDOCS 8402070078
Download: ML20086K924 (2)


Text

c

)

N W!.iJg' '. -

... :6 c.

4$ xJ.

Q I,%sch Bottos Atomic Power tion 3,1

?

Delta, Pennsylvania eOS' S 5 "YY8D &

m

~~

f. f),ie

.YL h 17314

I d*

May 28, 174 l..

Mr. James P. O'Reilly, Director b

United States Atomic Ibergy Comaimaion Directorate of Regulatory Operations y

631 Park Avenue j

King of Prussia, Pennsylvania 19406 i

Subject:

Abnormal Occurrence 24-Hour Notification Confirming my conversation with Mr. A. D. Toth, A.E.C. Region 1 Regulatory j

Operations Office on May 26, 1974.

t

Reference:

License Number DPR 44, Amendment Number 1 i

Technical Specification Table 4.2.A Report No.:

50-277-74-28 Report Date:

May 26, 1974 1

Occurrence Date May 25, 1974 i

I Facility:

Peach Bottom Atomic Power Station R.D. 1, Delta, Pennsylvania 17314 Identification of Occurrence:

E-Failure of APIS-2-2-ll8D to trip consistently J

Conditions Prior to Occurrence:

j Plant operating at close to rated power.

i 4

Description of Occurrence:

[!

During a functional instrument surveillance test, dPIS-2-2-118D, a

]

PCIS Group I input on Main Steam Line High Flow, failed to trip consistently. This switch monitors steam flow in the "C" Main Steen Line.

l

(

Designation of Apparent Cause of Occurrence:

Improper "as built" positioning of the mercury bulb type reed switch arch that the magnet would not fully pick up the reed consistently.

I When the switch did function, however, it did function at the proper setpoint.

d Analysis of Occurrence:

I A

There are no safety implications associated with this occurrence since its companion switch in a one-of-two-twice logic on the same t

j!

steam line had just been tested and found fully operable.

Corrective Action:

The mercury bulb was repositioned to provide positive and consistent operation. The device was recalibrated and tested per t':e calibration check type of surveillance test which includes a functional test. On May 27, 1974, the other 15 similar switches were inspected for a afeitar l

problem, and functionally tested with no failures and no adjusteente s

necesamry.

ij

$7 N

l O

PDR c i q

M

.$h$ di..l@ '~

~

, [j;.

, ijd(~,,9f;2; dig o.

O

$j hilure Data

U

'm ',, i

{

A functional failure of a similar switch was reported as an Abnormal l-occurrence on september 6, 1973

-4

'+

i.

NNM

{l W. T. Ullrich, Superintendent i.

Peach Bottom Atomic Power Station i