Telecopy AO 74-7:on 740305,MSIV Closing Time Exceeded Max Permissible Operating Time & Drywell Floor Drain Sump Pump Ouboard Isolation Valve Failed to Close on Group II Isolation Signal
ML20086K918
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/06/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086K912 List:
References
AO-74-7, NUDOCS 8402070074
Download: ML20086K918 (1)


Text

i. /J  !

, S

  1. Pili!ALEIJ3IA EIETRIC CCA!W Peach Botto: Ato:ic Power Station J- Lelta, Penncylvania
  • h

' ~

17314

. g .g .

March 6, 1974 Mr. Jameo P. O'Reilly, Director d / 6 3 3 7 / / [ ()

United States Atomic Energy Co=:icsion Directorate of kcguistory Opcrations

! 631 Fark Avenue Eing of Prucsin, Pennsylvanis 19406

Subject:

Abnorent Oecurrence 24-Eaur Notification I Confirmir.g t:y conversation with Mr. R. A. Teil, A.E.C. Region 1 Regulatory i

Operatiene Office on March 6, 1974

Reference:

Licence Number DPR 44, Anendment Number 1, Technical Specifiestion Table 3 7.1

Report No.
. M-277-74-7

/

Report Date: 3/6/74 Occurrence Date: 3/5/74 Facility: Peach Bottc= Ato:ic Power Station - Unit 2 R. D. 1, Delts, Pennsylvania 17314 Identificatien of Occurrence:

A. A rain steam isolation valve closing time slightly exceeded the muicum per=issib,le operatir.g time. . .

B. The drywe'll floor drain c/q pump outboard isolation valve failed to close on a Group II isolation signal. .-

Conditions Prior to Occurrence:

Reactor at approximately 2 % power and stable.

Main eteam isolation test initiated.  ;

g W a.

Lescription of Occurrence:

A. kring the main stese line isolation tect initiated from 2% power, f

g all rain steam isolatior. valve clocur.e times were recorded. Tne closing tioe for A0-2-2-60A vns 31 seconds. Thio exceeds the r:axicum allowable operatir.g tire of 5 seconds provided in the hac Technical Specifications.

88 B. Mrir.g the Group II isolatien cauced by low reactor vessel level

^$ following the isolstion of. the main steam lines. A0-2-S3. .the l outboard icolation valve for the drywell floor drain sump pu=p failed h -

to cloce.

Desirr.ntion of Apparent Cause of Occurrence:

A. The cause for the slight change in valve closing speed. hse r.ot been- ,

identified to date.

s , tj B. Preliminary investigation indicates that the solenoid valve ac:meiated ~

}y / fI 3 t') with A0-2-33 failed to port properly when the'colenoid vsa de-energined.

i.

1 M# 4 Ar.alyeie of Occurrence:

A. Main steam line isolation was properly. acco:rpliched within the allowable tite frr. .e during the i test. The small' increase. in operating tiee of the -

n -1 . u . . .s_.o 4 a 4 .u ...

Ar.nlycie of Cer rence: (Cont'd)

,* E. The fl[j drain cu=p purp diccharge li:p\nc v both an inboard and outboard icolation valve. Proper operation of the inboard vnive no a recult of the Group II icolation cignal properly icolated thic

. line. No nafety significnr.ce is attached to this occurrence.

. Corrective Action:

A. 16I7 A0-2-2-30A chall be adjusted, stroke tested and tired prior to reactor stort-up.

B. Proper operation of A0-2-33 will be verified following repair or replaccccnt of the associated solenoid valve.

M dd7M W. T. Ullrich, Superintendent Pench Bottom Ato ic Power Station.

e e

e 4

J l 4

O  : l G S /

t .

1 4

q swa.

MEMO ROUTE SLIP l Sa '""6a'a*- ' o" oac a"'a". Fa *"-

n.,m ric_ n inn. % n. wm aroi ono F n , . . 4 ,,, o , . r o, . ico .,,,.. X r ,'i ", ,",,- . n o,.

L To (e..mo .,d o n.t) inmAts asMARus i

RO:llQ (4) PilIIADELPilIA ELECTRIC CO.

R0 Chief FSEEB DL (4) e,. t . PB-2 RO Files j DR Central Mail & Fil as A0 74-7 TO (Name and unit) in 11 ALS RLMAAAS The above A0 is forwarded for information.

OGC o,,, Distribution will be made by this office

to the PDR, Local PDR, NSIC, DTIE, 1 TO (Name and unst) INinALS RLMAAfd
and State Representatives, t

DATE F ROM (Name and unit) RE M ARK 5 Of O t$t%,

C>J;'

'f . J. B ru nne r Region T i PHOhE NO. DATE

8-337-1246 3/11/74 4

VSE OTHER SIDE FOR ADDITIONAL REMAPK$ GIO i 1$75 0 44b44 9 f s --

1 I-4

^

. \

. Ed .

s

/

.*  ; a:

e, f.

l Y._