ML20086K565
| ML20086K565 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/10/1994 |
| From: | Bockhorst R, Castello T, Quinn E SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML20086K501 | List: |
| References | |
| J-SEA-012, J-SEA-012-R00, J-SEA-12, J-SEA-12-R, NUDOCS 9507200204 | |
| Download: ML20086K565 (91) | |
Text
_
Southern California Edison Company CALC NO, ICCN NO1 PAGE TOTAL NO. OF 1
!NTE"'" CALCL'L^ NOM J-SEA-012 CF^NCE NOME (!CCN)!
CALCULATION CHANGE BASE CALC. REV.
UNIT CCN CONVERSION:
CALC.REV.
/
g 0
2&3 CCN NO. CCN-NOTICE (CCN)
CALCULATION
SUBJECT:
NI SubChannel Amplifier, Analysis of Calibration Data CALCULATION CROSS-INDEX ENGINEERING SYSTEM NUMBER / PRIMARY STATION SYSTEM Q-CLASS O New/ Updated index included DESIGNATOR N/A
/ SEA II E Existing index is Cornplete DATABASE IN ACCoRDANCE WITH O ALSO, LISTED BELOW
- 1. BRIEF DESCRIPTION OF NM M OPROGRAM ODATABASE ICCN/CCN:
in Revision 0 of this calculation, the degrees of freedom were reversed when the selection of the values for the F statistics were made. This resulted in selection of lower values for the F statistic than those which would have been celected if the degrees of freedom had not been reversed. Correcting the values of the F statistic based on the correct order of the degrees of freedom results in a lower value for the lower bounding probability value. This correction does not impact the recommended drift allowance when calibrated at monthly intervals, which is the currently required surveillance interval for the linear excore nuclear instrumentation. Therefore, no Non-conformance report is required. However, it does result in slightly higher recommended drift allowances if the surveillance interval were to be increased to quarterly or 120 day intervals. A DCN to SO23-944-C90-0 is required to reflect these changes.
The correlation between the pages of this CCN and the pages of Revision 0 of this calculation is as follows.
CCN Page 1 No corresponding page in Rev 0 CCN Page 2 Page it of Rev 0 CCN Page 3 Page 24 CCN Page 4 Page 27 CCN Page 5 Page 30 CCN Page 6 Page 33 No new pages are added to the calculation by this CCN.
d8 R8' Oo 30 10 0' O INmATING DOCUMENT (DCP/MMP, FCN, OTHER)
None Rev.
Ob l
NO O@
- 2. OTHER AFFECTED DOCUMENTS (CHECK AS APPLICABLE FOR CCN ONLY);
N b.
' g E YES O NO OTHER AFFECTED DOCUMENTS EXIST AND ARE IDENTIFIED ON ATTACHED FORM 26-503.
o' Q. O,.
- 3. APPROVAL:
DISCIPLINE / ESC: NEDO CONTROLS R. M. Bockhorst 82731 C
"f:' " (JM"~%T^*
Ad@*d*#"M
""MM s
1RE (Print nameliniusi) PAX NES&L DM (Sgnature)
/ ~ 6ste
/
l 4. ASSIGNED SUPPLEMENT ALPHA DESIGNATOR:
'M [YT,f CONVERSION TO CCN DATE SCE CDM-SONGS
NES&L DEPARTMENT ICCN N0/
CALCULATION SHEET PRELIM. CCN NO. N-1 PAGE 2 0F 6
CCN CONVERSION:
Project or DCP/MMP N/A Calc No, J-SEA-012 CCN NO. CCN-l Subject N1 Subchannel Amolifier. Analysis of Calibration Oata Sheet No.
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE BOCKHORST 11/29/93 OUINN 12/13/93 REV IND 2.O RESULTS/ CONCLUSIONS 2.1 Results Table 2.1 summarizes the results of this calculation.
When tested at monthly, quarterly, and four month intervals, the expected maximum change in calibration of the subchannel amplifiers is i 50, i 75, i 90 millivolts, respectively, at
'a 95% probability, 95% confidence interval.
Table 2.1 Monthly Quarterly 4 Month Points, n 1072 1010 954 Average
-0.0003
-0.0009
-0.0017 Std Dev 0.0295 0.0415 0.0500 Max Crit 0.050 0.071 0.087 Min Crit
-0.050
-0.071
-0.087 Above 18 16 13 Below 16 16 17 Within, x 1038 978 924 x/n 96.83%
96.83%
96.86%
Upper 97.96%
97.97%
97.99%
Lower 95.12%
95.09%
95.12%
2.2 Conclusions The purpose of this calculation has been achieved in that the maximum expected change in calibration of the subchannel amplifiers has been determined on a monthly, quarterly, and four month basis.
The results of this calculation are consistent with the assumptions in the CPC input uncertainty calculation (Reference 6.11) when tested on a monthly basis.
4 NES&L DEPARTMENT ICCN N0/
CALCULATION SHEET PRELIM. CCN NO. N-1 PAGE 3 0F 6
CCN CONVERSION:
Project or DCP/MMP N/A Calc No.__J-SEA-012 CCN NO. CCN-l Subject NI Subchannel Amplifier. Analysis of Calibration Data Sheet No.
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE BOCKHORST 11/29/93 OUINN 12/13/93 REV IND l
8.1.2 Limits / Probability
)
The following table shows that the changes in calibration of the subchannel amplifiers will be less than 50 millivolts when calibrated on a monthly basis.
Table 8.1 Monthly Total l
Points, n 1072 Average
-0.0003 Std Dev 0.0295 Max Crit 0.050 Min Crit
-0.050 Above 18 Below 16 Within, x 1038 x/n 96.83%
2(x+1) 2078 2(n-x) 68 F, upper 1.57 2(n-x+1) 70 2x 2076 A
u F,
lower 1.52 Upper 97.96%
Lower 95.12%
NES&L DEPARTMENT ICCN N0/
CALCULATION SHEET PRELIM. CCN NO. N-1 PAGE 4 0F 6
CCN CONVERSION:
Project or DCP/MMP N/A Calc No.
J. SEA-012 CCN NO. CCN-l Subject Ni Subchannel Amplifier, Analysis of Calibration Data Sheet No.
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE CATE BOCKHORST 11/29/93 OUINN 12/13/93 4
v2 - 2
- 1038 v2 = 2076 From Section 5, 100 * (1-a)
Confidence interval, %
=
100a
]
100 95%
=
Solving for a, 100a
= 100 - 95
=5 l
a
= 5/100
.05
=
- Thus, a/2 =.05/2 =.025 From Section 5, x/ [x+ (n-x+1)
- F./2,2. (n-x.u,2 xl P
=
i From Table 4, Reference 6.9, Fa.o2spo,2au = 1.52 Substituting, 1038 / [1038+(1072-1038+1)*1.52]
'n' P
=
3 1038 / [103 8+ (3 5) *1. 52]
P
=
t 1038 / (1038+53.20]
P
=
2 1038 / 1091.2 P
=
i 0.951 or 95.1%
P
=
i
4 NES&L DEPARTMENT ICCN N0/
CALCULATION SHEET PRELIM. CCN :4. N-1 PAGE 5 0F 6
CCN CONVERSION:
Project or DCP/MMP N/A Calc No. J-SEA-012 CCN NO. CCN-l Subject NT Subchannel Amplifier, Analysis of Calibration Data Sheet No.
l REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE BOCKHORST 11/29/93 QUINN 12/13/93 REV IND 8.2.2 Limits / Probability The following table shows that the changes in calibration of the subchannel amplifiers will be less than 75 millivolts when calibrated on a quarterly basis.
Table 8.2 Quarterly Total Points, n 1010 Average
-0.0009 Std Dev 0.0415 Max Crit 0.071 Min Crit
-0.071 Above 16
^,s Below 16 Within, x 978 x/n 96.83%
2 (x+1) 1958 2 (n-x) 64 F, upper 1,58 2 (n-x+1) 66 2x 1956 F,
lower 1.53 Upper 97.97%
Lower 95.09%
NES&L DEPARTMENT ICCh NU/
CALCULATION SHEET PRELIM. CCN NO. N-1 PAGE 6 0F 6
CCN CONVER$10N:
Project or DCP/MMP N/A Calc No. J-SEA-012 CCN NO. CCN-l Subject NI Subchannel Amolifier Analysis of Calibration Data Sheet No.
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE BOCKHORST 11/29/93 OUINN 12/13/93 REV I
IND 8.3.2 Limits / Probability The following table shows that the changes in calibration of the subchannel amplifiers will be less than 90 millivolts when calibrated on a 120 day basis.
Table 8.3 4 Month Total Points, n 954 Average
-0.0017 Std Dev 0.0500 Max Crit
'O.087 Min Crit
-0.087 Above 13 A
Below 17 Within, x 924 x/n 96.86%
2 (x+1) 1850 2(n-x) 60 F, upper 1.58 2 (n-x+1) 62 2x 1848 F,
lower 1.53 Upper 97.99%
Lower 95.12%
ICCN NO./
PREuN. CCN No.
nCE or CALCULATIONTITLEPAGE CCN CONVERSION:
CCN NO. CCN-DCP/MMP/FIDCN/FCN No. & Rev. N/A Cate. No.
J-SEA 012 Sheet i
ubject N1 Subchannel Aretifier. AnatYSIS of Calibration 08t8 S
b / SEA SONGS Unit _ 2 and 3 Q Class II ystem Ntriber/ Primary Station System Designator S
NO YES, Section No,_ 3/4 Tabte 4.3-1
_ Equipment Tag No._ Various Tech. Spec. Affecting?
PROGRAM / DATABASE NAMES VERSION / RELEASE NO.(S)
CONTROLLED hPROGRAM ALSO, LISTED BELOW DATABASE OC /
N/A DATABASE IN ACCORDANCE WITH NES&L 41-5-1 RECORD OF ISSUES APPROVED TOTAL PREPARED SHTS.
(Print name/ initials)
(Signature) p DESCRIPTION o
GS Other ORIG.
85
- ontrols Initial Issue E. L Quinn p
j/
3 ORIG.
GS y
Other DATE IRE DM Other GS ORIG.
DM DATE IRE Space f or RPE Stanp, identify use of an alternate cate., and notee, te arct icable f
O DCP completion and turnover acceptance to be verified by This cale, was prepared for the identified DCP/MMP. receipt of a memorandum directing DCN Conversion.
Memo date by EGE 46-141-1 REV. Y/Y1
.t ecN F
aC 0
fD r
2 2
er 0
0 t o n
k k
iMN' ms ms f
CC ea ee d
tCD t t tt i
4 ie u
I I
A P
t ptF t n g5 gs NN 0
uer o
o 1C omo L2 1
2 5
5 S
u.
K0 K0 RC yc E
f ov A -
A -
N.
ide R2 R2 V
t/R T9 T9 OO nc/
O-O-
C N el N~
DS DS daC EM EN icT NR NR MM C C CC O
t N
up t
t n
N u
e C
o m
- i. C eu
?jn
- eccaoeo,
- htfdri, O
S S
N N
r/is E
E secui Y
Y l
M l ett qv C E onaee C R Dicrr iP 2
g o
n N
i 0
0 tc ca ef v
jr e
o ste R
N sn i
t e
hes e
tst e
en h
fhe ot m S
r u
a snc Mnio o d o
ruid N
cser uso t
l u/
n c
d e
nen m
ora u
0 ca c
s o
0 0
dnn D
9 7
noo
/
C 4
ait c
tt 4
3 l
sae a
4 2
C 9
0 tlt uu S
lucc 3
sll 2
0 X
eaa 0
3 Rcc 5
0 EDN I
e t r S
rci a
o S
o e p n, N.
/jsdbeo O
nt ri v
as t
e R
ya R
senl nh a u C
ot c
dl i
N t oea at sc O
l i
Sut vt I
T cuec ul pre T
ran o
j cifd N
i A
I i
ge a
t L
ndd n
ii ne a
cvah m
U 2
ao
,t a
h 1
f r C
0 rpnf e oo L
t si A
nt t n c
A E
neo l
I eti o
S em us C
C a
st ei e
ect v n
J hoae o
Tdcr M
1 o
9 N
/
9 d
n
.de rn V
vnlboa E
o ea s
R i
r ii se s
7 t
r vt t 4
. e n rea 0
2 a
cbo el d 4
p a a s pt l
l i
6 u
Cn easn 2
c r
i l
EC a
S C
- l f
1 l
ii il!1 1
4
i i
NES&L DEPARTMENT 1
ICCN N0/
PRELIM. CCN NO.
PAGE _ 0F _
CALCULATIONSHEET GCN GGNVER 5Ic h :
Project or DCP/MMP N/A Calc No.
J SEA 012 CCN NO.
CCN-Subject Ni subchannel Cain Calibration As Found / As-Left Data Sheet No.
3 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE REV D
BOCKHORST 09/07/93 QUINN 09/10/93 IND TABLE OF CONTENTS 4
1.0 PURPOSE 4
1.1 Purpose 4
1.2 Background
7 1.3 Nuclear Instrumentation System 10 1.4 Technical Specifications 12 2.0 RESULTS/ CONCLUSIONS 12 2.1 Results 12 2.2 Conclusions.
13 2.3 Recommendations.
13 2.4 Limitations 13 2.5 Interfacing Calculations, Documents and Drawings 14 3.0 ASSUMPTIONS 14 Assumptions Which Do Not Require Verification.
3.1 14 3.2 Assumptions Which Require Verification 14 3.3 Judgements and Decisions 15 4.0 DESIGN INPUT DATA 16 5.0 METHODOLOGY 16 5.1 Data Recovery.
16 5.2 Determination of Drift Values 19 5.3 Analysis of Drift Data 21
6.0 REFERENCES
23 7.0 NOMENCLATURE.
24 8.0 COMPUTATIONS.
24 8.1 Monthly Data Analysis 30 8.2 Quarterly Data Analysis 33 8.3 Four Month Data Analysis 36 l
APPENDIX A
NES&L DEPARTMEN7
!CCN N0/
CALCULATIONSHEET PRELIM. CCN No.
PAGE _ 0F _
GGN GONVER51CN Project or DCP/MMP N/A Calc No.
J SEA 012 CCN NO.
CCN-Subject NI Subchemet Gain Calibration As Found / As Lef t Data Sheet No.
4 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE D
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND 1.0 PURPOSE 1.1 Purpose i
l This calculation describes an analysis of the calibration history of the Nuclear Instrumentation (NI) Excore Linear Power Channels at the San Onofre Nuclear Generating Station (SONGS) Units 2&3.
The purpose of this calculation is to determine the maximum drift in the linear subchannel gain amplifiers that can be expected to occur based on nominal monthly, quarterly and four month test intervals.
This calculation is intended to be used as a reference document l
for the justification of extending the surveillance test interval (STI) for the NI instrumentation from the current technical specification requirement of monthly intervals to quarterly or four month intervals.
1.2 Background
The Combustion Engineering Owners Group (CEOG) sponsored an effort to justify the extension of the monthly PPS testing to quarterly intervals.
A report on this effort has been issued as CEN-327, "RPS/ESFAS Extended Test Interval Evaluation" (Reference 6.1).
CEN-327 describes a probabalistic analysis of the reliability of the Reactor Protection Systems and Engineered Safety Features Actuation l
Systems installed in C-E plants for the current monthly test interval and the proposed quarterly test interval.
The impact of the difference in reliability on core melt frequency was then evaluated.
The extended test interval causes a slight increase in the core melt frequency, however this increase is more than offset by a reduction in the core melt frequency initiated from spurious plant trips caused by' PPS testing.
Increasing the surveillance test interval reduces the number of surveillance tests, thus reduces the exposure to test-induced transients.
This, in turn, reduces 1
l the core melt frequency.
The report concludes that j
(!
increasing the surveillance frequency from monthly to j
,l quarterly will result in an overall reduction in the
)
l probability of core melt.
This report does not apply to j
t equipment that provides input to the PPS bistables, only to
{
the bistables and downstream components.
3
kES&L DEPARTMEUT ICCN N0/
CALCULATIONSEEET nEUM. CCN NO.
PAGE __ _ 0F GGN GUNVER51Ch:
Project or DCP/MMP N/A Calc No.
J-SEA 012 CCN NO.
CCN-Subject NI Subchannel Gafn Calibration As Found / As Lef t Data Sheet No.
5 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE AEV 0
BOCKHORsi 09/07/93 QUINN 09/10/93 INO In Reference 6.2, the NRC notified the CEOG that they found the report acceptable for justifying extension of the I
surveillance test interval (STI) for the RPS/ESFAS, and transmitted their Safety Evaluation Report (SER).
Included in their letter approving the report was a requirement that "the licensees must confirm that they have reviewed drift information for each channel involved and have determined that drift occurring in that channel over the period of extended STI will not cause the setpoint value to exceed the allowable value as calculated for that channel by their setpoint methodology".
In calculation J-SBA-001, a detailed evaluation of bistable drift was performed for each of the bistables included in PPS. Based on a statistical evaluation of "As-Found" and "As-Left" data for each of the different types of bistables, maximum drift values were identified and compared with the allowances for drift in the applicable PPS setpoint calculations (Reference 6.3). The evaluation was summarized and submitted to the NRC in Proposed Change Notice (PCN) NPF-10/15-344, dated August 30, 1991. This PCN was issued to request a change in the Technical Specification required surveillance interval for PPS from monthly to quarterly. In response, the NRC issued the revisions to the Operating License for SONGS 2&3 on February 28, 1992 which accepted the proposed revision in PPS surveillance interval.
The NI channels provide an input to PPS for the linear and logarithmic power trip histables as well as to perform other functions. The surveillance interval for channel calibration of the NI safety channels in the Technical Specifications includes a requirement to verify that the settings of the linear subchannel gains of the excore detectors are consistent with the values used in the shape annealing matrix elements in the core protection calculators on a monthly basis. This calculation provided the drift analysis for the NI safety channel linear subchannel gain circuitry and the associated maximum drift value which can be expected over the proposed quarterly interval for performance of the channel calibration.
l
NES&L CEPARTMENT ICCM N0/
PACE Or _
CALCULATIONSHEET PREtin. CCN NO.
GCN GONVER51CN:
Project or DCP/MMP N/A Calc No.
J-SEA 012 CCN NO.
CCN-Sheet No.
6 Subject NI Subchannel Gain Calibration As-Found / As-Left Data REV ORIGINATOR DATE 1RE DATE REV ORIGINATCR DATE 1RE DATE REV D
BOCKHORST 09/07/93 OUINN 09/10/93 IND In April of 1992, a report was generated which documents Inc. (PLG),
l work accomplished by Pickard, Lowe and Garrick, and the San Onofre Nuclear Generating Station (SONGS) on a pilot program to establish a risk-based methodology for The work was evaluating surveillance testing at SONGS.
undertaken to implement the recommendations of the U.S.
(NRC) task group to the l
Nuclear Regulatory Commission's issue of surveillance testing in technical specifications.
that The thrust of the group's recommendations wascontent and frequency should have a surveillance test technical basis.
The group further stated that surveillance test requirements should not unduly consume plant personnel l
I time or result in undue radiation exposure to plant in personnel without a commensurate safety benefit The results of the risk-based minimizing public risk.
evaluation indicated that there is considerable opportunity for reducing the content and extending the frequency of the while 31-day excore safety channel drawer surveillance test, maintaining the unavailability of the system at or below its current level.
The NRC has acknowledged that that extension of the surveillance interval for nuclear instrumentation is reasonable.
From Section 5.1, NUREG-1366, l
"It appears from a review of operating experience that nuclear instrumentation experiences significant setpoint drift.
Therefore, before the calibration requirements are modified, the set point drift of nuclear instrumentation should be more closely However, there seems to be no reason, based examined.
on the review of operating data, why the analog channel 1
operational test could not be performed quarterly rather than monthly."
This calculation identifies the components subject to drift i
/
which are affected by the proposed increase in the STI, documents the methods used to evaluate the drift experienced
)
and provides the results of the drift for these components, evaluation on a monthly, quarterly and four month basis.
i e
1 1
t
~
l l
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET PRELIM. CCN No.
Pace Or CGN convER51CNi Project or DCP/MMP N/A Calc No.
J SEA-012 CCN NO.
CCN-Subject NI Subchannel Cain Calibration As Found / As Lef t Data Sheet No.
7 REV ORIGINATOC DATE 1RE DATE REV ORIGINATOR DATE 1RE DATE REV D
80CKHORST 09/07/93 ou!NN 09/10/93 INO 1.3 Nuclear Instrumentation System The excore safety channels are adequately described in the applicable sections of the Southern California Edison Company (SCE) system description, SD-S023-470, Revision 0 (Reference 6.4), entitled "Excore Nuclear Instrumentation System."
The main functions of the safety channels are to Provide a OV to 10V output signal corresponding to the neutron flux power to the plant protection system (PPS) for the high linear power trip (110%) and pretrip and the high log power trip (0.83%) and pretrip.
Provide three individual subchannel OV to 10V output signals corresponding to the neutron flux output to the core protection calculator for use in the low departure from nuclear boiling ratio (DNBR) trip and the high local power density (LPD) trip algorithms.
Provide four channels of reactor power indication for the main control room over a range from 10-8 to 200%
(logarithmic) and from 0% to 200% linear.
Provide a signal to activate the loss-of-load reactor trip circuit at 55% power.
The excore safety channel comprises two subsystems that are built into the same drawer and that share the same power supplies and detectors.
These subsystems are Linear Power.
The linear portion of the safety channel uses three vertically stacked fission chambers with no preamplification.
The DC milliampere output from the detectors is converted to a OV-to-10V output signal inside the drawer by an I/V (current-to-voltage) converter and then is summed and averaged to provide an overall linear power level signal.
The average voltage output is fed to the PPS for the high linear power trip and to the control room recorders for power level indication.
In addition, this signal provides input to the vibration and loose parts monitor and to the 55%
e loss of load bistable.
l 1
l NES&L DEPA3TMENT I
ICCN N0/
CALCULATIONSIEET PRELIM. CCN NO.
PAGE OF GCN GONVER 5IGN g Project or DCP/MMP N/A Calc No.
J-SEA-012 CCN NO.
CCN-Subject NI Subchannet Gain Calibration As-Found / As-Left Data Sheet No.
8 REV ORIGINATOR DATE 1RE DATE REV ORIGihATOR DATE IRE DATE REV O
BOCKHOR5T 09/07/93 QUINN 09/10/93 IND The three individual detector output voltages are also fed to the core protection calculators for determination of the axial shape index and the calibrated excore power, which are used in the DNBR and local power density algorithms.
Logarithmic P.ower.
The logarithmic portion of the safety channel uses only the middle detector output through a preamplifier to the safety channel drawer.
The safety channel drawer converts the preamplifier into a logarithmic power signal using output This logarithmic count rate and Campbelling circuitry.
output signal is fed to the PPS for the high logarithmic power trip.
It is also used for main control board indication of logarithmic power and The subchannel amplifiers have no impact startup rate.
on the final log power signal.
Figure 1.1 is a simplified schematic that shows the subsystems of one excore nuclear instrumentation safety channel.
It also identifies which cables and devices are in the containment, in the PPS cabinets themselves, and in the The excore safety channel is fully described control room.
in the General Atomic Vendor Technical Manual (Reference 6.6).
e 6
i l
b
kES&L DEPCRTMENT ICCN CO/
CALCULATIONSHEET PREtin. CCN NO.
PACE Or _
GGN CONVERSIGN Project or DCP/MMP N/A Calc No.
J-SEA-012 CCN NO.
CCN-Subject N! Subchamel Galn Calibration As-Found / As-Left Data Sheet No.
9 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE D
BOCCHOR$T 09/07/93 QUINN 09/10/93 REV IND Figure 1.1 Containment II Draver
,r- -----------------------------)I I
i I
I i I To CPCs I bkaNon 1 I I
ers I
I I i
!n l l ! aim::a l
l 1 1
I I I i
i i I Sutmer Calibrate I
p**F"':r l i
x x
x l
/
/
/
l l
l ll l
l n l
I l
I I Linaar NI Power I
I L.............._..._...
1 I
I i i
i i
l i I
Count Este PreasP1111e{ l l
~
t i
I I Canbelling 1
1 1 1 1
l l l Log VI Power i
ExCore Nuclear Instrumentation i
1 l
l i
I
\\
l
NES&L DEPARTMENT ICCN N0/
PRELIM. CCN NO.
PAGE _ 0F _
CALCULATIONSIEET GGk GONVER5ICNg Project or DCP/MMP N/A Calc No.
J-SEA 012 CCN NO.
CCN-
$4]ect NI Subchannel Gain Calibration As-Found / As Lef t Data Sheet No.
10 REW ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE REV O
80CKHORST 09/07/93 QUINN 09/10/93 IND 1.4 Technical Specifications Technical Specification 3/4.3.1 requires a monthly channel calibration for the linear and logarithmic power channels as shown in the following table from Table 4.3-1 in the Technical Specifications.
Table 1.1 Reactor Protective Instrumentation Surveillance Requirements Channel Channel Check Calibration Functional Unit "2.
Linear Power - High S
D (2,4), M(3,4),
Q(4), # (4) 3.
Logarithmic Power Level - High S
- (4) "
The applicable notes for the table notations are as follows:
" (3) Above 15% of RATED THERMAL POWER, verify that the linear power subchannel gains of the excore detectors are consistent with the values used to establish the shape annealing matrix elements in the Core Protection Calculators.
(4)
Neutron detectors may be excluded from CHANNEL CALIBRATION."
The definition of Channel Calibration is as follows:
"A Channel Calibration shall be the adjustment, as necessary, of the channel output such that it responds with the necessary range and accuracy to known values of the parameter which the channel monitors.
The Channel Calibration shall encompass the entire channel including the sensor and alarm and/or trip functions, and shall include the Channel Functional Test.
The Channel Calibration may be performed by any series of sequential, overlapping or total l
channel steps such that the entire channel is calibrated."
t SONGS Surveillance Procedures S023-II-5.5 through 5.8 j
(Reference 6.5) are used to perform the monthly surveillance to comply with the above Technical Specification for
NEEAL DEPARTMENT ICCN N0/
CALCULATIONSIEET PRELIM. CCN NO.
PAGE _ 0F _
CCh CONVER5[CN:
CCN NO.
CCN-Project or DCP/MMP W/A Calc No.
J-SEA 012 Subject NI Subchannet Gain Calibration As Found / As-Left Data Sheet No.
11 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE REV D
BOCKHORST 09/07/93 QUINN 09/10/93 IND Functional Units 2 & 3.
These surveillance procedures conduct a calibration of both the log and linear power channels including verification that the linear subchannel It also records the "as-found" gains are properly adjusted. values for each of the linear subchannel gain and "as-left" The amplifier outputs to verify the channel calibration.
summed linear channel output is required to be calibrated daily so changing the monthly calibration interval to quarterly or four month intervals has no impact on the summed linear signal.
It does, however, increase the time between calibration of the subchannel amplifiers.
The log channels are required to be calibrated at refueling intervals and functionally tested within 7 days prior to each startup.
l l
l.
i i
d
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET PRELix. CCN NO.
Pace or GGN CONVER51 Chi Project or DCP/MP N/A Calc No.
J* SEA 012 CCN No. CCN-S4]ect NI Subchannel Gain Calibration As Found / As-Left Data Sheet No.
12 REV ORIGINATOR DATE 1RE DATE REV ORIGthATOR DATE 1RE DATE REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND 2.O RESULTS/ CONCLUSIONS 2.1 Results Table 2.1 summarizes the results of this calculation.
When tested at monthly, quarterly, and four month intervals, the expected maximum change in calibration of the subchannel amplifiers is i 50,
- 70, i 80 millivolts, respectively, at a 95% probability, 95% confidence interval.
Table 2.1 Monthly Quarterly 4 Month Points, n 1072 1010 954 Average
-0.0003
-0.0009
-0.0017 Std Dev 0.0295 0.0415 0.0500 Max Crit 0.050 0.070 0.080 Min Crit
-0.050
-0.070
-0.080 Above 18 18 14 Below 16 16 18 l
Within, x 1038 976 922 x/n 96.83%
96.63%
96.65%
Upper 97.76%
97.62%
97.63%
l Lower 95.40%
95.12%
95.13%
2.2 Conclusions The purpose of this calculation has been achieved in that the maximum expected change in calibration of the subchannel and amplifiers has been determined on a monthly, quarterly, four month basis.
The results of this calculation are consistent with the assumptions in the CPC input uncertainty calculation (Reference 6.11) when tested on a monthly basis.
CES&L DEPARTMEN7 ICCN N0/
CALCULATIONSHEET PREux. CcN NO.
Pace _ Or _
GGN CONytR5LcN:
Project or DCP/MMP N/A Calc No.
J SEA 012 CCN No. CCN-Subject NI Subchannet Gain Calibration As Found / As Lef t Data Sheet No.
13
)
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND 2.3 Recommendations There are no changes required to the CPC input uncertainties as a result of this calculation.
However, increasing the calibration interval of the subchannel amplifiers would require that the CPC input uncertainty be revised to reflect the new test interval.
2.4 Limitations None 2.5 Interfacing Calculations, Documents and Drawings Reference to this calculation should be added to the CPC Input Data Channel Uncertainty Calculation, SO23-944-C90 (Reference 6.11).
NEDOTRAK Log Item RMB-92-052, Subtask 02 i
has been issued to track this item.
The Design Basis Document for this system (DBD-SO23-470) should be revised to reference this calculation.
NEDOTRAK t
Log Item RMB-92-052, Subtask 02 has been issued to track this item.
1 l
l l
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET PREtiM. CCN No.
Pact _ Or _
GGN GONVER5LEN Project or DCP/MMP N/A Calc No.
J-SEA-012 CCN No. CCN-Subject NI Subchannel Gain Calibration As Found / As Lef t Data Sheet No.
14 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCO ORST 09/07/93 QUINN 09/10/93 IND 3.0 ASSUMPTIONS 3.1 Assumptions Which Do Not Require Verification NONE 3.2 Assumptions Which Require Verification NONE 3.3 Judgements and Decisions NONE
(
l l
I ii i
f i
{
?
NES&L DEPARTMENT ICCN NO/
PRELIM. CCN No.
PACE or CALCULATIONSIEET CCN CGNVER5IC N; Project or DCP/MMP N/A Calc No.
J SEA 012 CCN No. CCN-Sheet No.
15 Subject NI Subchannel Gain Calibration As-Found / As-Left Data REV ORIGINATOR DATE
[RE DATE REV ORIGINATOR DATE 1RE DATE e
REV D
BOCKHORST 09/07/93 QUINN 09/10/93 IND 4.0 DESIGN INPUT DATA Input data for this calculation was taken from the completed Reference Safety Channel Drawer Monthly Surveillance Tests, The data recovered from these completed surveillance 6.5.
tests in listed in Appendix A.
l
hES&L DEPARTMENT ICCN NO/
CALCULATIONSIEET PREtiN. CCN NO.
PAGE _ OF _
GGN GQNVER5IChi Project or DCP/MMP W/A Calc No.
J SEA 012 CCN WO.
CCN-Si.bject NI Subchannel Gain Calibration As Found / As Lef t Data Sheet No.
16 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE O
SOCKHORST 09/07/93 QUINN 09/10/93 REV
]ND 5.0 METHODOLOGY This section of the calculation describes the methods used to evaluate the experienced drift of the Nuclear Instrumentation Subchannel Amplifiers on both a monthly and quarterly basis.
The method of evaluating the suitability of extending the STI was to determine the experienced drift, on a "95/95" basis, of the SONGS Units 2 & 3 NI Subchannel amplifiers.
References 6.7, 6.8, and 6.9 describe statistical techniques to analyze data to obtain values at various probabilities and confidence levels.
Historically, the NRC has accepted 95% probability and 95% confidence levels as sufficient for safety related instrument setpoints.
These levels are recommended in industry standards.
This section describes the scope of this calculation, the data recovery, determination of drift values for monthly and quarterly intervals, and the analysis of the drift data.
5.1 Data Recovery Available calibration data from January, 1989 through December, 1991 was recovered for both Units 2 & 3.
The as-found and as-left data from the actual surveillance tests was retrieved from Corporate Document Management (CDM) records of Surveillance Test Procedures S023-II-5.5 through S023-II-5.8.
The surveillance testing is not required when 1
in Modes 4, 5, or 6 so data is not available for those months.
The recovered data is well over 90% of the data recorded by the monthly surveillance procedures during the three year interval.
The actual as-found and as-left data is listed in Appendix A.
5.2 Determination of Drift Values Once the data was recovered from the CDM records, it was entered into LOTUS 1-2-3 spreadsheets.
One spreadsheet was created for each NI channel in each unit, for monthly, quarterly and four month intervals, for a total of 8 spreadsheets.
The date of the surveillance and the as-found and as-left values were entered.
i i
The monthly values for drift were determined for each NI
]
4
NESL DEPARTMENT (CCN N0/
PRELIM. CCN NO.
PAGE _ 0F _
CALCULATIONSHEET GCN CONVERSIGNt Project or DCP/MMP N/A Calc No.
J SEA-012 CCN NO.
CCN-Subject NI tubchannel Gain Calibration As Found / As Lef t Data Sheet No.
17 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE r
REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND subchannel amplifier by first subtracting the related value from both the as-left and as-found values for each subchannel amplifier to determine the deviations associated with each calibration.
The as-left deviation was then subtracted from the as-found deviation to determine the i
change in calibration for the respective calibration point.
In equation form, ALR.1,3)
]
( AL.1,3
{ (AF,3 - AFR,3) -
t Deltat,3 i
1 1
=
- where, The change in calibration of the jth Deltat,3
=
calibration point determined at the ith calibration interval The as-found value of the jth AF,3
=
i calibration point determined at the ith calibration interval The as-left value of the jth calibration AL,3
=
point determined at the ith calibration i
interval The required as-found value of the jth AFR,3
=
i calibration point determined at the ith calibration interval The required as-left value of the jth ALR,3
=
calibration point determined at the ith 1
calibration interval calibration interval i
=
calibration point j
=
The technical specifications allow a 25% grace period in addition to the 31 day monthly interval.
This means that the maximum interval between successive monthly records is If the interval of the recovered records exceeded 39 days. then the data over that interval was discarded 39 days, assuming that the records for the intervening time were not
?
recovered.
1 Determination of the quarterly values for drift was slightly l
The objective was to determine the more complicated.
changes that would have occurred in the trip setpoints if 6
the surveillance test had been performed at quarterly intervals.
This was done by summing the differences between the as-found and previous as-left reading when data was
f NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET PREUM. CCN NO.
PAGE OF _
CGN GONVERSICN i
Project or DCP/MP et/A ce(c eks.
J SEA 012 CCN NO.
CCN-Subject NI Subchamet Gain Calibration As-Found / As.Left Data Sheet No.
18 REV ORIGINATOR SATE IRE DATE REV ORIGINATOR DATE 1RE DATE O
80CKHORST 09/07/95 Suluu 09/10/93 REV INO available for three successive months as follows
( AL.1,3 - ALR.1,3)]
((AF,3 - AFR,3) -
+
Driftai i
t
=
i t
ALR.2,3)}
( AL.2.3 AFR.1,3)
( ( AF.2,3
+
1 t
i 1
ALR 3,3)]
( AL.2,3 AFR 2,3) -
( ( AF _2,3 i
t t
i
- where, The quarterly value drift for the Drift
=
m sub-channel amplifier By summing is this manner, the effect of readjusting a sub-channel amplifier is negated so that the value of drift is determined as if the amplifier had not been adjusted.
This results in a set of luonthly drif t data and a set of quarterly drift data for all of the Units 2 & 3 NI sub-channel amplifiers.
The same process was followed to determine the changes in calibration over a four month interval except that, since the 25% allenrance was included and the data was evaluated over a five month interval.
In equation form,
- ALR.1,3 ) J +
[(AF,3 Driftsi t
=
i i
i ALR.2,3 ) I +
AFR.1,3))
[ ( AF.3,3 i.2,3 i
i t
ALR.3,3) ))
(A L.2,3
[(AF 23 - AFR -2,3) t t
i 1
ALR..,3)) ]
( AL..,3
[(AF.3,3 AFR.3,3)
+
i i
i i
( AL.s,3 ALR.5,3
[ (AF
..,3 A F R
..,3 t
i i
t
- where, The change in calibration of the sub-
- Drifts,
=
channel amplifiers over a five month interval i
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET PREuM. cCN No.
PACE or CCN CONVER5iCN; Project or DCP/MMP N/A Calc No.
J SEA-012 CCN No. CCN-Subject NI Subchannet Geln Calibration As-Found / As*Lef t Data Sheet No.
19 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND 5.3 Analysis of Drift Data The methods used to evaluate the amplifier drift are from Reference 6.9.
To analyze the amplifier drift data, a " drift" specification for each process application was arbitrarily selected as a pass / fail criteria.
The probability of the drift value falling within this criteria can then be estimated by x/n P
=
- where, probability of drift within the pass / fail criteria P
=
number of values inside the pass / fail criteria x
=
number of drift values n
=
Since P is an estimate of the nominal probability that a value will fall inside the pass / fail criteria, the confidence interval on this estimate must be determined.
From Reference 6.9, page 467, an exact confidence interval for P can be calculated as follows I ( X+1)
- F,f2,2. tx.ti,2. <n-x)]
/ [ (n-x) + (x+1)
- F./2,s.tx.u,2 in-x) 3 P
=
u x/ [x+ (n-x+1)
- F./2,2. co.x.u,2.xl P
=
t Confidence interval, % = 100*(1-a)
- where, The minimum (1) and maximum (u) values Po,1
=
of the probability that a value will fall inside the pass / fail criteria Probability that the estimated a
=
probability will fall outside of the estimated confidence interval bounds Value from F distribution with vi and v2 F./2,vi,v2
=
degrees of freedom A 95% confidence level is widely recommended and sccepted for setpoint calculations by industry standards and the NRC.
This process is repeated until a pass / fail criteria is found which will result in a minimum probability, at the 95%
confidence level, of at least 95% that the drift values will
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET PREtiN. CCN No.
pace _ Or _
1 GCN GONVER5ICN Project or DCP/MMP N/A Cate No.
J SEA 012 CCN NO.
CCN-Sheet No.
20 Subject NI Subchannel Cain Calibration As-Found / As Lef t Data REV ORIGINATOR DATE IRE DATE REV ORIGlhATOR DATE 1RE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND fall within the pass / fail criteria.
To summarize the methods, trial pass / fail limits are set, the nominal probability of meeting these trial limits is calculated, and the 95% confidence interval of the probability is calculated.
If the minimum probability, at the 95% confidence level, of meeting the trial criteria is l
greater tnan 95%, then it is concluded that the trial criteria will bound the expected results on a 95/95 basis.
The trial criteria is then considered to be the bounding variation in the calibration results.
l l
i
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET pREtim. CCN No.
PACE 0,
CCN CONVER51CN Project or DCP/MMP N/A Calc No.
J-$EA 012 CCN NO.
CCN-Subject NI Subchannel Cain Calibration As Found / As Lef t Data Sheet No.
21 REV ORIGINATOR CATE IRE DATE REV ORIGINATOR DATE 1RE
-CATE O
BOCKHOR$T 09/CT/93 QUINN 09/10/93 REV IND
6.0 REFERENCES
6.1 Combustion Engineering Owners Group Topical Report CEN-327, "RPS/ESFAS Extended Test Interval Evaluation",
Prepared for the C-E Owner's Group, May, 1986.
6.2 U. S. Nuclear Regulatory Commission Letter from Ashok C. Thadani, Division of Systems Technology, Office of Nuclear Reactor Regulation, USNRC to Mr. Edward Sterling, Chairman CEOG, dated November 6, 1989.
6.3 SONGS Units 2 & 3 Plant Protection System Bistable Drift, Calculation number J-SBA-001, Revision 0.
6.4 Southern California Edison Company, "Excore Nuclear Instrumentation System", SONGS 2 & 3 System Description SD-S023-470, Revision O.
6.5 SONGS Units 2 & 3 Safety Channel Drawer Monthly Surveillance Tests, S023-II-5.5 through 5.8, all are currently Revision 11 6.6 General Atomic Vendor Safety Channel Operation and Maintenance Manual; S023-941-45-13.
6.7 Statistics for Nuclear Engineers and Scientists, Part 1: Basic Statistical Inference, WAPD-TM-1292, DOE Research and Development Report, William J. Beggs, February, 1981, Bettis Atomic Power Laboratory, West Mifflin, Pennsylvania.
6.8 SCE Engineering Standard for Instrument Setpoint/ loop Accuracy calculation Methodology, JS-123-103C.
6.9 Engineering Statistics, 2nd Edition, Albert H. Bowker and Gerald J. Lieberman, Copyright 1972 by Prentice-Hall, Inc., Englewood Cliffs, New Jersey.
6.10 Pickard, Lowe and Garrick, Inc., PLG-0575, " Methodology for Developing Risk-Based Surveillance Programs for Safety-Related Equipment at San Onofre Nuclear Generating Station Units 2 and 3",
April 1992, CDM Number SO23-941-91, Revision O.
NES&L DEPARTMEN7 ICCN N0/
CALCULATIONSHEET PRELIM. CCN No.
PAGE,_._ 0F GCN CONVER5ICNg Project or DCP/MMP N/A Cale No.
J SEA 012 CCN NO.
CCN-Subject NI Subchannel Gain Callbration As.Found / As-Lef t Data Sheet No.
22 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE D
BOCKHORST 09/07/93 OUINN 09/10/93 REV IND 6.11 San Onofre Nuclear Generating Station, Units 2 and 3, I
CPC Input Data Channel Uncertainty Calculation, CE NPSD-704-P, Revision 02-P, April, 1993, CDM Number SO23-944-C90-0 6.12 San Onofre Nuclear Generating Station, Units 2 and 3, Plant Protection System Setpoint Calculation, CE NPSD-570-P, Revision 03-P, October, 1991, CDM Number SO23-l 944-C50-0 i
6.13 San Onofre Nuclear Generating Station, Unit 2, j
Technical Specifications (Appendix A to License Number l
NPF-10) through Amendment 107 l
6.14 San Onofre Nuclear Generating Station, Unit 3, Technical Specifications (Appendix A to License Number NPF-10) through Amendment 96 6.15 Letter from W.C. Marsh, Southern California Edison to U. S. Nuclear Regulatory Commission, " Docket Nos. 50-361 and 50-362, Revised Calculational Method for Determining Changes in Transmitter Calibration, San Onofre Nuclear Generating Station, Units 2 and 3",
dated September 28, 1992 6.16 Design Basis Document DBD-SO23-470, Revision 0, Excore Nuclear Instrumentation System i
l NES&L DEPARTMENT
__ICCN N0/
CALCULATIONSIEET PREtin. cCN No.
PAGE _ o, _
CGN GONVEREICN:
Project or DCP/MMP N/A Calc No.
J SEA-012 CCN NO.
CCN-Subject NI $4chamel Galn Calibration As-,ound / As Lef t Data Sheet No.
23 REV ORIGINATOR DATE IRE DATE REV CRIGINATOR DATE IRE DATE REV O
BOCKHOR$T 09/07/93 QUINN 09/10/93 IND l
7.0 NOMENCI.ATURE i
The change in calibration of the jth Deltai,3
=
calibration point c'e.termined at the ith calibration interval The as-found value of the jth AF,3 calibration point determined at the ith
=
i calibration interial The as-left value of the jth calibration AL,3
=
point determined at the ith calibration i
interval The required as-found value of the jth AFR,3 calibration point determined at the ith
=
i calibration interval The required as-left value of the jth ALR,3 calibration point determined at the ith
=
1 calibration interval Calibration interval i
Calibration point j
=
The quarterly value drift for the sub-Driftat
=
channel amplifier The change in calibration of the sub-Driftsi
=
channel amplifiers over a five month interval Probability of drift within the P
=
pass / fail criteria Number of values inside the pass / fail i
=
x criteria Number of drift values
=
n The minimum (1) and maximum (u) values Po, t
=
i of the probability that a value will fall inside the pass / fail criteria Probability that the estimated
=
a probability will fall outside of the estimated confidence interval bounds Value from F distribution with vi and v2 F /2,vt.v2
=
degrees of freedom s
1 CESAL DEPARTMEN7 ICCN N0/
PaEtin. CCN NO.
PACE _ Or CALCULATIONSHEET GCN GUNVER5ICW:
CCN NO.
CCN-Project or DCP/MMP N/A Calc No.
J SEA 012 Sheet No.
24 Subject NI Subchannel Gain Calibration As-Found / As-Left Data aEv ORIGINA10R DATE 1RE DATE REV ORIGINATOR DATE IRE DATE I
AEV D
SOCKHORST 09/07/93 QUINN 09/10/93 IND I
i 8.O COMPUTATIONS This section is organized in three subsections addressing monthly, quarterly, and four month calibration intervals.
Within each of these subsections, the determination of the change in calibration is discussed, the results of the and a histogram presenting the distribution of the
- analysis, data.
8.1 Monthly Data Analysis
)
8.1.1 Determination of Differences i
The change in calibration over monthly intervals was calculated by first subtracting the required value from its as-left and as-found value calibrations for a particular calibration date in all of the sub-channel amplifiers to determine the deviations associated with each calibration.
The as-left deviation was then subtracted from the previous as-found deviation to determine the drift between the corresponding calibration dates.
From Section 5,
( AL.1,3 - ALR.2,3) ]
[ (AF,3 - AFR,3) i i
Deltat,3 1
i
=
The data is presented in Appendix A.
t
(
I l
1 1
NES&L DEPAR EENT ICCN to/
PREun. CCN No.
PAGE or CALCULATIONSHEET GCN CONVERSIGN; Project or DCP/MMP N/A Calc Wo.
J SEA +012 CCN No. CCN-Sheet No.
25 Subject N1 Subchannel Gain Calibration As Found / As-Left Data AEV CRIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV D
BOCKHORST 09/07/93 QUINN 09/10/93 IND 8.1.2 Limits / Probability The following table shows that the changes in calibration of the subchannel amplifiers will be less than 50 millivolts when calibrated on a monthly basis.
Table 8.1 Monthly Total Points, n 1072 Average
-0.0003 Std Dev 0.0295
)
Max Crit 0.050 Min Crit
-0.050 f
Above 18 Below 16 Within, x 1038 l
x/n 96.83%
2(x+1) 2078 2(n-x) 68 F, upper 1.43 2(n-x+1) 70 2x 2076 F,
lower 1.43
~
Upper 97.76%
Lower 95.40%
1 4
NES&L DEPARTMENT ICCN NO/
i CALCULATIONSHEET PREum. CCN No.
PAGE _ or CCN CONVERSION:
Project or DCP/MMP N/A Calc No, J SEA 012 CCN No. CCN-Subject N1 Subchannel Gain Calibration As Found / As Left Data Sheet No.
26 l
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE l
0 80CKHORST 09/07/93 QUINN 09/10/93 REV l
IND i
Explanation of table labels:
Points, n The number of data points in the sample Avg The average change in calibration in volts Std Dev The standard deviation of the change in calibration in volts (Note:
Lotus determines the standard deviation by dividing by n instead of the more commonly accepted value l
of n-1.)
Max Crit The maximum value, in volts, selected to bound the changes in calibration at a 95%
probability / 95% confidence interval Min Crit The minimum value, in volts, selected to bound the changes in calibration at a 95%
probability / 95% confidence interval Above The number of points equal to or greater than the maximum' criteria Below The number of points equal to or greater than the minimum criteria Within, x The number of values that fall within the maximum / minimum criteria x/n The nominal % probability that the value will fall within the maximum / minimum criteria l
2(x+1) vi, the degrees of freedom for the upper value for the F distribution f
J 2(n-x) v2, the degrees of freedom for the upper i
value for the F distribution F, upper The value (Fa/2,2tx+u,2.<n-xi) from the F distribution tables (Table 4, Reference 6.9) related to the upper probability limit based J
on the confidence interval and the degrees of freedom
NES&L CEPARTMEh ICCN N0/
CALCULATIONSHEET PREuM. CCN NO.
PACE _ Or GGN GONVERSIGN:
Project or DCP/MMP N/A Cale No.
J SEA 012 CCN NO.
CCN-Subject WI subchannel Cain Calibration As-Found / As Left Data Sheet No.
27
)
REV ORIGlhATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE D
BOCKHORST 09/07/93 Qu!NN 09/10/93 REV IND 2 (n-x+1) vi, the degrees of freedom for the lower value for the F distribution 2x v2, the degrees of freedom for the lower value for the F distribution F,
lower The value (Fa/2,2.<n-x11.2.x) from the F distribution tables (Table 4, Reference 6.9) related to the lower probability limit based on the confidence interval and the degrees of freedom
)
Upper The maximum % probability that the change in calibration will fall within the minimum and l
maximum criteria at a 95% confidence level, Po Lower The minimum % probability that the change in calibration will fall within the minimum and maximum criteria at a 95% confidence level, P 1 i
Sample calculation:
From inspection of the data in Appendix A, there is a total of 1,072 monthly data points (n), 1,038 of those data points (x) fall within the minimum and maximum criteria (t 50 millivolts).
1 Since only the lower (or minimum) probability is significant for this calculation, determination of the that value is accomplished as follows.
v1 = 2 * (n-x+1)
Substituting, v1 = 2 * (1072-1038+1) v1 = 2
- 35 70 v1
=
v2 = 2
- x Substituting,
NES&L DEPARVMEUT ICCN NO/
CALCULATIONSEEET PRELIM. CCN NO.
PAGE OF _
CCN GQNVER51CN Project or DCP/MMP N/A Calc No.
J SEA 012 CCN WO.
CCN-
$ubject N! Subchannel Gain Calibration As Found / As-Left Data Sheet No.
28 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
BOCKHOR$T 09/07/93 QUINN 09/10/93 REV IkO 2
- 1038 v2
=
v2 = 2076 From Section 5, 100 * (1-a)
Confidence interval, %
=
100 - 100a 95%
=
Solving for a, 100a
= 100 - 95 5
=
5/100 a
=
.05
=
- Thus, a/2 =.05/2 =.025 From Section 5, x/ [x+(n-x+1)*Fa/2,2. <n.x.u.2 x}
P
=
t From Table 4, Reference 6.9, Fo.2soo,2on = 1.43 Substituting, 1038 / [103 8 + (1072 -103 8+1) *1. 4 3 ]
P
=
3 1038 / (103 8+ (35) *1. 43]
P
=
1 1038 / [1038+50.05]
P
=
t 1038 / 1088.05 P
=
i 0.954 or 95.4%
P
=
t
NES&t, DEPARTMENT ICCN N0/
CALCULATIONSIEET PREtiM. CCN NO.
PACE _ 0, _
CCN CONVERSIGN3 Project or DCP/MMP N/A Calc No.
J SEA 012 CCN NO.
CCN-Subject NI Stbchannel Gain Calibration As Found / As Lef t Data Sheet No.
29 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
80CKHOR$i 09/07/93 QUINN 09/10/93 REV th0 1
8.1.3 Distribution of Data Figure 8.1 presents a histogram showing the data distribution at a calibration interval of one month.
Figure 8.1 NI Subchannel Amplifiers Change in Cat strat ton, Montnf y i
700 -
600 -
E 500 -
i g
b 400 -
300 -
200 -
'a '
's Y
TT i
i 6 0.055-0.03 -0.04 -0.03 -0.02 -0.01 0.00 0.01 0.02 0.03 0.04 0.03 30.055 Change in Calltration, volte i
l 1
1 1
NES&L DEPARTMENT ICCN N0/
PREuM. CCN NO.
PACE __ O r CALCULATIONSHEET GGN CONVER51CN3 CCN NO. CCN-Project or DCP/MMP N/A Calc No.
J SEA 012 Sheet No.
30 Subject NI Subchannel Gain Calibration As-Found / As-Left Data REW ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE REV O
80CKHORST 09/07/93 QUINN 09/10/93 IND 8.2 Quarterly Data Analysis 8.2.1 Determination of Differences The change in calibration over quarterly intervals was calculated by summing the differences between the as-found and previous as-left reading when data was available for three successive months.
From Section 5,
- ALR.1,3)i.13+
( AL.1,3 AFR,3)i -
[(AF,3 i
Drift 1
=
i i
ALR.1,3)123 +
ei
( AL.1,3 AFR,3)31 -
[(AF,3 t
i 1
i ALR.1,3 ) i. 3 }
( AL 1,1 -
AFR,3)i.2 -
[(AF,3 -
i i
1 i
The data and the changes in calibration on a quarterly basis is presented in Appendix A.
NES&L DEPARTMEN7 lCCN NO/
CALCULATIONSIEET PREtin. CCN No.
Pace or CCN CONVERSICNg Project or DCP/MMP N/A Calc Ne, J SEA-012 CCN NO.
CCN-Subject N1 Subchannel Galn Calibration As-Found / As Lef t Data Sheet No.
31 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
80CKHORST 09/07/93 QUINN 09/10/93 REV IND 8.2.2 Limits / Probability The following table shows that the changes in calibration of the subchannel amplifiers will be less than 70 millivolts when calibrated on a quarterly basis.
Table 8.2 Quarterly Total Points, n 1010 Average
-0.0009 Std Dev 0.0415 Max Crit 0.070 Min Crit
-0.070 Above 18 Below 16 Within, x 976 x/n 96.63%
2 (x+1) 1954 2 (n-x) 68 F, upper 1.43 1
2 (n-x+1) 70 2x 1952 1
F, lower 1.43 Upper 97.62%
Lower 95.12%
NES&L CEPARTMENT ICCN N0/
CALCULATIONSHEET PREtin. CCN No.
PAGE _ 0F _
GCN CONVER51CN Project or DCP/MMP N/A Calc No.
J SEA 012 CCN NO.
CCN-Subject NI Subchamel Gain Calibration As-Found / As Lef t Data Sheet No.
32 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE REV O
80CKHOR$T 09/07/93 QUINN 09/10/93 IND 8.2.3 Distribution of Data Figure 8.2 presents a histogram showing the data distribution at a calibration interval of three months.
Figure 8.2 NI Subchannel Amplifiers Chance 1n CaiItratton, Querteriy 500 -
400 -
N Nx s
300 -
- b t2WeQ@oQ 200 -
d 4 W..
s fW G Wm.
g
<-0.055-0.03 - 0. 04 -0. 03 - Q 02 - 0. 01 0.00 0.01 0.02 0.03 0.04 0.05 >0.055 Change in Celltration, volte e
NES&L DEPARTMENT ICCN N0/
CALCULATIONSI-EET PREtiM. CCN NO.
PAGE _ 0F _
CCN CONVER510N:
Project or DCP/MMP N/A Calc No.
J SEA 012 CCN NO.
CCN-Subject NI Subchannel Gain Calibration As Found / As Lef t Data Sheet No.
33 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE 0
BOCKHOR5T 09/07/93 QUINN 09/10/93 REV IND 8.3 Four Month Data Analysis 8.3.1 Determination of Differences The change in calibration over four month intervals was calculated by summing the differences between the as-found and previous as-left reading when data was available for five successive months.
From Section 5, ALR.1,3 ) ]
[(AF,3 - AFR,3)
Driftst
+
i
=
t i
1 ALR.23)}
AFR.1,3)
[ ( AF.1,3 1
+
i.2,3 t
1 A L R.3,3) ]
( A L -3,j AFR.2,3) -
[ ( AF.2.3 i
i t
1 A L R..,3) ))
( AL.4,3 AFR.3,3 ) -
[ ( AF.3,3 i
+
i i
i ALR.5,3)
( AL.3,3 AFR..,3) l
[(AF
..,3 i
t t
i The data and the changes in calibration on a four month basis is presented in Appendix A.
l i
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET PRELIM. CCW No.
PAGE OF GCN 00NVER31GN Project or DCP/MMP N/A Calc No.
J SEA 012 CCN No. CCN-Subject NI Subchannel Gain Calibration Aa-Found / As-Left Data Sheet No.
34 REV ORIGINATOR DATE IRE DATE REV ORIGINATOF DATE IRE DATE O
00CKHORST 09/07/93 QUINN 09/10/93 REV IND 8.3.2 Limits / Probability The following table shows that the changes in calibration of the subchannel amplifiers will be less than 50 millivolts when calibrated on a quarterly basis.
Table 8.3 4 Month Total Points, n 954 Average
-0.0017 Std Dev 0.0500 Max Crit 0.080 Min Crit
-0.080 Above 14 Below 18 I
Within, x 922 x/n 96.65%
4 2 (x+1) 1846 i
1 2 (n-x) 64 i
F, upper 1.43 l
2 (n-x+1) 66 2x 1844 P,
lower 1.43 Upper 97.63%
Lower 95.13%
I
CES&L DEPARTMEN7 lCCN N0/
CALCULATIONSHEET PRfu M.
CCN NO.
PAGE _ 0F _
CGN CONVER51CN1 Project or DCP/MMP N/A Cate No.
J* SEA 012 CCN NO.
CCN-Subject W! Subchannet Gaf n Calibration As Found / As-Left Data Sheet No.
35 REV ORIGINATOR CATE 1RE DATE REV ORIGINATOR DATE IRE DATE REV D
BOCKHORST 09/07/93 OUINN 09/10/93 IND 8.3.3 Distribution of Data Figure 8.3 presents a histogram showing the data distribution at a calibration interval of four months.
Figure 8.3 NI Subchannei AmpIifIers Change in Cal ttration, 5 Wnth 450 -
400 -
N 350 -
i x
\\%
300 -
\\
250 -
200 -
150 -
50 -
77 0
<-0.055-0. 05 - 0. 04 - 0. 0 3 - 0. 02 -0. 01 0.00 0.01 0.02 0.03 0.04 0.05 30.055 Change in Calltration, volte 4
hES&L DEPARTMENT ICCN NO/
CALCULATIONSHEET PREtiM. CCN No.
Pace _ Or _
GCN GONVER51CN:
Project or DCP/MMP N/A Calc No.
J SEA 012 CCN No. CCN-Subject NI Subchannel Gain Calibration As Found / As Left Data Sheet No.
36 REV ORIGINATOR DATE IRE DATE REV ORIG!hATOR DATE IRE DATE REV O
80CKHORST 09/07/93 QUINN 09/10/93 IND APPENDIX A Surveillance Test Data Listing
NES&L DEPARTMENT ICCN N0/ -
CALCULATIONSIEET-PRELIM. CCN No.
par.E _ 0F GCN CONVER5IGN:
Project or DCP/MMP N/A Calc No.
J $EA 012 CCN No. CCN-Subject N1 Subchannel Gain Calibration As-Found / As Left Data Sheet No.
37 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCKHOR$i 09/07/93 GUINN 09/10/93 INO NOTES:
These data listings were created in the Lotus 1-2-3 1.
spreadsheets.
When the Calibration Current is recalculated on a sub-channel, the required value of the amplifier output, 10 volts is incorrect.
To find the required value for the next as-found data, the new calibration current is divided by the last current and then multiplied by 10.
This new value is used to calculate both the monthly and quarterly drifts.
2.
"No Work Done" indicates that there was a work order issued but no work was performed.
3.
The data is required to be recovered every 39 days.
"No M.O." indicates that a maintenance order was not recovered for that time frame.
"**" indicates that there were maintenance activities 4.
which caused an interruption in the data.
Therefore this data is not used to calculate the monthly or quarterly drifts.
i l
i 1
2 i
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET nEuN. CCu NO.
ncE 0,
CCN CONVERSION:
Project or DCP/MMP M/A Calc No.
.f. u a.nis CCN NO.
CCN-Subject N1 Subchannet Cefn Calibration As.round / As-teft Data Sheet No.
38 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE 1RE DATE O
90CKHOR$f 09/07/93 QUINN 09/10/93 REV INO Unit 2 Channel A Amplifier A-10 MonthlyQuarter 5 MO M. C., #
Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89010183000 01/24/89 AF no work done E
89012263000 02/06/89 AF -0.7438 10.000 10.011 0.011 E
10.000 10.011 0.011 89021608000 03/06/89 AF -0.7438 10.000 10.010 0.010 -0.001 E
10.000 10.010 0.010 89030807000 03/28/89 AF -0.7438 10.000 10.005 0.005 -0.005 E
10.000 10.005 0.005 89040097000 04/26/89 AF -0.7438 10.000 10.006 0.006 0.001 -0.005 E
10.000 10.006 0.006 89051053000 05/16/89 AF -0.7438 10.000 10.004 0.004 -0.002 -0.006 E
10.000 10.004 0.004 89052583000 05/31/89 AF -0.7438 10.000 10.006 0.006 0.002 0.001 -0.005 E
10.000 10.006 0.006 89060468000 06/25/89 AF -0.7438 10.000 10.000 0.000 -0.006 -0.006 -0.010 E
10.000 10.000 0.000 89070440000 07/25/89 AF -0.7438 10.000 10.000 0.000 -0.006 -0.010 -0.011 E
10.000 10.000 0.000 89072805000 08/11/89 AF -0.7438 10.000 10.000 0.000 0.000 -0.012 -0.012 E
10.000 10.000 0.000 89082664000 09/08/89 AF -0.7438 10.000 10.002 0.002 0.002 -0.004 -0.008 E
10.000 10.002 0.002 89092405000 10/12/89 AF -0.7438 10.000 10.006 0.006 0.004 0.006 -0.006 E
10.000 10.006 0.006 89101650000 10/15/89 AF -0.7438 10.000 10.002 0.002 -0.004 0.002 -0.004 E
10.000 10.002 0.002 89102495000 10/21/89 AF -0.7438 10.000 10.004 0.004 0.002 0.002 0.004 E
10.000 10.004 0.004 89103006000 11/21/89 AF -0.7438 10.000 10.006 0.006 0.002 0.000 0.006 E
10.000 10.006 0.006 l
89112176000 12/01/89 AF -0.7438 10.000 9.998 -0.002 -0.008 -0.004 -0.004 E
10.000 9.998 -0.002 89120731000 12/19/89 AF -0.7438 10.000 10.003 0.003 0.005 -0.001 -0.003 E
10.000 10.003 0.003 89122705000 01/18/90 AF -0.7438 10.000 10.005 0.005 0.002 -0.001 0.003 E
10.000 10.005 0.005 90012977000 02/15/90 AF -0.7438 10.000 9.999 -0.001 -0.006 0.001 -0.005 l
E 10.000 9.999 -0.001 90021543000 03/09/90 AF -0.7438 10.000 10.002 0.002 0.003 -0.001 -0.004 E
10.000 10.002 0.002 90031693000 04/02/90 AF -0.7438 10.000 10.004 0.004 0.002 -0.001 0.006 AL 10.000 10.004 0.004 90041283000 04/27/90 AF -0.7438 10.000 9.998 -0.002 -0.006 -0.001 -0.005 E
10.000 9.998 -0.002 90050306000 05/24/90 AF -0.7438 10.000 10.003 0.003 0.005 0.001 -0.002 E
10.000 10.003 0.003 90052861000 06/20/90 AF -0.7438 10.000 10.000 0.000 -0.003 -0.004 0.001 E
10.000 10.000 0.000 90062827000 07/19/90 AF -0.7438 10.000 10.001 0.001 0.001 0.003 -0.001
NESisL DEPARTMENT ICCN N0/
CALCULATIONSHEET pnEtiN. CCN NO.
pace 0,
CCN CONVERSION:
Project or DCP/MMP W/A Calc No.
J u A-017 CC4 No. CCN-Subject N! Subchannel Cain Calibration As Found / As teft Data Sheet No.
39 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE D
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND AL 10.000 10.001 0.001 90080287000 08/19/90 AF -0.7438 10.000 10.003 0.003 0.002 0.000 -0.001 AL 10.000 10.003 0.003 90082021000 08/26/90 AF -0.7438 10.000 10.000 0.000 -0.003 0.000 0.002 AL 10.000 10.000 0.000 90090760000 09/16/90 AF -0.7438 10.000 10.002 0.002 0.002 0.001 -0.001 AL 10.000 10.002 0.002 90091867000 10/15/90 AF -0.7438 10.000 10.000 0.000 -0.002 -0.003 0.000 AL 10.000 10.000 0.000 90102648000 11/14/90 AF -0.7438 10.000 10.001 0.001 0.001 0.001 0.000 AL 10.000 10.001 0.001 90111454000 11/25/90 AF -0.7438 10.000 10.010 0.010 0.009 0.008 0.007 AL 10.000 10.010 0.010 90120362000 12/07/90 AF -0.7438 10.000 10.003 0.003 -0.007 0.003 0.003 AL 10.000 10.003 0.003 90121041000 12/28/90 AF -0.7438 10.000 10.000 0.000 -0.003 -0.001 -0.002 AL 10.000 10.000 0.000 91010549000 01/24/91 AF -0.7438 10.000 10.000 0.000 0.000 -0.010 0.000 AL 10.000 10.000 0.000 91012608000 02/21/91 AF -0.7438 10.000 9.997 -0.003 -0.003 -0.006 -0.004 AL 10.000 9.997 -0.003 91030081000 03/10/91 AF -0.7438 10.000 9.999 -0.001 0.002 -0.001 -0.011 AL 10.000 9.999 -0.001 51037133000 04/08/91 AF -0.7438 10.000 9.995 -0.005 -0.004 -0.005 -0.008 AL 10.000 9.995 -0.005 91042301000 04/29/91 AF -0.7438 10.000 9.999 -0.001 0.004 0.002 -0.001 AL 10.000 9.999 -0.001 91050493000 05/06/91 AF -0.7438 10.000 10.000 0.000 0.001 0.001 0.000 AL 10.000 10.000 0.000 91051616000 06/04/91 AF -0.7438 10.000 10.002 0.002 0.002 0.007 0.005 AL 10.000 10.002 0.002 91060492000 07/03/91 AF -0.7438 10.000 10.018 0.018 0.016 0.019 0.019 AL 10.000 10.018 0.018 91070826000 07/31/91 AF -0.7438 10.000 10.005 0.005 -0.013 0.005 0.010 AL 10.000 10.005 0.005 91080847000 08/26/91 AF -0.7438 10.000 10.003 0.003 -0.002 0.001 0.004 AL 10.000 10.003 0.003 91091464000 09/25/91 AF -0.7438 10.000 10.004 0.004 0.001 -0.014 0.004 AL 10.000 10.004 0.004 91100386000 10/28/91 AF -0.7438 10.000 10.004 0.004 0.000 -0.001 0.002 AL 10.000 10.004 0.004 91110557000 11/15/91 AF -0.7998 10.753 10.750 -0.003 -0.007 -0.006 -0.021 AL 10.000 10.001 0.001 91111947000 11/26/91 AF -0.7998 10.000 10.006 0.006 0.005 -0.002 -0.003 AL 10.000 10.006 0.006 91120082000 12/26/91 AF -0.7998 10.000 10.003 0.003 -0.003 -0.005 -0.004 AL 10.000 10.003 0.003
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET p,EtiM. CCN No.
pace 0,
CCN CONVER$10N:
Project or DCP/MMP WA Calc No.
.1-MA-01?
CCN NO. CCN-5@ ject NT S @channet Ga(n Cattbration As-Found / As-Left Data Sheet No.
40 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE 1RE DATE D
BOCKHORST 09/07/93 QUINN 09/10/93 REV
!ND Unit 2 Channel A Amplifier A-11 MonthlQuarter 150 Da Date Cal Cur.
Reg'dCal Dat CD-Req " Drift " Drift " Drift 89010183000 01/24/89 AF no work done AL 89012263000 02/06/89 AF
-0.7211 10.000 10.017 0.017 AL 10.000 10.017 0.017 89021608000 03/06/89 AF
-0.7211 10.000 10.010 0.010 -0.007 AL 10.000 10.010 0.010 89030807000 03/28/89 AF
-0.7211 10.000 10.011 0.011 0.001 AL 10.000 10.011 0.011 89040097000 04/26/89 AF
-0.7211 10.000 10.008 0.008 -0.003 -0.009 AL 10.000 10.008 0.008 89051053000 05/16/89 AF
-0.7211 10.000 10.006 0.006 -0.002 -0.004 AL 10.000 10.006 0.006 89052583000 05/31/89 AF
-0.7211 10.000 10.010 0.010 0.004 -0.001 -0.007 AL 10.000 10.010 0.010 89060468000 06/25/89 AF
-0.7211 10.000 10.000 0.000 -0.010 -0.008 -0.010 i
AL 10.000 10.000 0.000 89070440000 07/25/89 AF
-0.7211 10.000 10.000 0.000 0.000 -0.006 -0.011 AL 10.000 10.000 0.000 89072805000 08/11/89 AF
-0.7211 10.000 10.010 0.010 0.010 0.000 0.002 AL 10.000 10.010 0.010 89082664000 09/08/89 AF
-0.7211 10.000 10.010 0.010 0.000 0.010 0.004 AL 10.000 10.010 0.010 89092405000 10/12/89 AF
-0.7211 10.000 10.009 0.009 -0.001 0.009 -0.001 AL 10.000 10.009 0.009 89101650000 10/15/89 AF
-0.7211 10.000 10.000 0.000 -0.009 -0.010 0.000 AL 10.000 10.000 0.000 89102495000 10/21/89 AF
-0.7211 10.000 10.009 0.009 0.009 -0.001 0.009 AL 10.000 10.009 0.009 89103006000 11/21/89 AF
-0.7211 10.000 10.011 0.011 0.002 0.002 0.001 AL 10.000 10.011 0.011 89112176000 12/01/89 AF
-0.7211 10.000 10.002 0.002 -0.009 0.002 -0.008 AL 10.000 10.002 0.002 89120731000 12/19/89 AF
-0.7211 10.000 10.012 0.012 0.010 0.003 0.003 AL 10.000 10.012 0.012 89122705000 01/18/90 AF
-0.7591 10.520 10.008 -0.512 -0.524 -0.523 -0.512 AL 10.000 10.008 0.008 90012977000 02/15/90 AF
-0.7591 10.000 9.997 -0.003 -0.011 -0.525 -0.532 AL 10.000 9.997 -0.003 90021543000 03/09/90 AF
-0.7591 10.000 10.002 0.002 0.005 -0.530 -0.529 AL 10.000 10.002 0.002 90031693000 04/02/90 AF
-0.7591 10.000 10.001 0.001 -0.001 -0.007 -0.521 AL 10.000 10.001 0.001 90041283000 04/27/90 AF
-0.7591 10.000 9.997 -0.003 -0.004 0.000 -0.535 AL 10.000 9.997 -0.003 90050306000 05/24/90 AF
-0.7591 10.000 9.999 -0.001 0.002 -0.003 -0.009 AL 10.000 9.999 -0.001 90052861000 06/20/90 AF
-0.7591 10.000 10.003 0.003 0.004 0.002 0.006 AL 10.000 10.003 0.003 90062827000 07/19/90 AF
-0.7591 10.000 10.002 0.002 -0.001 0.005 0.000
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET RRetiM. CCN No.
RACE 0,
CCN CONVERSION:
Project or DCP/MMP W/A Calc No.
M ea.ni?
CCN No. CCN-Subject N1 Subchannel Gain Calibration As Found / As.Left Data Sheet No.
41 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND AL 10.000 10.002 0.002 90080287000 08/19/90 AF
-0.7591 10.000 9.999 -0.001 -0.003 0.000 -0.002 AL 10.000 9.999 -0.001 90082021000 08/26/90 AF
-0.7591 10.000 9.996 -0.004 -0.003 -0.007 -0.001 AL 10.000 9.996 -0.004 90090760000 09/16/90 AF
-0.7591 10.000 10.001 0.001 0.005 -0.001 0.002 AL 10.000 10.001 0.001 90091867000 10/15/90 AF
-0.7591 10.000 10.003 0.003 0.002 0.004 0.000 AL 10.000 10.003 0.003 90102648000 11/14/90 AF
-0.7591 10.000 10.002 0.002 -0.001 0.006 0.000 AL 10.000 10.002 0.002 90111454000 11/25/90 AF
-0.7591 10.000 10.010 0.010 0.008 0.009 0.011 AL 10.000 10.010 0.010 90120362000 12/07/90 AF
-0.7591 10.000 10.001 0.001 -0.009 -0.002 0.005 AL 10.000 10.001 0.001 90121041000 12/28/90 AF
-0.7591 10.000 9.999 -0.001 -0.002 -0.003 -0.002 AL 10.000 9.999 -0.001 91010549000 01/24/91 AF
-0.7591 10.000 9.996 -0.004 -0.003 -0.014 -0.007 AL 10.000 9.996 -0.004 91012608000 02/21/91 AF
-0.7591 10.000 9.994 -0.006 -0.002 -0.007 -0.008 AL 10.000 9.994 -0.006 91030081000 03/10/91 AF
-0.7591 10.000 9.994 -0.006 0.000 -0.005 -0.016 AL 10.000 9.994 -0.006 91037133000 04/08/91 AF
-0.7591 10.000 10.002 0.002 0.008 0.006 0.001 AL 10.000 10.002 0.002 91042301000 04/29/91 AF
-0.7591 10.000 9.996 -0.004 -0.006 0.002 -0.003 AL 10.000 9.996 -0.004 91050493000 05/06/91 AF
-0.7591 10.000 10.003 0.003 0.007 0.009 0.007 AL 10.000 10.003 0.003 91051616000 06/04/91 AF
-0.7591 10.000 10.002 0.002 -0.001 0.000 0.008 AL 10.000 10.002 0.002 91060492000 07/03/91 AF
-0.7591 10.000 10.015 0.015 0.013 0.019 0.021 AL 10.000 10.015 0.015 91070826000 07/31/91 AF
-0.7591 10.000 10.003 0.003 -0.012 0.000 0.001 AL 10.000 10.003 0.003 91080847000 08/26/91 AF
-0.7591 10.000 10.001 0.001 -0.002 -0.001 0.005 AL 10.000 10.001 0.001 91091464000 09/25/91 AF
-0.7591 10.000 10.004 0.004 0.003 -0.011 0.001 AL 10.000 10.004 0.004 91100386000 10/28/91 AF
-0.7591 10.000 10.002 0.002 -0.002 -0.001 0.000 AL 10.000 10.002 0.002 j
91110557000 11/15/91 AF
-0.7826 10.310 10.308 -0.002 -0.004 -0.003 -0.017 AL 10.000 10.001 0.001 t
j 91111947000 11/26/91 AF
-0.7826 10.000 10.002 0.002 0.001 -0.005 -0.004 i
AL 10.000 10.002 0.002 f
91120082000 12/26/91 AF
-0.7826 10.000 9.997 -0.003 -0.005 -0.008 -0.007 AL 10.000 9.997 -0.003 e
e
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET pREtin. CCN No.
pace 0,
CCN CONVERSION:
Project or DCP/mP WA Calc No.
WA M7 CCN NO. CCN-S!.bject N1 Subchannel Gain Calibration As Found / As Left Data Sheet No.
(.2 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REV DiD l
Unit 2 Channel A Amplifier A-12 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift j
89010183000 01/24/89 AF no work done AL 89012263000 02/06/89 AF
-0.6642 10.000 10.016 0.016 AL 10.000 10.016 0.016 89021608000 03/06/89 AF
-0.6642 10.000 10.024 0.024 0.008 AL 10.000 10.024 0.024 89030807000 03/28/89 AF
-0.6642 10.000 9.993 -0.007 -0.031 AL 10.000 9.993 -0.007 89040097000 04/26/89 AF
-0.6642 10.000 9.992 -0.008 -0.001 -0.024 AL 10.000 9.992 -0.008 89051053000 05/16/89 AF
-0.6642 10.000 9.991 -0.009 -0.001 -0.033 AL 10.000 9.991 -0.009 89052583000 05/31/89 AF
-0.6642 10.000 9.994 -0.006 0.003 0.001 -0.022 AL 10.000 9.994 -0.006 89060468000 06/25/89 AF
-0.6642 10.000 9.990 -0.010 -0.004 -0.002 -0.034 J
AL 10.000 9.990 -0.010 89070440000 07/25/89 AF
-0.6642 10.000 9.990 -0.010 -0.004 -0.005 -0.007 AL 10.000 9.990 -0.010 89072805000 08/11/89 AF
-0.6642 10.000 9.995 -0.005 0.005 -0.003 -0.001 AL 10.000 9.995 -0.005 89082664000 09/08/89 AF
-0.6642 10.000 9.993 -0.007 -0.002 -0.001 -0.002 AL 10.000 9.993 -0.007 89092405000 10/12/89 AF
-0.6642 10.000 9.997 -0.003 0.004 0.007 -0.001 AL 10.000 9.997 -0.003 89101650000 10/15/89 AF
-0.6642 10.000 9.993 -0.007 -0.004 -0.002 -0.001 AL 10.000 9.993 -0.007 89102495000 10/21/89 AF
-0.6642 10.000 9.998 -0.002 0.005 0.005 0.008 AL 10.000 9.998 -0.002 89103006000 11/21/89 AF
-0.6642 10.000 9.997 -0.003 -0.001 0.000 0.002 i
AL 10.000 9.997 -0.003 i
89112176000 12/01/89 AF
-0.6642 10.000 9.994 -0.006 -0.003 0.001 0.001 AL 10.000 9.994 -0.006 89120731000 12/19/89 AF
-0.6642 10.000 10.000 0.000 0.006 0.002 0.003 AL 10.000 10.000 0.000 89122705000 01/18/90 AF
-0.6642 10.00C 10.025 0.025 0.025 0.028 0.032 AL 10.000 10.024 0.024 90012977000 02/15/90 AF
-0.6642 10.000 9.996 -0.004 -0.028 0.003 -0.001 AL 10.000 9.996 -0.004 90021543000 03/09/90 AF
-0.6642 10.000 10.001 0.001 0.005 0.002 0.005 AL 10.000 10.001 0.001 90031693000 04/02/90 AF
-0.6642 10.000 9.998 -0.002 -0.003 -0.026 0.005 AL 10.000 9.998 -0.002 90041283000 04/27/90 AF
-0.6642 10.000 9.997 -0.003 -0.001 0.001 -0.002 AL 10.000 9.997 -0.003 90050306000 05/24/90 AF
-0.6642 10.000 10.001 0.001 0.004 0.000 -0.023 i
i AL 10.000 10.001 0.001 90052861000 06/20/90 AF
-0.6642 10.000 9.999 -0.001 -0.002 0.001 0.003 AL 10.000 9.999 -0.001 90062827000 07/19/50 AF
-0.6642 10.000 10.002 0.002 0.003 0.005 0.001
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET nEun. CCu No.
,,c, o,
CCN CONVER$10N3 Project or DCP/MMP wa Calc No.
WAM CCN NO.
CCN-Subject NI Subchannel Gain Calibration As-Found / As-teft Data Sheet No.
43 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV O
80CKHORST 09/07/93 QUINN 09/10/93 IND
(
l l
AL 10.000 10.002 0.002
)
90080287000 08/19/90 AF
-0.6642 10.000 10.002 0.002 0.000 0.001 0.004 AL 10.000 10.002 0.002 90082021000 08/26/90 AF
-0.6642 10.000 9.999 -0.001 -0.003 0.000 0.002 AL 10.000 9.999 -0.001 90090760000 09/16/90 AF
-0.6642 10.000 10.001 0.001 0.002 -0.001 0.000 l
AL 10.000 10.001 0.001 90091867000 10/15/90 AF
-0.6642 10.000 10.001 0.001 0.000 -0.001 0.002 E
10.000 10.001 0.001 90102648000 11/14/90 AF
-0.6642 10.000 10.107 0.107 0.106 0.108 0.105 AL 10.000 9.998 -0.002 l
90111454000 11/25/90 AF
-0.6642 10.000 9.710 -0.290 -0.291 -0.185 -0.186 AL 10.000 10.000 0.000 90120362000 12/07/90 AF
-0.6642 10.000 9.957 -0.043 -0.044 -0.229 -0.227 l
l AL 10.000 10.005 0.005 90121041000 12/28/90 AF
-0.6642 10.000 10.000 0.000 0.002 -0.333 -0.227 AL 10.000 10.000 0.000 91010549000 01/24/91 AF
-0.6642 10.000 9.999 -0.001 -0.001 -0.043 -0.228 AL 10.000 9.999 -0.001 91012608000 02/21/91 AF
-0.6642 10.000 10.010 0.010 0.011 0.012 -0.323 AL 10.000 10.010 0.010 91030081000 03/10/91 AF
-0.6642 10.000 10.006 0.006 -0.00%
0.006 -0.036 AL 10.000 10.006 0.006 91037133000 04/08/91 AF
-0.6642 10.000 10.029 0.029 0.023 0.030 0.031 AL 10.000 10.029 0.029 91042301000 04/29/91 AF
-0.6642 10.000 10.033 0.033 0.004 0.023 0.033 AL 10.000 10.033 0.033 91050493000 05/06/91 AF
-0.6642 10.000 10.007 0.007 -0.026 0.001 0.008 AL 10.000 10.007 0.007 91051616000 06/04/91 AF
-0.6642 10.000 10.006 0.006 -0.001 -0.023 -0.004 l
AL 10.000 10.006 0.006 i
9106049200007/03/91AF
-0.6642 10.000 10.025 0.025 0.019 -0.008 0.019 l
l AL 10.000 10.025 0.025 91070826000 07/31/91 AF
-0.6642 10.000 10.009 0.009 -0.016 0.002 -0.020 AL 10.000 10.009 0.009 91080847000 08/26/91 AF
-0.6642 10.000 10.007 0.007 -0.002 0.001 -0.026 AL 10.000 10.007 0.007 l
l 91091464000 09/25/91 AF
-0.6642 10.000 10.026 0.026 0.019 0.001 0.019 AL 10.000 10.026 0.026 91100386000 10/28/91 AF
-0.6642 10.000 10.008 0.008 -0.018 -0.001 0.002 AL 10.000 10.000 0.000 91110557000 11/15/91 AF
-0.7142 10.753 10.752 -0.001 -0.009 -0.008 -0.026 AL 10.000 10.002 0.002 I
91111947000 11/26/91 AF
-0.7142 10.000 10.007 0.007 0.005 -0.022 -0.005 AL 10.000 10.007 0.007 91120082000 12/26/91 AF
-0.7142 10.000 10.004 0.004 -0.003 -0.007 -0.006 1
)
AL 10.000 10.004 0.004 i
~~
~ '
y NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET pREtiN. CCN No.
pace 0,
CCN CONVERSION:
Project or DCP/MMP UA Calc No.
.1 u A 00 CCN NO.
CCN-Subject NI Subchannet Geln Cat tbration As.Found / As-left Data
$heet No.
44 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE
!RE DATE REV 0
BOCKHOR$T 09/07/93 QUINN 09/10/93 IND Unit 2 Channel B Amplifier A-10 MonthlQuarter 150 Da M.O.
Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 88121678000 01/09/89 AF
-0.7244 10.000 9.955 -0.045 AL 10.000 9.955 -0.045 89012483000 02/07/89 AF
-0.7244 10.000 9.954 -0.046 -0.001 AL 10.000 9.954 -0.046 89021613000 03/07/89 AF
-0.7244 10.000 9.957 -0.043 0.003 AL 10.000 10.001 0.001 89030696000 03/14/89 AF
-0.7244 10.000 9.998 -0.002 -0.003 -0.001 AL 10.000 9.998 -0.002 89032099000 04/10/89 AF
-0.7244 10.000 10.030 0.030 0.032 0.032 AL 10.000 10.030 0.030 89041272000 05/06/89 AF
-0.7244 10.000 10.090 0.090 0.060 0.089 0.091 AL 10.000 10.000 0.000 89051296000 05/31/89 AF
-0.7244 10.000 9.908 -0.092 -0.092 0.000 0.000 AL 10.000 10.009 0.009 89060469000 06/24/89 AF
-0.7244 10.000 10.004 0.004 -0.005 -0.037 -0.008 AL 10.000 10.004 0.004 89070439000 07/25/89 AF
-0.7244 10.000 10.060 0.060 0.051 -0.046 0.046 AL 10.000 10.000 0.000 89072806000 08/11/89 AF
-0.7244 10.000 9.990 -0.010 -0.010 -0.051 0.004 i
l AL 10.000 9.990 -0.010 89082666000 09/09/89 AF
-0.7244 10.000 10.008 0.008 0.010 0.059 -0.038 AL 10.000 10.008 0.008 89092406000 10/12/89 AF
-0.7244 10.000 10.004 0.004 -0.004 0.004 0.050 AL 10.000 10.004 0.004 89101649000 10/19/89 AF
-0.7244 10.000 10.009 0.009 0.005 0.019 0.060 AL 10.000 10.009 0.009 89102975000 10/26/89 AF
-0.7244 10.000 10.006 0.006 -0.003 -0.002 0.006 AL 10.000 10.006 0.006 89110873000 11/21/89 AF
-0.7244 10.000 10.005 0.005 -0.001 0.001 0.015 AL 10.000 10.005 0.005 89112207000 12/02/89 AF
-0.7244 10.000 10.008 0.008 0.003 -0.001 0.000 AL 10.000 10.008 0.008 89120734000 12/19/89 AF (-0.7244 10.000 10.020 0.020 0.012 0.014 0.016 AL 10.000 10.020 0.020 89122706000 01/19/90 AF
-0.7244 10.000 10.012 0.012 -0.008 0.007 0.003 AL 10.000 10.012 0.012 90012984000 02/15/90 AF
-0.7244 10.000 10.000 0.000 -0.012 -0.008 -0.006 AL 10.000 10.000 0.000 90021544000 03/10/90 AF
-0.7244 10.000 10.000 0.000 0.000 -0.020 -0.005 AL 10.000 10.000 0.000 90031694000 04/02/90 AF
-0.7244 10.000 10.008 0.008 0.008 0.000 0.000 AL 10.000 10.000 0.008 90041284000 04/27/90 AF
-0.7244 10.000 10.006 0.006 -0.002 0.006 -0.014 AL 10.000 10.006 0.006 90050303000 05/24/90 AF
-0.7244 10.000 10.009 0.009 0.003 0.009 -0.003 AL 10.000 10.009 0.009
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET nEun. CCN No.
ncE or CCN CONVERSION:
Project or DCP/NMP _
Calc No.
M A-0D CCN NO.
CCN-v/A Subject N1 Subchemet Gain Calibration As-Found / As Lef t Data Sheet No.
45 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE lRE DATE REV O
BOCO ORST 09/07/93 QUINN 09/10/93 IND 90052862000 06/20/90 AF
-0.7244 10.000 10.010 0.010 0.001 0.002 0.010 AL 10.000 10.010 0.010 90062828000 07/21/90 AF
-0.7244 10.000 10.009 0.009 -0.001 0.003 0.009 AL 10.000 10.009 0.009 90080288000 08/20/90 AF
-0.7244 10.000 10.007 0.007 -0.002 -0.002 -0.001 AL 10.000 10.007 0.007 90082022000 08/27/90 AF
-0.7244 10.000 10.007 0.007 0.000 -0.003 0.001 AL 10.000 10.007 0.007 90090762000 09/16/90 AF
-0.7244 10.000 10.010 0.010 0.003 0.000 0.001 AL 10.000 10.010 0.010 90091868000 10/15/90 AF
-0.7244 10.000 10.003 0.003 -0.007 -0.006 -0.007 AL 10.000 10.003 0.003 90091868000 10/15/90 AF
-0.7244 10.000 10.003 0.003 0.000 -0.007 -0.006 AL 10.000 10.003 0.003 90102G56000 11/17/90 AF
-0.7244 10.000 10.004 0.004 0.001 -0.006 -0.003 AL 10.000 10.004 0.004 90111391000 11/24/90 AF
-0.7244 10.000 10.007 0.007 0.003 0.004 0.000 AL 10.000 10.007 0.007 90120364000 12/08/90 AF
-0.7244 10.000 10.003 0.003 -0.004 0.000 -0.007 AL 10.000 10.003 0.003 90121039000 12/27/90 AF
-0.7244 10.000 9.997 -0.003 -0.006 -0.007 -0.006 AL 10.000 9.997 -0.003 91010236000 01/24/91 AF
-0.7244 10.000 10.012 0.012 0.015 0.005 0.009 AL 10.000 10.012 0.012 91020000000 02/21/91 AF
-0.7244 10.000 10.152 0.152 0.140 0.149 0.148 1
AL 10.000 10.002 0.002 91030082000 03/10/91 AF
-0.7244 10.000 9.864 -0.136 -0.138 -0.004 0.007 AL 10.000 9.999 -0.001 91031736000 04/09/91 AF
-0.7244 10.000 10.011 0.011 0.012 0.014 0.023 l
AL 10.000 10.011 0.011 91042392000 04/29/91 AF
-0.7244 10.000 10.006 0.006 -0.005 -0.131 0.024 AL 10.000 10.006 0.006 91050494000 05/07/91 AF
-0.7244 10.000 9.999 -0.001 -0.007 0.000 0.002 AL 10.000 9.999 -0.001 91051617000 06/04/91 AF
-0.7244 10.000 9.993 -0.007 -0.006 -0.018 -0.144 AL 10.000 9.993 -0.007 91060493000 07/05/91 AF
-0.7244 10.000 10.035 0.035 0.042 0.029 0.036 AL 10.000 10.035 0.035 91070618000 07/31/91 AF
-0.7244 10.000 9.990 -0.010 -0.045 -0.009 -0.021 AL 10.000 9.990 -0.010 91080849000 08/27/91 AF
-0.7244 10.000 9.996 -0.004 0.006 0.003 -0.010 AL 10.000 9.996 -0.004 91091406000 09/26/91 AF
-0.7244 10.000 10.002 0.002 0.006 -0.033 0.003 AL 10.000 10.002 0.002 91100387000 10/25/91 AF
-0.7244 10.000 9.999 -0.001 -0.003 0.009 0.006 AL 10.000 9.999 -0.001 91110555000 11/15/91 AF
-0.7789 10.752 11.096 0.344 0.345 0.348 0.309 AL 10.000 10.004 0.004 91111949000 11/26/91 AF
-0.7789 10.000 9.788 -0.212 -0.216 0.126 0.138 AL 10.000 10.000 0.000 91120093000 12/26/91 AF
-0.7789 10.000 9.915 -0.085 -0.085 0.044 0.047 AL 10.000 10.000 0.008
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET pnEtiN. CCN
=0.
pace 0,
CCN CONVER$10Nt Project or DCP/MMP WA Calc No.
WA-M2 CCN No. CCN-Subject NI Subchannel Gain Calibration As Found / As Left Data Sheet No.
46 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE 0
SOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 2 Ohannel B Amplifier A-11 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 88121678000 01/09/89 AF
-0.6663 10.000 9.991 -0.009 AL 10.000 9.991 -0.009 89012483000 02/07/89 AF
-0.6663 10.000 9.991 -0.009 0.000 AL 10.000 9.991 -0.009 89021613000 03/07/89 AF
-0.6663 10.000 9.997 -0.003 0.006 AL 10.000 9.997 -0.003 89030696000 03/14/89 AF
-0.6663 10.000 9.991 -0.009 -0.006 0.000 AL 10.000 9.991 -0.009 89032099000 04/10/89 AF
-0.6663 10.000 9.990 -0.010 -0.001 -0.001 AL 10.000 9.990 -0.010 89041272000 05/06/89 AF
-0.6663 10.000 9.990 -0.010 0.000 -0.007 -0.001 AL 10.000 9.990 -0.010 89051296000 05/31/89 AF
-0.6663 10.000 9.997 -0.003 0.007 0.006 0.006 AL 10.000 9.997 -0.003 89060469000 06/24/89 AF
-0.6663 10.000 9.995 -0.005 -0.002 0.005 -0.002 AL 10.000 9.995 -0.005 89070439000 07/25/89 AF
-0.6663 10.000 9.995 -0.005 0.000 0.005 0.004 AL 10.000 9.995 -0.005 89072806000 08/11/89 AF
-0.6663 10.000 9.998 -0.002 0.003 0.010 0.008 AL 10.000 9.998 -0.002 89082666000 09/09/89 AF
-0.6663 10.000 9.997 -0.003 -0.001 0.002 0.007 AL 10.000 9 997 -0.003 89092406000 10/12/89 AF
-0.6663 10.000 9.994 -0.006 -0.003 -0.001 -0.003
]
AL 10.000 9.994 -0.006 1
89101649000 10/19/89 AF
-0.6663 10.000 9.995 -0.005 0.001 -0.003 0.000 AL 10.000 9.995 -0.005 89102975000 10/26/89 AF
-0.6663 10.000 9.946 -0.054 -0.049 -0.051 -0.049 AL 10.000 9.946 -0.054 89110873000 11/21/89 AF
-0.6663 10.000 9.994 -0.006 0.048 0.000 -0.004 AL 10.000 9.994 -0.006 89112207000 12/02/89 AF
-0.6663 10.000 9.991 -0.009 -0.003 -0.004 -0.006 AL 10.000 9.991 -0.009 89120734000 12/19/89 AP
-0.6663 10.000 9.995 -0.005 0.004 0.049 0.001 AL 10.000 9.995 -0.005 89122706000 01/19/90 AP
-0.6663 10.000 9.999 -0.001 0.004 0.005 0.004 AL 10.000 9.999 -0.001 90012984000 02/15/90 AF
-0.6663 10.000 9.990 -0.010 -0.009 -0.001 0.044 AL 10.000 9.990 -0.010 90021544000 03/10/90 AF
-0.6663 10.000 9.990 -0.010 0.000 -0.005 -0.004 AL 10.000 9.990 -0.010 90031694000 04/02/90 AF
-0.6663 10.000 10.036 0.036 0.046 0.050 0.045 AL 10.000 10.036 0.036 90041284000 04/27/90 AP
-0.6663 10.000 10.036 0.036 0.000 0.046 0.041 AL 10.000 10.036 0.036 90050303000 05/24/90 AF
-0.6663 10.000 10.040 0.040 0.004 0.050 0.041 AL 10.000 9.999 -0.001 90052862000 06/20/90 AF
-0.6663 10.000 10.000 0.000 0.001 0.005 0.051 AL 10.000 10.000 0.000 90062828000 07/21/90 AF
-0.6663 10.000 9.993 -0.007 -0.007 -0.002 0.044
WES&L DEPARTMENT ICcN N0/
rREuN. CCN No.
PAGE OF CALCULATIONSIEET CCN CONVERSION:
Project or DCP/MMP W/A Calc No.
WA*0D CCN h0.
CCN-I subject NI Subchannel Gain Cal ibration As.Fourd / As teft Data Sheet No.
47 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE i
REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND l
AL 10.000 9.993 -0.007 90080288000 08/20/90 AF
-0.6663 10.000 9.992 -0.008 -0.001 -0.007 -0.003 l
AL 10.000 9.992 -0.000 l
90082022000 08/27/90 AP
-0.6663 10.000 9.993 -0.007 0.001 -0.007 -0.002 l
i AL 10.000 9.993 -0.007 90090762000 09/16/90 AF
-0.6663 10.000 9.993 -0.007 0.000 -0.008 -0.006 AL 10.000 9.993 -0.007 90091868000 10/15/90 AF
-0.6663 10.000 9.991 -0.009 -0.002 -0.003 -0.009 i
)
AL 10.000 9.991 -0.009 90091068000 10/15/90 AF
-0.6663 10.000 9.991 -0.009 0.000 -0.001 -0.002 AL 10.000 9.991 -0.009 90102656000 11/17/90 AF
-0.6663 10.000 9.990 -0.010 -0.001 -0.003 -0.002 AL 10.000 9.990 -0.010
{
90111391000 11/24/90 AF
-0.6663 10.000 9.996 -0.004 0.006 0.005 0.003 AL 10.000 9.996 -0.004 90120364000 12/08/90 AF
-0.6663 10.000 9.990 -0.010 0.000 0.005 0.003 AL 10.000 9.990 -0.010 90121039000 12/27/90 AF
-0.6663 10.000 9.980 -0.020 -0.010 -0.004 -0,005 AL 10.000 9.980 -0.020 91010236000 01/24/91 AF
-0.6663 10.000 9.987 -0.013 0.007 -0.003 0.002 AL 10.000 9.987 -0.013 91020008000 02/21/91 AF
-0.6663 10.000 9.996 -0.004 0.009 0.006 0.012 AL 10.000 9.996 -0.004 91030082000 03/10/91 AF
-0.6663 10.000 9.996 -0.004 0.000 -0.001 0.006 AL 10.000 9.996 -0.004 91031736000 04/09/91 AF
-0.6663 10.000 10.010 0.018 0.022 0.031 0.028 AL 10.000 10.018 0.018 91042392000 04/29/91 AF
-0.6663 10.000 10.016 0.016 -0.002 0.020 0.036 AL 10.000 10.016 0.016 91050494000 05/07/91 AF-
-0.6663 10.000 10.002 0.002 -0.014 0.006 0.015 AL 10.000 10.002 0.002 91051617000 06/04/91 AF
-0.6663 10.000 10.006 0.006 0.004 -0.012 0.010 AL 10.000 10.006 0.006 91060493000 07/05/91 AF
-0.6663 10.000 10.048 0.048 0.042 0.032 0.052 AL 10.000 10.048 0.048 91070618000 07/31/91 AF
-0.6663 10.000 10.006 0.006 -0.042 0.004 -0.012 AL 10.000 10.006 0.006 91080849000 08/27/91 AF
-0.6663 10.000 10,004 0.004 -0.002 -0.002 -0.012 AL 10.000 10.004 0.004 r
91091406000 09/26/91 AF
-0.6663 10.000 10.004 0.004 0.000 -0.044 0.002 AL 10.000 10.004 0.004 91100387000 10/25/91 AF
-0.6663 10.000 10.033 0.033 0.029 0.027 0.027 AL 10.000 10.003 0.003 91110555000 11/15/91 AF
-0.7165 10.753 10.726 -0.027 -0.030 -0.001 -0.045 l
AL 10.000 10.005 0.005 91111949000 11/26/91 AF
-0.7165 10.000 10.011 0.011 0.006 0.005 0.003 1
AL 10.000 10.011 0.011 12/26/91 AF
-0.7165 10.000 10.026 0.026 0.015 -0.009 0.020 f
AL 10.000 10.026 0.026 l
l
WESEL DEPARTMENT ICCN N0/
CALCULATIONSIEE PRELIM. CCN No.
PAGE OF CCN CONVERSION:
i Project or DCP/MMP M/A Calc No.
WA-0U CCN No. CCN-Sihject NI Subchannel Cain Calibration As Found / AS*Left Data Sheet No.
48 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE D
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 2 Channel B Amplifier A-12 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 88121678000 01/09/89 AF
-0.6926 10.000 10.018 0.018 AL 10.000 10.018 0.018 89012483000 02/07/89 AF
-0.6926 10.000 10.019 0.019 0.001 AL 10.000 10.019 0.019 89021613000 03/07/89 AF
-0.6926 10.000 10.024 0.024 0.005 AL 10.000 10.024 0.024 89030696000 03/14/89 AF
-0.6926 10.000 10.019 0.019 -0.005 0.001 AL 10.000 10.019 0.019 89032099000 04/10/89 AF
-0.6926 10.000 10.020 0.020 0.001 0.001 AL 10.000 10.020 0.020 89041272000 05/06/89 AF
-0.6926 10.000 10.020 0.020 0.000 -0.004 0.002 AL 10.000 10.020 0.020 89051296000 05/31/89 AF
-0.6926 10.000 10.034 0.034 0.014 0.015 0.015 I
AL 10.000 10.008 0.008 89060469000 06/24/89 AF
-0.6926 10.000 10.005 0.005 -0.003 0.011 0.007 AL 10.000 10.005 0.005 89070439000 07/25/89 AF
-0.6926 10.000 10.000 0.000 -0.000 0.003 0.004 AL 10.000 10.000 0.000 89072806000 08/11/89 AF
-0.6926 10.000 10.003 0.003 0.003 0.009 0.006 AL 10.000 10.003 0.003 89082666000 09/09/89 AF
-0.6926 10.000 10.000 0.000 -0.003 -0.000 0.003 AL 10.000 10.000 0.000 89092406000 10/12/89 AF
-0.6926 10.000 10.015 0.015 0.015 0.015 0.004 AL 10.000 10.015 0.015 89101649000 10/19/89 AF
-0.6926 10.000 10.014 0.014 -0.001 0.011 0.006 AL 10.000 10.014 0.014 89102975000 10/26/89 AF
-0.6926 10.000 10.019 0.019 0.005 0.019 0.019 AL 10.000 10.019 0.019 89110873000 11/21/89 AF
-0.6926 10.000 10.010 0.010 -0.009 -0.005 0.007 AL 10.000 10.010 0.010 89112207000 12/02/89 AF
-0.6926 10.000 10.228 0.228 0.218 0.214 0.228 AL 10.000 10.005 0.005 89120734000 12/19/89 AF
-0.6926 10.000 9.842 -0.158 -0.163 0.046 0.050 AL 10.000 10.000 0.008 89122706000 01/19/90 AF
-0.6926 10.000 9.901 -0.099 -0.107 -0.052 -0.056 AL 10.000 9.991 -0.009 90012984000 02/15/90 AF
-0.6926 10.000 9.991 -0.009 0.000 -0.270 -0.061 AL 10.000 9.991 -0.009 90021544000 03/10/90 AF
-0.6926 10.000 9.997 -0.003 0.006 -0.101 -0.046 AL 10.000 9.997 -0.003 90031694000 04/02/90 AF
-0.6926 10.000 9.993 -0.007 -0.004 -0.105 -0.268 AL 10.000 9.993 -0.007 90041284000 04/27/90 AF
-0.6926 10.000 9.993 -0.007 0.000 0.002 -0.105 AL 10.000 9.993 -0.007 90050303000 05/24/90 AF
-0.6926 10.000 9.998 -0.002 0.005 0.001 0.007 AL 10.000 9.998 -0.002 90052862000 06/20/90 AF
-0.6926 10.000 9.997 -0.003 -0.001 0.004 0.006 AL 10.000 9.997 -0.003 90062828000 07/21/90 AF
-0.6926 10.000 9.996 -0.004 -0.001 0.003 -0.001
i NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET p.E u m.
CCN No.
PACE Or CCN CONVER$10N:
Project or DCP/MMP WA Calc No, MF A nD CCN NO.
CCN-Subject N1 Subchannel Cain Cal{bration As*Found / As-tef t Data Sheet No.
49 REV ORIGINATOR DATE
!RE DATE REV ORIGINATOR DATE 1RE DATE REV 0
BOCKHORST 09/07/93 QUINN 09/10/93 INO AL 10.000 9.996 -0.004 90080280000 08/20/90 AF
-0.6926 10.000 9.994 -0.006 -0.002 -0.004 0.001 AL 10.000 9.994 -0.006 90082022000 08/27/90 AF
-0.6926 10.000 9.995 -0.005 0.001 -0.002 0.002 AL 10.000 9.995 -0.005 90090762000 09/16/90 AF
-0.6926 10.000 10.000 0.000 0.005 0.002 0.002 AL 10.000 10.000 0.000 90091868000 10/15/90 AF
-0.6926 10.000 9.996 -0.004 -0.004 -0.001 -0.001 AL 10.000 9.996 -0.004 90091868000 10/15/90 AF
-0.6926 10.000 9.996 -0.004 0.000 -0.003 0.000 AL 10.000 9.996 -0.004 90102656000 11/17/90 AF
-0.6926 10.000 9.992 -0.008 -0.004 -0.008 -0.002 AL 10.000 9.992 -0.008 90111391000 11/24/90 AF
-0.6926 10.000 9.998 -0.002 0.006 0.002 0.003 AL 10.000 9.998 -0.002 90120364000 12/08/90 AF
-0.6926 10.000 9.994 -0.006 0.002 0.004 -0.000 AL 10.000 9.994 -0.006 90121039000 12/27/90 AF
-0.6926 10.000 10.012 0.012 0.018 0.026 0.022 AL 10.000 10.012 0.012 91010236000 01/24/91 AF
-0.6926 10.000 10.012 0.012 0.000 0.020 0.022 AL 10.000 10.012 0.012 91020008000 02/21/91 AF
-0.6926 10.000 9.997 -0.003 -0.015 0.003 0.011 AL 10.000 9.997 -0.003 91030082000 03/10/91 AF
-0.6926 10.000 9.999 -0.001 0.002 0.005 0.007 AL 10.000 9.999 -0.001 91031736000 04/09/91 AF
-0.6926 10.000 9.998 -0.002 -0.001 -0.014 0.004 AL 10.000 9.998 -0.002 91042392000 04/29/91 AF
-0.6926 10.000 9.998 -0.002 0.000 0.001 -0.014 AL 10.000 9.998 -0.002 91050494000 05/07/91 AF
-0.6926 10.000 9.997 -0.003 -0.001 -0.002 -0.015 Al 10.000 9.997 -0.003 91051617000 06/04/91 AF
-9.6926 10.000 9.995 -0.005 -0.002 -0.003 -0.002 AL 10.000 9.995 -0.005 91060493000 07/05/91 AF
-0.6926 10.000 10.038 0.038 0.043 0.040 0.039 AL 10.000 10.038 0.038 91070618000 07/31/91 AF
-0.6926 10.000 10.001 0.001 -0.037 0.004 0.003 AL 10.000 10.001 0.001 91080849000 08/27/91 AF
-0.6926 10.000 10.001 0.001 0.000 0.006 0.003 AL 10.000 10.001 0.001 91091406000 09/26/91 AF
-0.6926 10.000 10.002 0.002 0.001 -0.036 0.005 AL 10.000 10.002 0.002 91100387000 10/25/91 AF
-0.6926 10.000 10.000 0.000 -0.002 -0.001 0.005 AL 10.000 10.000 0.000 91110555000 11/15/91 AF
-0.7447 10.752 10.745 -0.007 -0.007 -0.008 -0.045 AL 10.000 10.002 0.002 91111949000 11/26/91 AF
-0.7447 10.000 10.008 0.008 0.006 -0.003 -0.002 AL 10.000 10.008 0.008 12/26/91 AP
-0.7477 10.000 10.000 0.000 -0.008 -0.009 -0.010 AL 10.000 10.000 0.000
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET
, retin. CCN NO.
pace 0,
CCN CONVERSION:
Project or DCP/MMP W/A Calc No.
.f tF A.nD CCN NO.
CCN-Subject N1 Subchannel Geln Calibration As-Found / As-Left Data Sheet No.
50 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE 0
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 2 Channel C Amplifier A-10 MonthlQuarter 150 Da M.O.
Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 88121870000 01/14/89 AF no work done AL 89011492000 02/07/89 AF
-0.6664 10.000 10.002 0.002 AL 10.000 10.002 0.002 89021616000 03/07/89 AF
-0.6664 10.000 10.004 0.004 0.002 AL 10.000 10.004 0.004 89031271000 03/21/89 AF
-0.6664 10.000 10.004 0.004 0.000 AL 10.000 10.004 0.004 89033752000 04/20/89 AF
-0.6664 10.000 10.004 0.004 0.000 0.002 AL 10.000 10.004 0.004 89050273000 05/16/89 AF
-0.6664 10.000 10.003 0.003 -0.001 -0.001 AL 10.000 10.003 0.003 89052585000 05/31/89 AF
-0.6664 10.000 10.005 0.005 0.002 0.001 0.003 AL 10.000 10.005 0.005 89060480000 06/28/89 AF
-0.6664 10.000 10.001 0.001 -0.004 -0.003 -0.003 AL 10.000 10.001 0.001 89070441000 07/25/09 AF
-0.6664 10.000 10.001 0.001 -0.004 -0.006 -0.007 AL 10.000 10.001 0.001 89072807000 08/21/89 h7
-0.6664 10.000 10.003 0.003 0.002 -0.006 -0.005 AL 10.000 10.003 0.003 i
89083627000 09/19/89 AF
-0.6664 10.000 10.000 0.000 -0.003 -0.005 -0.007 AL 10.000 10.000 0.000 89100672000 10/15/89 AF
-0.6664 10.000 10.002 0.002 0.002 0.001 -0.007 AL 10.000 10.002 0.002 89102498000 10/21/89 AF
-0.6664 10.000 10.001 0.001 -0.001 -0.002 -0.004 l
AL 10.000 10.001 0.001 89103007000 11/20/89 AF
-0.6664 10.000 10.000 0.000 -0.001 0.000 -0.001 AL 10.000 10.000 0.000 i
89112164000 12/01/89 AF ( -0.6664 10.000 9.991 -0.009 -0.009 -0.011 -0.012 l
AL 10.000 9.991 -0.009 89120733000 12/29/89 AF
-0.6664 10.000 9.995 -0.005 0.004 -0.006 -0.005 AL 10.000 9.995 -0.005 90010735000 01/25/90 AF
-0.6664 10.000 9.999 -0.001 0.004 -0.001 -0.003 AL 10.000 9.999 -0.001 90013542000 02/22/90 AF
-0.6664 10.000 9.995 -0.005 -0.004 0.004 -0.006 AL 10.000 9.995 -0.005 90022603000 03/10/90 AF
-0.6664 10.000 9.998 -0.002 0.003 0.003 -0.002 AL 10.000 9.998 -0.002 90031687000 04/09/90 AF
-0.6664 10.000 9.996 -0.004 -0.002 -0.003 0.005 AL 10.000 9.996 -0.004 90041325000 05/06/90 AF
-0.6664 10.000 9.999 -0.001 0.003 0.004 0.004
.I AL 10.000 9.999 -0.001 l
90051332000 06/04/90 AF
-0.6664 10.000 9.997 -0.003 -0.002 -0.001 -0.002 l
AL 10.000 9.997 -0.003 f
90060750000 06/29/90 AF
-0.6664 10.000 10.000 0.000 0.003 0.004 0.005 i
l AL 10.000 10.000 0.000 I
l 90070744000 07/30/90 AF
-0.6664 10.000 9.997 -0.003 -0.003 -0.002 -0.001 AL 10.000 9.997 -0.003 90080243000 08/21/90 AF
-0.6664 10.000 10.000 0.000 0.003 0.003 0.004
NES&L DEPARTMENT ICCN N0/
i pREun. CCN NO.
pace Or CALCULATIONSHEET CCN CONVERSION:
MIA Cate No.
.1 M -017 CCN NO.
CCN-Project or DCP/MMP Sheet No.
51 Subject NT Subchannel Cain Calibration As Found / As Left Data DATE REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND AL 10.000 10.000 0.000 90082023000 08/27/90 AF
-0.6664 10.000 9.996 -0.004 -0.004 -0.004 -0.003 AL 10.000 9.996 -0.004 90090926000 09/25/90 AF
-0.6664 10.000 10.004 0.004 0.008 0.007 0.007 AL 10.000 10.004 0.004 90100184000 10/24/90 AF
-0.6664 10.000 10.009 0.009 0.005 0.009 0.009 AL 10.000 10.009 0.009 90110042000 11/20/90 AF
-0.6664 10.000 10.004 0.004 -0.005 0.008 0.007 AL 10.000 10.004 0.004 90111741000 11/27/90 AF
-0.6664 10.000 9.970 -0.030 -0.034 -0.034 -0.030 AL 10.000 9.970 -0.030 90120366000 12/08/90 AF
-0.6664 10.000 9.967 -0.033 -0.003 -0.042 -0.029 AL 10.000 9.967 -0.033 90121036000 01/07/91 AF
-0.6664 10.000 9.997 -0.003 0.030 -0.007 -0.007 AL 10.000 9.997 -0.003 91010967000 02/06/91 AF
-0.6664 10.000 9.994 -0.006 -0.003 0.024 -0.015 AL 10.000 9.994 -0.006 91021144000 03/07/91 AF
-0.6664 10.000 9.997 -0.003 0.003 0.030 -0.007 j
AL 10.000 9.997 -0.003 91031735000 04/04/91 AF
-0.6664 10.000 10.001 0.001 0.004 0.004 0.031 r
l AL 10.000 10.001 0.001 91041514000 04/29/91 AF
-0.6664 10.000
-0.6664 10.000 9.998 -0.002 0.001 0.001 0.001 AL 10.000 9.998 -0.002 91051696000 05/31/91 AF
-0.6664 10.000 9.996 -0.004 -0.002 -0.005 0.002 AL 10.000 9.996 -0.004 91060490000 06/29/91 AF
-0.6664 10.000 10.001 0.001 0.005 0.004 0.004 AL 10.000 10.001 0.001 91070149000 07/22/91 AF
-0.6664 10.000 9.999 -0.001 -0.002 0.001 -0.002 AL 10.000 9.999 -0.001 91072315000 08/20/91 AF
-0.6664 10.000 10.001 0.001 0.002 0.005 0.004 AL 10.000 10.001 0.001 91090257000 09/19/91 AF
-0.6664 10.000 10.003 0.003 0.002 0.002 0.005 AL 10.000 10.003 0.003 91091916000 10/19/91 AF
-0.6664 10.000 9.999 -0.001 -0.004 0.000 0.003 AL 10.000 9.999 -0.001 91102434000 11/14/91 AF
-0.7166 10.753 10.746 -0.007 -0.006 -0.008 -0.008 AL 10.000 10.002 0.002 91111934000 12/13/91 AF
-0.7166 10.000 10.007 0.007 0.005 *0.005 -0.001 AL 10.000 10.007 0.007 l
4 A
l NES&L DEPARTi4ENT ICCN NO/
CALCULATIONSIEET paEtin. CCN No.
PAGE Or CCN CONVER$10N:
Project or DCP/MMP M/A Calc No.
J wa-m CCN NO.
CCN-S4]ect N1 Subchennet Gain CeH bratlon As-Found / As Lef t Data Sheet No.
52 1
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCKHORST 09/07/93 QUINN 09/10/93
!ND Unit 2 Channel C Amplifier A-11 MonthlQuarter 150 Da Date Cal Cur.
Reg'dCal Dat CD-Req " Drift " Drift " Drift 88121870000 01/14/89 AF no work done AL 89011492000 02/07/89 AF
-0.6514 10.000 10.008 0.008 AL 10.000 10.000 0.008 89021616000 03/07/89 AF
-0.6514 10.000 10.008 0.008 0.000 AL 10.000 10.000 0.008 89031271000 03/21/89 AF
-0.6514 10.000 10.011 0.011 0.003 AL 10.000 10.011 0.011 89033752000 04/20/89 AF
-0.6541 10.000 10.059 0.059 0.048 0.051 AL 10.000 10.023 0.023 89050273000 05/16/89 AF
-0.6514 10.000 9.982 -0.018 -0.041 0.010 AL 10.000 9.982 -0.018 89052585000 05/31/89 AF
-0.6514 10.000 9.982 -0.018 0.000 0.007 0.010 AL 10.000 9.998 -0.002 89060480000 06/28/89 AF
-0.6514 10.000 9.996 -0.004 -0.002 -0.043 0.008 AL 10.000 9.996 -0.004 89070441000 07/25/89 AF
-0.6514 10.000 9.999 -0.001 0.003 0.001 0.008 AL 10,000 9.999 -0.001 89072807000 08/22/89 AF
-0.6514 10.000 9.999 -0.001 0.000 0.001 -0.040 AL 10.000 9.999 -0.001 89083627000 09/19/89 AF
-0.6514 10.000 9.990 -0.010 -0.009 -0.006 -0.008 AL 10.000 9.990 -0.010 89100672000 10/15/89 AF
-0.6514 10.000 9.993 -0.007 0.003 -0.006 -0.005 i
1 AL 10.000 9.993 -0.007 89102498000 10/21/89 AF
-0.6514 10.000 9.993 -0.007 0.000 -0.006 -0.003 AL 10.000 9.993 -0.007 89103007000 11/20/89 AF
-0.6514 10.000 9.996 -0.004 0.003 0.006 -0.003 AL 10.000 9.996 -0.004 89112164000 12/01/89 AF
-0.6514 10.000 9.990 -0.010 -0.006 -0.003 -0.009 AL 10.000 9.990 -0.010 89120733000 12/29/89 AF
-0.6514 10.000 9.998 -0.002 0.008 0.005 0.008 AL 10.000 9.998 -0.002 90010735000 01/25/90 AF
-0.6514 10.000 9.993 -0.007 -0.005 -0.003 0.000 AL 10.000 9.993 -0.007 90013542000 02/22/90 AF
-0.6514 10.000 9.990 -0.010 -0.003 0.000 -0.003 AL 10.000 9.990 -0.010 90022603000 03/10/90 AF
-0.6514 10.000 9.996 -0.004 0.006 -0.002 0.000 AL 10.000 9.996 -0.004 90031687000 04/09/90 AF
-0.6514 10.000 9.982 -0.018 -0.014 -0.011 -0.008 AL 10.000 9.982 -0.018 90041325000 05/06/90 AF
-0.6514 10.000 9.987 -0.013 0.005 -0.003 -0.011 AL 10.000 9.987 -0.013 90051332000 06/04/90 AF
-0.6514 10.000 9.985 -0.015 -0.002 -0.011 -0.008 AL 10.000 9.985 -0.015 92n60750000 06/29/90 AF
-0.6514 10.000 9.984 -0.016 -0.001 0.002 -0.006 AL 10.000 9.984 -0.016 90070744000 07/30/90 AF
-0.6514 10.000 9.981 -0.019 -0.003 -0.006 -0.015 AL 10.000 9.981 -0.019 90080243000 08/21/90 AF
-0.6514 10.000 9.984 -0.016 0.003 -0.001 0.002
NES&L DEPARTMEN*I' ICCN N0/
i PnEtin. CCN NO.
, AGE or CALCULATIONSIEET 1
CCN CONVERSION:
Project or DCP/MMP v/a Calc No.
J-" A-n D CCN NO.
CCN-Subject N1 Subchannel Gain Callbration As-Found / As-Left Data Sheet No.
53 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV 0
BOCKHORST 09/07/93 QUINN 09/10/93 IND 1
AL 10.000 10.002 0.002 90082023000 08/27/90 AF
-0.6514 10.000 9.990 -0.010 -0.012 -0.012 -0.015 AL 10.000 9.990 -0.010 90090926000 09/25/90 AF
-0.6514 10.000 9.991 -0.009 0.001 -0.000 -0.012 AL 10.000 9.991 -0.009 90100184000 10/24/90 AF
-0.6514 10.000 9.983 -0.017 -0.000 -0.019 -0.019 AL 10.000 9.983 -0.017 90110042000 11/20/90 AF
-0.6514 10.000 9.986 -0.014 0.003 -0.004 -0.013 AL 10.000 9.986 -0.014 90111741000 11/27/90 AF
-0.6514 10.000 10.033 0.033 0.047 0.042 0.031 AL 10.000 10.033 0.033 90120366000 12/08/90 AF
-0.6514 10.000 9.985 -0.015 -0.048 0.002 -0.005 AL 10.000 9.985 -0.015 90121036000 01/07/91 AF
-0.6514 10.000 9.985 -0.015 0.000 -0.001 -0.006 AL 10.000 9.985 -0.015 91010967000 02/06/91 AF
-0.6514 10.000 10.005 0.005 0.020 -0.028 0.022 AL 10.000 10.005 0.005 91021144000 03/07/91 AF
-0.6514 10.000 10.005 0.005 0.000 0.020 0.019 AL 10.000 10.005 0.005 91031735000 04/04/91 AF
-0.6514 10.000 10.007 0.007 0.002 0.022 -0.026 AL 10.000 10.007 0.007 91041514000 04/29/91 AF
-0.6514 10.000 10.007 0.007 0.000 0.002 0.022 AL 10.000 10.007 0.007 91050495000 05/07/91 AF
-0.6514 10.000 10.013 0.013 0.006 0.008 0.028 AL 10.000 10.013 0.013 91051696000 05/31/91 AF
-0.6514 10.000 10.011 0.011 -0.002 0.004 0.006 AL 10.000 10.011 0.011 v1060490000 06/29/91 AF
-0.6514 10.000 10.014 0.014 0.003 0.007 0.009 AL 10.000 10.014 0.014 91070149000 07/22/91 AF
-0.6514 10.000 10.013 0.013 -0.001 0.000 0.006 AL 10.000 10.013 0.013 91072315000 08/20/91 AF
-0.6514 10.000 10.015 0.015 0.002 0.004 0.008 AL 10.000 10.015 0.015 91090257000 09/19/91 AF
-0.6514 10.000 10.018 0.018 0.003 0.004 0.005 AL 10.000 10.018 0.018 91091916000 10/19/91 AF
-0.6514 10.000 10.015 0.015 -0.003 0.002 0.004 AL 10.000 10.015 0.015 91102434000 11/14/91 AF
-0.7004 10.752 10.768 0.016 0.001 0.001 0.002 AL 10.000 10.001 0.001 91111934000 12/13/91 AF
-0.7004 10.000 9.998 -0.002 -0.003 -0.005 -0.000 AL 10.000 9.998 -0.002 l
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET PREun. CCW NO.
PACE Or CCN CONVERSION:
Project or DCP/MMP WIA Calc No.
J.tra.n u CCN No. CCN-Subject WI Subchannel Gain Cau bration As Found / As-l. eft Data Sheet No.
54 REV ORIGINATOR DATE 1RE DATE REV ORIG!NATOR DATE IRE DATE REV D
BOCKHORST 09/07/93 QUINN 09/10/93 IND Unit 2 Channel C Amplifier A-12 MonthlQuarter 150 Da Date Cal Cur.
Req' dCal Dat CD-Req "Drif t "Drif t " Drift 88121870000 01/14/89 AF no work done AL 89011492000 02/07/89 AF
-0.6525 10.000 10.004 0.004 AL 10.000 10.004 0.004 89021616000 03/07/89 AF
-0.6525 10.000 10.005 0.005 0.001 AL 10.000 10.005 0.005 89031271000 03/21/89 AF
-0.6525 10.000 10.007 0.007 0.002 AL 10.000 10.007 0.007 89033752000 04/20/89 AF
-0.6525 10.000 10.005 0.005 -0.002 0.001 AL 10.000 10.005 0.005 89050273000 05/16/89 AF
-0.6525 10.000 10.005 0.005 0.000 0.000 AL 10.000 10.005 0.005 89052585000 05/31/89 AF
-0.6525 10.000 10.008 0.008 0.003 0.001 0.004 AL 10.000 10.008 0.008 89060480000 06/28/89 AF
-0.6525 10.000 10.003 0.003 -0.005 -0.002 -0.002 i
AL 10.000 10.003 0.003 89070441000 07/25/09 AF
-0.6525 10.000 10.004 0.004 -0.004 -0.006 -0.008 AL 10.000 10.004 0.004 89072807000 08/22/89 AF
-0.6525 10.000 10.009 0.009 0.005 -0.004 -0.001 f
AL 10.000 10.009 0.009 89083627000 09/19/89 AF
-0.6525 10.000 10.000 0.000 -0.009 -0.008 -0.010 AL 10.000 10.000 0.000 89100672000 10/15/89 AF
-0.6525 10.000 10.004 0.004 0.004 0.000 -0.009 AL 10.000 10.004 0.004 89102498000 10/21/89 AF
-0.6525 10.000 10.003 0.003 -0.001 -0.006 -0.005 AL 10.000 10.003 0.003 89103007000 11/20/89 AF
-0.6525 10.000 10.009 0.009 0.006 0.009 0.005 AL 10.000 10.009 0.009 89112164000 12/01/89 AF
-0.6525 10.000 9.991 -0.009 -0.018 -0.013 -0.018 AL 10.000 9.991 -0.009 89120733000 12/29/89 AF
-0.6525 10.000 10.000 0.000 0.009 -0.003 0.000 AL 10.000 10.000 0.000 90010735000 01/25/90 AF
-0,6525 10.000 10.004 0.004 0.004 -0.005 0.000 AL 10.000 10.004 0.004 90013542000 02/22/90 AF
-0.6525 10.000 10.000 0.000 -0.004 0.009 -0.003 AL 10.000 10.000 0.000 90022603000 03/10/90 AF
-0.6525 10.000 10.006 0.006 0.006 0.006 -0.003 AL 10.000 10.006 0.006 90031687000 04/09/90 AF
-0.6525 10.000 10.003 0.003 -0.003 -0.001 0.012 AL 10.000 10.003 0.003 90041325000 05/06/90 AF
-0.6525 10.000 10.006 0.006 0.003 0.006 0.006 AL 10.000 10.006 0.006 90051332000 06/04/90 AF
-0.6525 10.000 10.000 0.008 0.002 0.002 0.004 AL 10.000 10.008 0.008 90060750000 06/29/90 AF
-0.6525 10.000 10.005 0.005 -0.003 0.002 0.005 AL 10.000 10.005 0.005 90070744000 07/30/90 AF
-0.6525 10.000 10.001 0.001 -0.004 -0.005 -0.005 AL 10.000 10.001 0.001 90080243000 08/21/90 AF
-0.6525 10.000 10.007 0.007 0.006 -0.001 0.004
s &
m.-
n a
NESEL DEPARTMENT ICCN N0/
CALCULATIONSHEET rREuN. CCN No.
Pace or CCN CONVERSloN:
Project or DCP/MMP WA Calc No.
3-tF A-0D CCN NO.
CCN-SLbject NT Subchannel Gain Calibration As Found / As-teft Data Sheet No.
55 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE D
BOCKHORsf 09/07/93 QUINN 09/10/93 REV IND AL 10.000 10.007 0.007 90082023000 08/27/90 AF
-0.6525 10.000 10.005 0.005 -0.002 0.000 -0.001 AL 10.000 10.005 0.005 90090926000 09/25/90 AF
-0.6525 10.000 10.005 0.005 0.000 0.004 -0.003 AL 10.000 10.005 0.005 90100184000 10/24/90 AF
-0.6525 10.000 10.003 0.003 -0.002 -0.004 -0.002 AL 10.000 10.003 0.003 90110042000 11/20/90 AF
-0.6525 10.000 10.008 0.008 0.003 0.001 0.005 AL 10.000 10.000 0.008 90111741000 11/27/90 AF
-0.6525 10.000 10.010 0.010 0.005 0.006 0.004 AL 10.000 10.010 0.010 90120366000 12/08/90 AF
-0.6525 10.000 10.006 0.006 0.003 0.011 0,009 AL 10.000 10.006 0.006 90121036000 01/07/91 AF
-0.6525 10.000 10.003 0.003 -0.003 0.005 0.006 AL 10.000 10.003 0.003 91010967000 02/06/91 AF
-0.6525 10.000 10.003 0.003 0.000 0.000 0.008 AL 10.000 10.003 0.003 91021144000 03/07/91 AF
-0.6525 10.000 10.002 0.002 -0.001 -0.004 0.004 AL 10.000 10.002 0.002 91031735000 04/04/91 AF
-0.6525 10.000 10.009 0.009 0.007 0.006 0.006 AL 10.000 10.009 0.009 91041514000 04/29/91 AF
-0.6525 10.000 10.005 0.005 -0.004 0.002 -0.001 AL 10.000 10.005 0.005 91050495000 05/07/91 AF
-0.6525 10.000 10.006 0.006 0.001 0.004 0.003 AL 10.000 10.006 0.006 91051696000 05/31/91 AF
-0.6525 10.000 10.004 0.004 -0.002 -0.005 0.001 AL 10.000 10.004 0.004 91060490000 06/29/91 AF
-0.6525 10.000 10.007 0.007 0.003 0.002 0.005 AL 10.000 10.007 0.007 91070149000 07/22/91 AF
-0.6525 10.000 10.000 0.000 -0.007 -0.006 -0.009 AL 10.000 10.000 0.000 91072315000 08/20/91 AF
-0.6525 10.000 9.997 -0.003 -0.003 -0.007 -0.008 AL 10.000 9.997 -0.003 91090257000 09/19/91 AF
-0.6525 10.000 10.011 0.011 0.014 0.004 0.005 AL 10.000 10.011 0.011 91091916000 10/19/91 AF
-0.6525 10.000 10.008 0.008 -0.003 0.008 0.004 AL 10.000 10.008 0.008 91102434000 11/14/91 AF
-0.7016 10.752 10.756 0.004 -0.004 0.007 -0.003 AL 10.000 10.003 0.003 91111934000 12/13/91 AF
-0.7016 10.000 10.003 0.003 0.000 -0.007 0.004 AL 10.000 10.003 0.003
- - - _ ~ -
NES&L DEPARTMENT ICCN NO/
CALCULATIONSHEET PReuw. CCN NO.
PACE Or CCN CONVERSION:
Project or DCP/MMP M/A Calc No.
WAN CCN NO.
CCN-Subject N! Subchannet Gain Calibration As Found / As-Lef t Osta Sheet No.
56 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE REV D
BOCKHORST 09/07/93 QUINN 09/10/93 IND Unit 2 Channel D Amplifier A-10 MonthlQuarter 150 Da M.O.
Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89011488000 01/24/89 AF no work done AL 89012265000 02/06/89 AF
-0.7033 10.000 10.017 0.017 AL 10.000 10.017 0.017 89021612000 03/06/89 AF
-0.7033 10.000 10.016 0.016 -0.001 AL 10.000 10.016 0.016 89030806000 03/17/89 AF
-0.7033 10.000 10.004 0.004 -0.012 AL 10.000 10.004 0.004 89032100000 04/16/89 AF
-0.7033 10.000 10.000 0.000 -0.004 -0.017 AL 10.000 10.000 0.000 89042472000 05/15/89 AF
-0.7033 10.000 10.001 0.001 0.001 -0.015 AL 10.000 10.001 0.001 89052562000 06/01/89 AF
-0.7033 10.000 10.011 0.011 0.010 0.007 -0.006 AL 10.000 10.011 0.011 89060482000 06/30/89 AF
-0.7033 10.000 10.002 0.002 -0.009 0.002 -0.014 AL 10.000 10.002 0.002 89070479000 07/25/89 AF
-0.7033 10.000 10.001 0.001 -0.010 -0.009 -0.012 AL 10.000 10.001 0.001 89072808000 08/22/89 AF
-0.7033 10.000 10.002 0.002 0.001 -0.018 -0.007 AL 10.000 10.002 0.002 89083628000 09/20/89 AF
-0.7033 10.000 10.003 0.003 0.001 -0.008 -0.007 AL 10.000 10.003 0.003 89100673000 10/15/89 AF
-0.7033 10.000 10.002 0.002 -0.001 0.001 -0.018 AL 10.000 10.002 0.002 89102499000 10/21/89 AF
-0.7033 10.000 10.002 0.002 0.000 0.000 -0.C09 AL 10.000 10.002 0.002 89103000000 11/20/89 AF
-0.7033 10.000 10.008 0.000 0.006 0.005 0.007 AL 10.000 10.008 0.008 89112163000 12/01/89 AF ( -0.7033 10.000 10.005 0.005 -0.003 0.003 0.003 AL 10.000 10.005 0.005 89120732000 12/29/89 AF
-0.7033 10.000 10.000 0.000 -0.005 -0.002 -0,003 AL 10.000 10.000 0.000 90010740000 01/25/90 AF
-0.7033 10.000 9.993 -0.007 -0.007 -0.015 -0.009 AL 10.000 9.993 -0.007 90020026000 02/23/90 AF
-0.7033 10.000 9.989 -0.011 -0.004 -0.016 -0.013 AL 10.000 9.989 -0.011 90030372000 03/10/90 AF
-0.7033 10.000 10.000 0.000 0.011 0.000 -0.008 AL 10.000 10.000 0.000 90031695000 04/09/90 AF
-0.7033 10.000 9.999 -0.001 -0.001 0.006 -0.006 AL 10.000 9.999 -0.001 90041326000 05/06/90 AF
-0.7033 10.000 10.004 0.004 0.005 0.015 0.004 AL 10.000 10.004 0.004 90051333000 06/04/90 AF
-0.7033 10.000 10.000 0.008 0.004 0.008 0.015 AL 10.000 10.008 0.008 90060748000 07/01/90 AF
-0.7033 10.000 10.003 0.003 -0.005 0.004 0.014 AL 10.000 10.003 0.003 90070746000 07/28/90 AF
-0.7033 10.000 10.002 0.002 -0.001 -0.002 0.002 AL 10.000 10.002 0.002 90080598000 08/26/90 AF
-0.7033 10.000 10.000 0.000 -0.002 -0.000 0.001
BUES&L DEPFJUDMENT ICCN N0/
CALCULATIONSHEET partin. CCN NO.
pact Or CCN CONVERSION:
1 Project or DCP/nMP WIA Calc No.
J U A-01?
CCN NO.
CCN-Stbject NI Stbehannel Cain Calibration As-Found / As tef t Data Sheet No.
$7 l
REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE 0
80CKHORST 09/07/93 QUINN 09/10/93 REV Dio
)
i l
l AL 10.000 10.000 0.000 90090925000 09/25/90 AF
-0.7033 10.000 10.002 0.002 0.002 -0.001 -0.002 AL 10.000 10.002 0.002
)
90100185000 10/24/90 AF
-0.7033 10.000 10.000 0.000 -0.002 -0.002 -0.008 AL 10.000 10.000 0.000 90110045000 11/20/90 AF
-0.7033 10.000 10.005 0.005 0.005 0.005 0.002 AL 10.000 10.005 0.005 90120367000 12/08/90 AF
-0.7033 10.000 9.990 -0.010 -0.015 -0.012 -0.012 AL 10.000 9.990 -0.010 90121034000 01/07/91 AF
-0.7033 10.000 9.994 -0.006 0.004 -0.006 -0.006
)
AL 10.000 9.994 -0.006 91010971000 02/07/91 AF
-0.7033 10.000 9.992 -0.008 -0.002 -0.013 -0.010 AL 10.000 9.992 -0.000 91010971000 03/07/91 AF
-0.7033 10.000 9.994 -0.006 0.002 0.004 -0.006 AL 10.000 9.994 -0.006 91021145000 04/04/91 AF
-0.7033 10.000 10.006 0.006 0.012 0.012 0.001 AL 10.000 10.006 0.006 91031734000 04/29/91 AF
-0.7033 10.000 10.000 0.000 -0.006 0.008 0.010 AL 10.000 10.000 0.000 91041516000 05/07/91 AF
-0.7033 10.000 10.004 0.004 0.004 0.010 0.010 AL 10.000 10.004 0.004 91050496000 05/31/91 AF
-0.7033 10.000 10.000 0.000 -0.004 -0.006 0.008 AL 10.000 10.000 0.000 91051700000 06/29/91 AF
-0.7033 10.000 10.006 0.006 0.006 0.006 0.012 l
AL 10.000 10.006 0.006 91060491000 07/22/91 AF
-0.7033 10.000 9.998 -0.002 -0.008 -0.006 -0.008 AL 10.000 9.998 -0.002 91070150000 08/20/91 AF
-0.7033 10.000 10.006 0.006 0.008 0.006 0.006 AL 10.000 10.006 0.006 91072317000 09/19/91 AF
-0.7033 10.000 10.008 0.008 0.002 0.002 0.004 AL 10.000 10.008 0.008 91090258000 10/15/91 AF ERR ERR ERR ERR AL ERR 91102432000 11/14/91 AF
-0.7562 10.752 10.750 -0.002 ERR ERR ERR AL 10.000 10.003 0.003 91111944000 12/13/91 AF
-0.7562 10.000 10.007 0.007 0.004 ERR ERR AL 10.000 10.007 0.007
~.
I WES&L DEPARTMENT ICCN NO/
PREtiN. CCN No.
pace Or CALCULATIONSIEET CCN CONVERSION:
M Calc No, MM -M 7 CCN NO.
CCN-Project or DCP/MMP Sheet No.
58 i
Subject NI Subchannel Gain Callbration As*Found / As left Data l
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV 0
BOCKHORsf 09/07/93 QUINN 09/10/93 IND Unit 2 Channel D Amplifier A-11 MonthlQuarter 150 Da Reg'dCal Dat CD-Req " Drift " Drift " Drift Date Cal Cur.
89011488000 01/24/89 AF no work done AL 89012265000 02/06/89 AF
-0.701 10.000 10.002 0.002 AL 10.000 10.002 0.002 89021612000 03/06/89 AF
-0.701 10.000 10.003 0.003 0.001 AL 10.000 10.003 0.003 89030806000 03/17/89 AF
-0.701 10.000 10.001 0.001 -0.002 AL 10.000 10.001 0.001 89032100000 04/16/89 AF
-0.701 10.000 10.000 0.000 -0.001 -0.002 AL 10.000 10.000 0.000 89042472000 05/15/89 AF
-0.701 10.000 9.998 -0.002 -0.002 -0.005 AL 10.000 9.998 -0.002 89052562000 06/01/89 AF
-0.701 10.000 10.005 0.005 0.007 0.004 0.003 AL 10.000 10.005 0.005 89060482000 06/30/89 AF
-0.701 10.000 9.998 -0.002 -0.007 -0.002 -0.005 AL 10.000 9.998 -0.002 89070479000 07/25/89 AF
-0.701 10.000 9.998 -0.002 0.000 0.000 -0.003 AL 10.000 9.998 -0.002 89072808000 08/22/89 AF
-0.701 10.000 9.998 -0.002 0.000 -0.007 -0.002 AL 10.000 9.998 -0.002 89003628000 09/20/89 AF
-0.701 10.000 9.998 -0.002 0.000 0.000 0.000 AL 10.000 9.998 -0.002 89100673000 10/15/09 AF
-0.701 10.000 9.998 -0.002 0.000 0.000 -0.007 AL 10.000 9.998 -0.002 89102499000 10/21/89 AF
-0.701 10.000 9.998 -0.002 0.000 0.000 0.000 AL 10.000 9.998 -0.002 89103008000 11/20/89 AF
-0.701 10.000 10.000 0.000 0.002 0.002 0.002 AL 10.000 10.000 0.000 89112163000 12/01/89 AF
-0.701 10.000 10.002 0.002 0.002 0.004 0.004 AL 10.000 10.002 0.002 89120732000 12/29/89 AF
-0.701 10.000 9.997 -0.003 -0.005 -0.001 -0.001 AL 10.000 9.997 -0.003 90010740000 01/25/90 AF
-0.701 10.000 9.999 -0.001 0.002 -0.001 0.001 AL 10.000 9.999 -0.001 90020026000 02/23/90 AF
-0.701 10.000 9.995 -0.005 -0.004 -0.007 -0.003 AL 10.000 9.995 -0.005 90030372000 03/10/90 AF
-0.701 10.000 10.002 0.002 0.007 0.005 0.002 AL 10.000 10.002 0.002 90031695000 04/09/90 AF
-0.701 10.000 9.998 -0.002 -0.004 -0.001 -0.004 AL 10.000 9.998 -0.002 90041326000 05/06/90 AF
-0.701 10.000 10.006 0.006 0.008 0.011 0.009 AL 10.000 10.006 0.006 90051333000 06/04/90 AF
-0.701 10.000 10.001 0.001 -0.005 -0.001 0.002 AL 10.000 10.001 0.001 90060748000 07/01/90 AF
-0.701 10.000 9.998 -0.002 -0.003 0.000 0.003 AL 10.000 9.998 -0.002 90070746000 07/28/90 AF
-0.701 10.000 9.998 -0.002 0.000 -0.008 -0.004 AL 10.000 9.998 -0.002 90080598000 08/26/90 AF
-0.701 10.000 9.996 -0.004 -0.002 -0.005 -0.002
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET p,EtiM. eCN NO.
PACE 0,
CCN CONVER5!0N:
Project or DCP/MMP W/A Calc No.
J-UA ni?
CCN NO.
CCN-Subject NI Subchamel Gain Calibration As-Found / As Lef t Data Sheet No.
59 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND AL 10.000 9.996 -0.004 90090925000 09/25/90 AF
-0.701 10.000 9.999 -0.001 0.003 0.001 -0.007 AL 10.000 9.999 -0.001 90100185000 10/24/90 AF
-0.701 10.000 9.996 -0.004 -0.003 -0.002 -0.005 AL 10.000 9.996 -0.004 90110045000 11/20/90 AF
-0.701 10.000 10.001 0.001 0.005 0.005 0.003 AL 10.000 10.001 0.001 90120367000 12/08/90 AF
-0.701 10.000 10.130 0.130 0.129 0.131 0.132 AL 10.000 10.000 0.000 90121034000 01/07/91 AF
-0.701 10.000 9.870 -0.130 -0.130 0.004 0.004 AL 10.000 10.001 0.001 91010971000 02/07/91 AF
-0.701 10.000 9.999 -0.001 -0.002 -0.003 -0.001 AL 10.000 9.999 -0.001 91010971000 03/07/91 AF
-0.701 10.000 9.999 -0.001 0.000 -0.132 0.002 AL 10.000 9.999 -0.001 91021145000 04/04/91 AF
-0.701 10.000 10.002 0.002 0.003 0.001 0.000 AL 10.000 10.002 0.002 91031734000 04/29/91 AF
-0.701 10.000 10.001 0.001 -0.001 0.002 -0.130 AL 10.000 10.001 0.001 91041516000 05/07/91 AF
-0.701 10.000 10.004 0.004 0.003 0.005 0.003 AL 10.000 10.004 0.004 91050496000 05/31/91 AF
-0.701 10.000 10.000 0.000 -0.004 -0.002 0.001 AL 10.000 10.000 0.000 91051700000 06/29/91 AF
-0.701 10.000 10.005 0.005 0.005 0.004 0.006 AL 10.000 10.005 0.005 91060491000 07/22/91 AF
-0.701 10.000 10.004 0.004 -0.001 0.000 0.002 AL 10.000 10.004 0.004 91070150000 08/20/91 AF
-0.701 10.000 10.007 0.007 0.003 0.007 0.006
)
AL 10.000 10.007 0.007 91072317000 09/19/91 AF
-0.701 10.000 10.009 0.009 0.002 0.004 0.005 AL 10.000 10.009 0.009 ERR ERR ERR ERR 91090258000 10/15/91 AF AL ERR 91102432000 11/14/91 AF
-0.7538 10.753 10.752 -0.001 ERR ERR ERR AL 10.000 10.006 0.006 91111944000 12/13/91 AF
-0.7538 10.000 10.010 0.010 0.004 ERR ERR AL 10.000 10.010 0.010 i
l 4
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEE PRELIM. CCN NO.
PAGE OF CCN CONVERSIONt Project or DCP/MMP WA Cate No.
WA-do CCW No. CCN-Subject NI Subebannet Gain Calibration As-Tourd / As Lef t Data Sheet No.
60 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE REV D
BOCKHORST 09/07/93 otJ1NN 09/10/93 IND Unit 2 Channel D Amplifier A-12 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89011488000 01/24/89 AF no work done AL 89012265000 02/06/89 AF
-0.6642 10.000 10.008 0.008 AL 10.000 10.008 0.000 89021612000 03/06/89 AF
-0.6642 10.000 10.009 0.009 0.001 AL 10.000 10.009 0.009 89030806000 03/17/89 AF
-0.6642 10.000 10.003 0.003 -0.006 AL 10.000 10.003 0.003 89032100000 04/16/89 AF
-0.6642 10.000 10.000 0.000 -0.003 -0.008 AL 10.000 10.000 0.000 89042472000 05/15/89 AF
-0.6642 10.000 9.998 -0.002 -0.002 -0.011 AL 10.000 9.998 -0.002 89052562000 06/01/89 AF
-0.6642 10.000 10.003 0.003 0.005 0.000 -0.005 AL 10.000 10.003 0.003 89060482000 06/30/89 AF
-0.6642 10.000 9.999 -0.001 -0.004 -0.001 -0.010 AL 10.000 9.999 -0.001 89070479000 07/25/89 AF
-0.6642 10.000 9.997 -0.003 -0.006 -0.005 -0.010 AL 10.000 9.997 -0.003 89072808000 08/22/89 AF
-0.6642 10.000 9.999 -0.001 0.002 -0.008 -0.005 AL 10.000 9.999 -0.001 89083628000 09/20/89 AF
-0.6642 10.000 9.995 -0.005 -0.004 -0.008 -0.007 AL 10.000 9.995 -0.005 89100673000 10/15/89 AF
-0.6642 10.000 10.002 0.002 0.007 0.005 -0.005 AL 10.000 10.002 0.002 j
89102499000 10/21/89 AF
-0.6642 10.000 9.997 -0.003 -0.005 -0.002 -0.006 AL 10.000 9.997 -0.003 89103008000 11/20/89 AF
-0.6642 10.000 10.001 0.001 0.004 0.006 0.004 AL 10.000 10.001 0.001 89112163000 12/01/89 AF
-0.6642 10.000 10.000 0.000 -0.001 -0.002 0.001 AL 10.000 10.000 0.000 89120732000 12/29/89 AF
-0.6642 10.000 9.997 -0.003 -0.003 0.000 0.002 AL 10.000 9.997 -0.003 90010740000 01/25/90 AF
-0.6642 10.000 9.997 -0.003 0.000 -0.004 -0.005 AL 10.000 9.997 -0.003 90020026000 02/23/90 AP
-0.6642 10.000 9.993 -0.007 -0.004 -0.007 -0.004 AL 10.000 9.993 -0.007 90030372000 03/10/90 AP
-0.6642 10.000 10.002 0.002 0.009 0.005 0.001 AL 10.000 10.002 0.002 90031695000 04/09/90 AF
-0.6642 10.000 9.996 -0.004 -0.006 -0.001 -0.004 AL 10.000 9.996 -0.004 90041326000 05/06/90 AF
-0.6642 10.000 10.001 0.001 0.005 0.008 0.004 AL 10.000 10.001 0.001 90051333000 06/04/90 AF
-0.6642 10.000 9.999 -0.001 -0.002 -0.003 0.002 AL 10.000 9.999 -0.001 90060748000 07/01/90 AF
-0.6642 10.000 9.997 -0.003 -0.002 0.001 0.004 AL 10.000 9.997 -0.003 90070746000 07/28/90 AF
-0.6642 10.000 9.995 -0.005 -0.002 -0.006 -0.007 AL 10.000 9.995 -0.005 90080598000 08/26/90 AF
-0.6642 10.000 9.995 -0.005 0.000 -0.004 -0.001 I
NES&L DEPARTMENT
!CCN N0/
CALCULATIONSIEET pREtin. CCN WO.
PAGE OF CCN CONVERI!ON Project or DCP/MMP M/A Calc No.
3-W A-017 CCN NO.
CCN-Subject NI Subchannel Gain Calibration As-Found / As-Left Data Sheet No.
61 REV ORIGlNATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REv IND AL 10.000 9.995 -0.005 90090925000 09/25/90 AF
-0.6642 10.000 9.998 -0.002 0.003 0.001 -0.003 AL 10.000 9.998 -0.002 90100185000 10/24/90 AF
-0.6642 10.000 9.995 -0.005 -0.003 0.000 -0.004 AL 10.000 9.995 -0.005
(
90110045000 11/20/90 AF
-0.6642 10.000 9.998 -0.002 0.003 0.003 0.001 l
AL 10.000 9.998 -0.002 90120367000 12/08/90 AF
-0.6642 10.000 9.990 -0.010 -0.008 -0.008 -0.005 AL 10.000 9.990 -0.010 90121034000 01/07/91 AF
-0.6642 10.000 9.995 -0.005 0.005 0.000 0.000 AL 10.000 9.995 -0.005 91010971000 02/07/91 AF
-0.6642 10.000 9.993 -0.007 -0.002 -0.005 -0.005 AL 10.000 9.993 -0.007 I
91010971000 03/07/91 AF
-0.6642 10.000 9.994 -0.006 0.001 0.004 -0.001 AL 10.000 9.994 -0.006 l
91021145000 04/04/91 AF
-0.6642 10.000 10.006 0.006 0.012 0.011 0.008
(
AL 10.000 10.006 0.006 91031734000 04/29/91 AF
-0.6642 10.000 9.995 -0.005 -0.011 0.002 0.005 AL 10.000 9.995 -0.005 91041516000 05/07/91 AF
-0.6642 10.000 9.999 -0.001 0.004 0.005 0.004 AL 10.000 9.999 -0.001 91050496000 05/31/91 AF
-0.6642 10.000 9.995 -0.005 -0.004 -0.011 0.002 AL 10.000 9.995 -0.005 91051700000 06/29/91 AF
-0.6642 10.000 9.999 -0.001 0.004 0.004 0.005 AL 10.000 9.999 -0.001 91060491000 07/22/91 AF
-0.6642 10.000 9.996 -0.004 -0.003 -0.003 -0.010 AL 10.000 9.996 -0.004 91070150000 08/20/91 AF
-0.6642 10.000 10.001 0.001 0.005 0.006 0.006 AL 10.000 10.001 0.001 91072317000 09/19/91 AF
-0.6642 10.000 10.005 0.005 0.004 0.006 0.006 AL 10.000 10.005 0.005 91090258000 10/15/91 AF ERR ERR ERR ERR AL ERR 91102432000 11/14/91 AP
-0.7142 10.753 10.747 -0.006 ERR ERR ERR AL 10.000 10.002 0.002 91111944000 12/13/91 AF
-0.7142 10.000 9.999 -0.001 -0.003 ERR ERR AL 10.000 9.999 -0.001 i
i I
l l
j
1 NESQL DEPARTMENT
!CCN N0l -
,REum. ces ao.
,Act er CALCULATIONSHEET CCW CONVERSION:
ala
. Dde to.
2 r -n12 CCW No. CCN-Project or DCP/MMP Subject N1 subchannet Gain calibration ns.Found / As teft Data Sheet No.
62 REV ORIGINATOR DATE ltE DATE REV ORIEltATOR DATE
!RE DATE REV O
80CKHORST 09/07/93 GUleN ' 09/10/95 IND Unit 3 Channel A Amplifier A-10 MonthlQuarter 150 Da M.O.
Date Cal Cur.
Reg'dCal Dat CD-Req " Drift " Drift " Drift 89010181000 01/08/89 AF
-0.7433 10.000 10.007 0.007 AL 10.000 10.007 0.007 89011218000 01/19/89 AF
-0.7433 10.000 10.008 0.00B 0.001 AL 10.000 10.008 0.008 89012749000 02/16/89 AF
-0.7433 10.000 10.006 0.006 -0.002 AL 10.000 10.006 0.006 89030716000 03/21/89 AF
-0.7433 10.000 10.008 0.008 0.002 0.001 AL 10.000 10.008 0.008 89033627000 04/07/89 AF
-0.7433 10.000 10.008 0.008 0.000 0.000 AL 10.000 10.008 0.008 89040973000 04/14/89 AF
-0.7433 10.000 10.010 0.010 0.002 0.004 0.003 AL 10.000 10.010 0.010
' D.7433<10.000 10.011 0.011 0.001 0.003 0.003 89042183000 05/08/89 AF AL 10.000 10.011 0.011 89051406000 06/04/89 AF
-0.7433 10.000 10.010 0.010 -0.001 0.002 0.004 JUL 20.000 10.010 0.010 89061044000 07/Q2/89 AF 4D.7433 10.000 10.009 0.009 -0.002 -0.002 0.000 AL 10.000 10.009 0.009 89070451000 07/07/89 AF
-0.7433 10.000 10.015 0.015 0.006 0.003 0.006 AL 10.000 10.015 0.015 89071079000 08/02/89 AF
-0.7433 10.000 10.010 0.010 -0.005 -0.001 -0.001 AL 10.000 10.010 0.010 89080846000 08/30/89 AF
-0.7433 10.000 10.009 0.009 -0.001 0.000 -0.003 AL 10.000 10.009 0.009 89090940000 09/28/89 AF
-0.7433 10.000 10.000 0.000 -0.009 -0.015 -0.011 AL 10.000 10.000 0.000 89100679000 10/20/89 AF
-0.7433 10.000 10.001 0.001 0.001 -0.009 -0.008 AL 10.000 10.001 0.001 89103070000 11/19/89 AF ( -0.7433 10.000 10.009 0.009 0.006 0.000 -0.006 AL 10.000 10.009 0.009 89112056000 12/19/89 3GP
-0.7433 10.000 9.999 -0.002 -0.011 -0.002 -0.012 AL 10.000 9.998 -0.002 89122703000 01/07/90 AF
-0.7433 10.000 10.001 0.001 0.003 0.000 -0.008 AL 10.000 10.001 0.001 90012589000 02/13/90 AF
-0.7433 10.000 9.997 -0.003 -0.004 -0.012 -0.003 AL 10.000 9.997 -0.003 90021410000 02/25/90 AF
-0 7433 10.000 10.003 0.003 0.006 0.005 0.002 AL 10.000 10.003 0.003 90022604000 03/26/90 AF
-0.7433 10.000 10.001 0.001 -0.002 0.000 -0.008 AL 10.000'10.001 0.001 90040448000 04/23/90 AF
-0.7433 10.000 10.009 0.009 0.008 0.012 0.011 AL 10.000 10.009 0.009 90041977000 04/26/90 AF
-0.7433 10.000 10.007 0.007 -0.002 0.004 0.006 AL 10.000 10.007 0.007 90042315000 05/02/90 AF
-0.7433 10.000 10.009 0.009 0.002 0.008 0.012 AL 10.000 10.009 0.009 90050289000 05/10/90 AF
-0.7433 10.000 10.010 0.010 0.001 0.001 0.007 AL 10.000 10.010 0.010 90051437000 05/17/90 AF
-0.7433 10.000 10.004 0.008 -0.002 0.001 0.007
NES&L DEPARTMENT ICCW N0/
pReuN. CCW No.
eAce or CALCULATIONSHEET CCN CONVERSION:
Project or DCP/MMP W/A Cate No. _. f "A 0U CCN NO.
CCN-Subject NI Subchannel GeIn Calibration As*Found / As l. eft Data
$heet No.
63 REV ORIG!kATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE REV 0
80CKHOR$T 09/07/93 QUINN 09/10/93 IND AL 10.000 10.008 0.008 90051992000 06/20/90 AF
-0.7433 10.000 10.079 0.079 0.071 0.070 0.070 AL 10.000 10.007 0.007 90062593000 07/09/90 AF
-0.7433 10.000 9.982 -0.018 -0.025 0.044 0.047 E
10.000 9.982 -0.018 90071140000 07/16/90 AF
-0.7433 10.000 10.030 0.030 0.048 0.094 0.093 AL 10.000 10.001 0.001 90071979000 08/06/90 AF
-0.7433 10.000 9.949 -0.051 -0.052 -0.029 0.040 AL 10.000 10.000 0.000 90081592000 08/30/90 AF
-0.7433 10.000 10.003 0.003 0.003 -0.001 0.045 AL 10.000 10.003 0.003 90090928000 09/26/90 AF
-0.7433 10.000 10.032 0.032 0.029 -0.020 0.003 AL 10.000 10.032 0.032 90100124000 10/25/90 AF
-0.7433 10.000 10.009 0.009 -0.023 0.009 0.005 AL 10.000 10.009 0.009 90110066000 11/28/90 AF
-0.7433 10.000 10.003 0.003 -0.006 0.000 -0.049 AL 10.000 10.003 0.003 90120005000 12/21/90 AF
-0.7433 10.000 9.989 -0.011 -0.014 -0.043 -0.011 AL 10.000 9.989 -0.011 90122068000 01/22/91 AF
-0.7433 10.000 9.982 -0.018 -0.007 -0.027 -0.021 AL 10.000 9.982 -0.018 91012919000 02/21/91 AF
-0.7433 10.000 9.981 -0.019 -0.001 -0.022 -0.051 AL 10.000 9.981 -0.019 91030400000 03/22/91 AF
-0.7433 10.000 9.980 -0.020 -0.001 -0.009 -0.029 AL 10.000 9.980 -0.020 91040068000 04/09/91 AF
-0.7433 10.000 9.994 -0.006 0.014 0.012 -0.009 AL 10.000 9.994 -0.006 91041995000 05/06/91 AF
-0.7453 10.027 10.136 0.109 0.115 0.128 0.120 AL 10.000 9.999 -0.001 91051332000 05/20/91 AF
-0.7433 9.973 9.975 0.002 0.003 0.132 0.130 AL 10.000 9.975 -0.025 91052209000 05/31/91 AF
-0.7433 10.000 9.852 -0.148 -0.123 -0.005 0.008 AL 10.000 10.001 0.001 91060730000 06/24/91 AF
-0.7433 10.000 10.021 0.021 0.020 -0.100 0.029 AL 10.000 10.021 0.021 91070681000 07/22/91 AF
-0.7433 10.000 10.010 0.010 -0.011 -0.114 0.004 AL 10.000 10.010 0.010 91080171000 08/08/91 AF
-0.7433 10.000 10.012 0.012 0.002 0.011 -0.109 AL 10.000 10.012 0.012 91081130000 09/06/91 AF
-0.7433 10.000 10.017 0.017 0.005 -0.004 -0.107 AL 10.000 10.017 0.017 l
91091377000 10/04/91 AF
-0.7433 10.000 10.040 0.040 0.023 0.030 0.039 AL 10.000 10.040 0.040 91100941000 11/04/91 AF
-0.7433 10.000 9.999 -0.001 -0.041 -0.013 -0.022 AL 10.000 9.999 -0.001 91111516000 11/26/91 AF
-0.7433 10.000 10.012 0.012 0.013 -0.005 0.002 AL 10.000 10.012 0.012 91120403000 12/26/91 AF
-0.7433 10.000 10.011 0.011 -0.001 -0.029 -0.001 AL 10.000 10.007 0.007 l
NES&L DEPARTMENT ICCN NO/
CALCULATIONSIEET PRELIM. CCN NO.
PAGE OF CCN CONVERSION:
Project or D::P/MMP W/A Calc No.
_f sFA 017 CCN NO.
CCN-Subject NI Subchannet Gain Calibration As Found / As Left Data Sheet No.
64 REV ORIGINATOR DATE
!RE DATE REV ORIGINATOR DATE IRE DATE 0
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 3 Channel A Amplifier A-11 MonthlQuarter 150 Da 1
Date Cal Cur.
Reg'dCal Dat CD-Req " Drift " Drift " Drift 09010181000 01/08/89 AF
-0.6846 10.000 10.000 0.000
)
AL 10.000 10.000 0.000 89011218000 01/19/89 AF
-0.6846 10.000 10.002 0.002 0.002 AL 10.000 10.002 0.002 89012749000 02/16/89 AF
-0.6846 10.000 9.999 -0.001 -0.003 AL 10.000 9.999 -0.001 89030716000 03/21/89 AF
-0.6846 10.000 10.017 0.017 0.018 0.017 AL 10.000 10.017 0.017 89033627000 04/07/89 AF
-0.6846 10.000 10.020 0.020 0.003 0.018 AL 10.000 10.020 0.020 i
89040973000 04/14/89 AF
-0.6846 10.000 10.024 0.024 0.004 0.025 0.024 AL 10.000 10.024 0.024 89042183000 05/08/89 AF
-0.6846 10.000 10.095 0.095 0.071 0.078 0.093 AL 10.000 10.002 0.002 89051406000 06/04/89 AF
-0.6846 10.000 9.931 -0.069 -0.071 0.004 0.025
)
AL 10.000 10.005 0.005 69061044000 07/02/89 AF
-0.6846 10.000 10.045 0.045 0.040 0.040 0.047 AL 10.000 10.002 0.002 I
89070451000 07/07/89 AF
-0.6846 10.000 10.021 0.021 0.019 -0.012 0.063 AL 10.000 10.021 0.021 1
89071079000 08/02/89 AF
-0.6846 10.000 9.974 -0.026 -0.017 0.012 0.012 AL 10.000 9.974 -0.026 89080846000 08/30/89 AF
-0.6846 10.000 9.981 -0.019 0.007 -0.021 -0.052 AL 10.000 9.998 -0.002 89090940000 09/28/89 AF
-0.6846 10.000 9.990 -0.010 -0.008 -0.048 0.011 AL 10.000 9.990 -0.010 89100679000 10/20/89 AF
-0.6846 10.000 10.002 0.002 0.012 0.011 -0.017 AL 10.000 10.002 0.002 89103070000 11/19/89 AF
-0.6846 10.000 10.003 0.003 0.001 0.005 -0.035 AL 10.000 10.003 0.003
)
89112056000 12/19/89 AF
-0.6846 10.000 10.025 0.025 0.022 0.035 0.034 AL 10.000 10.025 0.025 89122703000 01/07/90 AF
-0.6846 10.000 9.992 -0.008 -0.033 -0.010 -0.006 AL 10.000 9.992 -0.000 90012589000 02/13/90 AF
-0.6846 10.000 10.047 0.047 0.055 0.044 0.057 AL 10.000 9.998 -0.002 90021410000 02/25/90 AF
-0.6846 10.000 10.046 0.046 0.048 0.070 0.093 AL 10.000 10.005 0.005 90022604000 03/26/90 AP
-0.6846 10.000 9.955 -0.045 -0.050 0.053 0.042 AL 10.000 10.002 0.002 90040448000 04/23/90 AF
-0.6846 10.000 9.984 -0.016 -0.018 -0.020 0.002 AL 10.000 9.984 -0.016 90041977000 04/26/90 AF
-0.6846 10.000 9.966 -0.034 -0.018 -0.086 0.017 AL 10.000 9.966 -0.034 90042315000 05/02/90 AF
-0.6846 10.000 9.992 -0.000 0.026 -0.010 -0.012 AL 10.000 9.992 -0.000 90050289000 05/10/90 AF
-0.6846 10.000 10.011 0.011 0.019 0.027 -0.041 AL 10.000 10.011 0.011 90051437000 05/17/90 AF
-0.6846 10.000 9.996 -0.004 -0.015 0.030 -0.006
NESE3L DEPARTMENT ICCN N0/
CALCULATIONSHEET PnEtiN. CCN No.
pace Or CCN CONVER$10N:
Project or DCP/PMP v/a Calc No.
CCN No. CCN-Subject NI Subchannel Gain Calibratlon As*Found / As Left Data Sheet No.
65 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REV INO AL 10.000 9.996 -0.004 90051992000 06/20/90 AF
-0.6846 10.000 10.005 0.005 0.009 0.013 0.021 AL 10.000 9.999 -0.001 90062593000 07/09/90 AF
-0.6846 10.000 9.977 -0.023 -0.022 -0.028 0.017 AL 10.000 9.977 -0.023 90071140000 07/16/90 AF
-0.6846 10.000 9.928 -0.072 -0.049 -0.062 -0.058 AL 10.000 9.996 -0.004 90071979000 08/06/90 AF
-0.6846 10.000 9.998 -0.002 0.002 -0.069 -0.075 AL 10.000 9.998 -0.002 90081592000 08/30/90 AF
-0.6846 10.000 9.999 -0.001 0.001 -0.046 -0.059 AL 10.000 9.999 -0.001 90090928000 09/26/90 AF
-0.6846 10.000 9.988 -0.012 -0.011 -0.008 -0.079 AL 10.000 9.988 -0.012 90100124000 10/25/90 AF
-0.6846 10.000 10.063 0.063 0.075 0.065 0.018 AL 10.000 10.006 0.006 90110066000 11/28/90 AF
-0.6846 10.000 10.058 0.058 0.052 0.116 0.119 AL 10.000 10.004 0.004 90120005000 12/21/90 AF
-0.6846 10.000 9.880 -0.120 -0.124 0.003 -0.007 AL 10.000 9.995 -0.005 90122068000 01/22/91 AF
-0.6846 10.000 9.984 -0.016 -0.011 -0.083 -0.019 AL 10.000 9.984 -0.016 91012919000 02/21/91 AF
-0.6846 10.000 9.980 -0.020 -0.004 -0.139 -0.012 AL 10.000 9.980 -0.020 91030400000 03/22/91 AF
-0.6846 10.000 9.983 -0.017 0.003 -0.012 -0.084 AL 10.000 9.983 -0.017 91040068000 04/09/91 AF
-0.6846 10.000 9.982 -0.018 -0.001 -0.002 -0.137 AL 10.000 9.982 -0.018 91041995000 05/06/91 AP
-0.6846 10.000 9.984 -0.016 0.002 0.004 -0.011 AL 10.000 9.984 -0.016 91051332000 05/20/91 AF
-0.6846 10.000 9.983 -0.017 -0.001 0.000 -0.001 AL 10.000 9.983 -0.017 91052209000 05/31/91 AF
-0.6846 10.000 9.984 -0.016 0.001 0.002 0.004 j
AL 10.000 9.984 -0.016 91060730000 06/24/91 AP
-0.6846 10.000 9.999 -0.001 0.015 0.015 0.016 AL 10.000 9.999 -0.001 91070681000 07/22/91 AF
-0.6846 10.000 9.984 -0.016 -0.015 0.001 0.002 j
AL 10.000 9.984 -0.016 4
91080171000 08/08/91 AP
-0.6846 10.000 9.985 -0.015 0.001 0.001 0.001 AL 10.000 9.985 -0.015 91081130000 09/0'6/91 AP
-0.6846 10.000 9.983 -0.017 -0.002 -0.016 0.000 AL 10.000 9.983 -0.017 91091377000 10/04/91 AF
-0.6846 10.000 9.990 -0.010 0.007 0.006 0.006 AL 10.000 9.990 -0.010 91100941000 11/04/91 AF
-0.,6846 10.000 9.979 -0.021 -0.011 -0.006 -0.020 AL 10.000 9.979 -0.021 91111516000 11/26/91 AF
-0.6846 10.000 9.983 30.017 0.004 0.000 -0.001 AL 10.000 9.983 -0.017 12/26/91 AF
-0.6846 10.000 10.072 0.072 0.089 0.082 0.087 AL 10.000 10.000 0.000 1
NES&L DEPARTMENT
!CCN N0/
PREUM. CCN NO.
PAGE OF CALCULATIONSHEET CCN CONVERSION:
P?oject or DCP/MMP W/A Calc No. _ J-U A-dU CCN NO.
CCN-Subject NT subchannet Gain Calibration As-Found / As Left Data Sheet No.
66 REV ORIGINATOR DATF IRE DATE REV ORIGINATOR DATE IRE DATE l
REV 0
BOCKHORST 09/07/93 QUINN 09/10/93 IND Unit 3 Channel A Amplifier A-12 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift i
89010181000 01/08/89 AF
-0.7165 10.000 10.002 0.002 l
1 AL 10.000 10.002 0.002 89011218000 01/19/89 AF
-0.7165 10.000 10.004 0.004 0.002 AL -
10.000 10.004 0.004 89012749000 02/16/89 AF
-0.7165 10.000 10.002 0.002 -0.002 AL 10.000 10.002 0.002 89030716000 03/21/89 AF
-0.7165 10.000 10.003 0.003 0.001 0.001 E
10.000 10.003 0.003 89033627000 04/07/89 AF
-0.7165 10.000 9.999 -0.001 -0.004 -0.005 AL 10.000 9.999 -0.001 89040973000 04/14/89 AF
-0.7165 10.000 9.976 -0.024 -0.023 -0.026 -0.026 AL 10.000 9.976 -0.024 89042183000 05/08/89 AF
-0.7165 10.000 10.003 0.003 0.027 0.000 -0.001 AL 10.000 10.003 0.003 89051406000 06/04/89 AF
-0.7165 10.000 10.002 0.002 -0.001 0.003 0.000 AL 10.000 10.002 0.002 89061044000 07/02/89 AF
-0.7165 10.000 10.000 0.000 -0.003 0.023 -0.004 AL 10.000 10.000 0.000 89070451000 07/07/89 AF
-0.7165 10.000 10.003 0.003 0.003 -0.001 0.003 AL 10.000 10.003 0.003 89071079000 08/02/89 AF
-0.7165 10.000 10.001 0.001 -0.002 -0.002 0.024 AL 10.000 10.001 0.001 89080846000 08/30/89 AF
-0.7165 10.000 10.001 0.001 0.000 0.001 -0.003
)
AL 10.000 10.001 0.001 1
89090940000 09/28/89 AF
-0.7165 10.000 9.990 -0.010 -0.011 -0.013 -0.013 AL 10.000 9.990 -0.010 89100679000 10/20/89 AF
-0.7165 10.000 10.005 0.005 0.015 0.004 0.005
)
AL 10.000 10.005 0.005 89103070000 11/19/89 AF
-0.7165 10.000 9.999 -0.001 -0.006 -0.002 -0.004 AL 10.000 9.999 -0.001 89112056000 12/19/89 AF
-0.7165 10.000 10.004 0.004 0.005 0.014 0.003 i
AL 10.000 10.004 0.004
{
89122703000 01/07/90 AF
-0.7165 10.000 10.002 0.002 -0.002 -0.003 0.001 AL 10.000 10.002 0.002 90012589000 02/13/90 AF
-0.7165 10.000 10.001 0.001 -0.001 0.002 0.011 AL 10.000 10.001 0.001 90021410000 02/25/90 AF
-0.7165 10.000 10.002 0.002 0.001 -0.002 -0.003 AL 10.000 10.002 06002 90022604000 03/26/90 AF
-0.7165 10.000 10.001 0.001 -0.001 -0.001 0.002 AL 10.000 10.001 0.001 L
90040448000 04/23/90 AF
-0.7165 10.000 10.006 0.006 0.005 0.005 0.002 AL 10.000 10.006 0.006
.7165 10.000 10.003 0.003 -0.003 0.001 0.001 90041977000 04/26/90 AF s
AL 10.000 10.003 0.003 90042315000 05/02/90 AF
-0.7165 10.000 10.005 0.005 0.002 0.004 0.004 AL 10.000 10.005 0.005 f
90050289000 05/10/90 AF
-0.7165 10.000 10.020 0.020 0.015 0.014 0.018 AL 10.000 10.020 0.020 i
90051437000 05/17/90 AF
-0.7165 10.000 10.004 0.004 -0.016 0.001 0.003
l NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET eREun. ecN NO.
pace or CCN CONVERSION:
Project or DCP/MMP M /a Cate No.
b asa-M 7 CCN NO.
CCN-Sub]ect N1 $ 4channet Gain Calibration As Fomcl / Asdeft Data Sheet No.
67 1
1 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE CATE 0
BOCKHORsi 09/07/93 QUlWN 09/10/93 REV IND j
AL 10.000 10.004 0.004 90051992000 06/20/90 AF
-0.7165 10.000 10.002 0.002 -0.002 -0.003 -0.004 AL 10.000 10.002 0.002 90062593000 07/09/90 AF
-0.7165 10.000 10.008 0.008 0.006 -0.012 0.005 l
AL 10.000 10.000 0.008 90071140000 07/16/90 AF
-0.7165 10.000 10.000 0.000 -0.008 -0.004 -0.005 AL 10.000 10.000 0.000 90071979000 08/06/90 AF
-0.7165 10.000 10.004 0.004 0.004 0.002 -0.016 AL 10.000 10.004 0.004 90081592000 08/30/90 AF
-0.7165 10.000 10.005 0.005 0.001 -0.003 0.001 AL 10.000 10.005 0.005 90090928000 09/26/90 AF
-0.7165 10.000 10.006 0.006 0.001 0.006 0.004 AL 10.000 10.006 0.006 90100124000 10/25/90 AF
-0.7165 10.000 10.002 0.002 -0.004 -0.002 -0.006 AL 10.000 10.002 0.002 90110066000 11/28/90 AF
-0.7165 10.000 10.017 0.017 0.015 0.012 0.017 l
AL 10.000 10.017 0.017 90120005000 12/21/90 AF
-0.7165 10.000 10.004 0.004 -0.013 -0.002 0.000 AL 10.000 10.004 0.004 90122068000 01/22/91 AF
-0.7165 10.000 10.005 0.005 0.001 0.003 0.000 AL 10.000 10.005 0.005 91012919000 02/21/91 AF
-0.7165 10.000 10.003 0.003 -0.002 -0.014 -0.003 AL 10.000 10.003 0.003 91030400000 03/22/91 AF
-0.7165 10.000 10.008 0.008 0.005 0.004 0.006 AL 10.000 10.008 0.008 91040068000 04/09/91 AF
-0.7165 10.000 10.005 0.005 -0.003 0.000 -0.012 AL 10.000 10.005 0.005 91041995000 05/06/91 AF
-0.7165 10.000 10.008 0.008 0.003 0.005 0.004 AL 10.000 10.000 0.008 91051332000 05/20/91 AF 0.7165 10.000 10.007 0.007 -0.001 -0.001 0.002 AL 10.000 10.007 0.007 91052209000 05/31/91 AF
-0.7165 10.000 10.007 0.007 0.000 0.002 0.004 AL 10.000 10.007 0.007 91060730000 06/24/91 AF
-0.7165 10.000 10.021 0.021 0.014 0.013 0.013 AL 10.000 10.021 0.021 91070681000 07/22/91 AF
-0.7165 10.000 10.007 0.007 -0.014 0.000 0.002 AL 10.000 10.007 0.007 91080171000 08/08/91 AF
-0.7165 10.000 10.000 0.008 0.001 0.001 0.000 AL 10.000 10.008 0.008 91081130000 09/06/91 AF
-0.7165 10.000 10.007 0.007 -0.001 -0.014 0.000 AL 10.000 10.007 0.007 91091377000 10/04/91 AP
-0.7165 10.000 10.010 0.010 0.003 0.003 0.003 AL 10.000 10.010 0.010 91100941000 11/04/91 AF
-0.7165 10.000 10.000 0.000 -0.010 -0.008 -0.021 AL 10.000 10.000 0.000 91111516000~11/26/91 AF
-0.7165 10.000 10.006 0.006 0.006 -0.001 -0.001 AL 10.000 10.006 0.006 12/26/91 AF
-0.7165 10.000 10.003 0.003 -0.003 -0.007 -0.005 AL 10.000 10.003 0.003
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET nEuM. CCN No.
nGE cr CCN CONVERSION:
Project or DCP/MMp M/A Calc No.
W A-ni?
CCN No. CCN-
$@ ject NI Sutxhannel Gain Calibration As-Found / As-teft Data Sheet No.
68 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE 0
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 3 Channel B Amplifier A-10 MonthlQuarter 150 Da M.O.
Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89011219000 01/27/89 AP
-0.7048 10.000 10.000 0.000 AL 10.000 10.000 0.000 89021059000 02/24/89 AF
-0.7048 10.000 10.012 0.012 0.012 AL 10.000 10.012 0.012 89030718000 03/24/89 AF
-0.7048 10.000 10.005 0.005 -0.007 AL 10.000 10.005 0.005 89033628000 04/07/89 AF
-0.7048 10.000 10.010 0.010 0.005 0.010 AL 10.000 10.010 0.010 89040974000 04/14/89 AF
-0.7048 10.000 10.010 0.010 0.000 -0.002 AL 10.000 10.010 0.010 89042181000 05/14/89 AF
-0.7048 10.000 10.008 0.008 -0.002 0.003 0.008 AL 10.000 10.000 0.008 89052590000 06/12/89 AF
-0.7048 10.000 10.007 0.007 -0.001 -0.003 -0.005 AL 10.000 10.007 0.007 89061700000 07/03/89 AF
-0.7048 10.000 10.006 0.006 -0.001 -0.004 0.001 AL 10.000 10.006 0.006 89070481000 07/07/89 AF
-0.7048 10.000 10.008 0.008 0.001 -0.001 -0.003 AL 10.000 10.008 0.008 89071803000 08/07/89 AF
-0.7048 10.000 10.000 0.000 -0.008 -0.008 -0.011 AL 10.000 10.000 0.000 89081208000 09/01/89 AF
-0.7048 10.000 10.004 0.004 0.004 -0.003 -0.005 AL 10.000 10.004 0.004 89090941000 09/29/89 AF
-0.7048 10.000 10.010 0.010 0.006 0.002 0.002 AL 10.000 10.010 0.010 89100681000 10/26/89 AF
-0.7048 10.000 10.005 0.005 -0.005 0.005 -0.002 AL 10.000 10.005 0.005 89110198000 11/21/89 AF
-0.7048 10.000 10.011 0.011 0.006 0.007 0.003 AL 10.000 10.011 0.011 89112228000 12/20/89 AF
-0.7048 10.000 10.008 0.008 -0.003 -0.002 0.008 AL 10.000 10.000 0.008 89122707000 01/19/90 AF
-0.7048 10.000 10.010 0.010 0.002 0.005 0.006 AL 10.000 10.010 0.010 90012992000 02/13/90 AF
-0.7048 10.000 10.006 0.006 -0.004 -0.005 -0.004 AL 10.000 10.006 0.006 90021411000 02/25/90 AF
-0.7048 10.000 10.006 0.006 0.000 -0.002 0.001 AL 10.000 10.006 0.006 90022606000 03/26/90 AF
-0.7048 10.000 10.007 0.007 0.001 -0.003 -0.004 AL 10.000 10.007 0.007 90040449000 04/23/90 AF
-0.7048 10.000 10.010 0.010 0.003 0.004 0.002 AL 10.000 10.010 0.010 90042042000 04/26/90 AF
-0.7048 10.000 10.009 0.009 -0.001 0.003 -0.001 AL 10.000 10.009 0.009 90042316000 05/02/90 AF
-0.7048 10.000 10.008 0.008 -0.001 0.001 0.002 I
AL 10.000 10.000 0.008
{
90050355000 05/10/90 AF
-0.7048 10.000 10.009 0.009 0.001 -0.001 0.003
]
AL 10.000 10.009 0.009 90051540000 06/14/90 AF
-0.7048 10.000 10.010 0.010 0.001 0.001 0.003 AL 10.000 10.010 0.010 90062419000 07/09/90 AF
-0.7048 10.000 10.010 0.010 0.000 0.002 0.000
NES&L DEPARTMENT lt%N N0/
CALCULATIONSHEET mun. CCN No.
Pace or CCN CONVERSION:
Project or DCP/IO4P M /a Cels es.
J.tra.n17 CCN No. CCN-Subject N1 Subehannel Gain Calibration As-h u d / AS4ef t Data Sheet No.
69 REV ORIGINATOR DATE ME DATE EV ORIGINATOR DATE IRE DATE 0
80CKHORST 09/07/95 QUIWW 09/10/93 REV IND AL 10.000 10.010 0.010 90071141000 07/16/90 AF
-0.7048 10.000 10.005 0.005 -0.005 -0.004'-0.004 AL 10.000 10.005 0.005 90072325000 08/07/90 AP
-0.7048 10.000 10.006 0.006 0.001 -0.004 -0.002 AL 10.000 10.006 0.006 90081593000 08/30/90 AF
-0.7048 10.000 10.009 0.009 0.003 -0.001 0.000 AL 10.000 10.009 0.009 90090929000 09/27/90 AF
-0.7048 10.000 10.011 0.011 0.002 0.006 0.001 AL 10.000 10.011 0.011 90100160000 10/25/90 AF
-0.7048 10.000 10.006 0.006 -0.005 0.000 -0.004 AL 10.000 10.006 0.006 90110047000 11/30/90 AF
-0.7048 10.000 10.010 0.010 0.004 0.001 0.005 AL 10.000 10.010 0.010 90120349000 12/21/90 AF
-0.7048 10.000 10.005 0.005 -0.005 -0.006 -0.001 AL 10.000 10.005 0.005 90122071000 01/21/91 AF
-0.7048 10.000 10.006 0.006 0.001 0.000 -0.003 AL 10.000 10.006 0.006 91012915000 02/20/91 AF
-0.7048 10.000 10.004 0.004 -0.002 -0:006 -0.007 AL 10.000 10.004 0.004 91030405000 03/22/91 AF
-0.7048 10.000 10.006 0.006 0.002 0.001 0.000 J1 10.000 10.006 0.006 91040069000 04/09/91 AF
-0.7048 10.000 10.006 0.006 0.000 0.000 -0.004 AL 10.000 10.006 0.006 91041901000 05/07/91 AF
-0.7040 10.000 10.008 0.008 0.002 0.004 0.003 AL 10.000 10.008 0.008 91051452000 05/20/91 AF
-0.7048 10.000 10.010 0.010 0.002 0.004 0.004 AL 10.000 10.010 0.010 91052582000 05/31/91 AF
-0.7048 10.000 10.012 0.012 0.002 0.006 0.008 AL 10.000 10.012 0.012 91060732000 06/21/91 AF
-0.7048 10.000 10.018 0.018 0.006 0.010 0.012 AL 10.000 10.018 0.018 91070551000 07/20/91 AF
-0.7048 10.000 10.009 0.009 -0.009 -0.001 0.003 AL 10.000 10.009 0.009 91080168000 08/08/91 AF
-0.7048 10.000 10.008 0.000 -0.001 -0.004 0.000 AL 10.000 10.008 0.000 91081134000 09/06/91 AF
-0.7048 10.000 10.009 0.009 0.001 -0.009 -0.001 KL 10.000 10.009 0.009 91091378000 10/04/91 AP
-DJ7048 10.000 10.010 0.010 0.001 0.001 -0.002 l
AL 20.000 10.010 0.010 j
91101273000 10/29/91 AF
-0.7048 10.000 10.007 0.007 -0.003 -0.001 -0.011 AL 10.000 10.007 0.007 91110829000 11/26/91 AF
-0.7048 10.000 10.007 0.007 0.000 -0.002 -0.002 AL 10.000 10.007 0.007 91120814000 12/26/91 AF
-0.7048 10.000 10.003 0.003 -0.004 -0.007 -0.005 AL 10.000 10.003 0.003
-. l
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET
,RE u m. CCN No.
pace or CCN CONVERSION:
Project or DCP/MP WA Calc No.
.l.tFA-01?
CCN NO.
CCN-Subject N1 Sthchannel Gain Calibration As.Found / As.left Data Sheet No.
70 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE 1RE DATE 0
BOCKHORST 09/07/93 QUINN 09/10/93 REV INC Unit 3 Channel B Amplifier A-11 MonthlQuarter 150 Da Date Cal Cur.
Reg'dCal Dat CD-Req " Drift " Drift " Drift 89011219000 01/27/89 AF
-0.7221 10.000 10.009 0.009 AL 10.000 10.009 0.009 89021059000 02/24/89 AF
-0.7221 10.000 10.017 0.017 0.008 AL 10.000 10.017 0.017 89030718000 03/24/89 AF
-0.7221 10.000 10.012 0.012 -0.005 AL 10.000 10.012 0.012 89033628000 04/07/89 AF
-0.7221 10.000 10.010 0.010 -0.002 0.001 AL 10.000 10.010 0.010 89040974000 04/14/89 AF
-0.7221 10.000 10.010 0.010 0.000 -0.007 AL 10.000 10.010 0.010 89042181000 05/14/89 AF
-0.7221 10.000 10.014 0.014 0.004 0.002 0.005 AL 10.000 10.014 0.014 89052590000 06/12/89 AF
-0.7221 10.000 10.014 0.014 0.000 0.004 -0.003 AL 10.000 10.014 0.014 89061700000 07/03/89 AF
-0.7221 10.000 10.016 0.016 0.002 0.006 0.004 AL 10.000 10.016 0.016 89070481000 07/07/09 AF
-0.7221 10.000 10.014 0.014 -0.002 0.000 0.004 AL 10.000 10.014 0.014 89071803000 08/07/89 AF
-0.7221 10.000 10.010 0.010 -0.004 -0.004 0.000 AL 10.000 10.010 0.010 89081208000 09/01/89 AF
-0.7221 10.000 10.010 0.010 0.000 -0.006 -0.004 AL 10.000 10.010 0.010 89090941000 09/29/89 AF
-0.7221 10.000 10.010 0.010 0.000 -0.004 -0.004 AL 10.000 10.010 0.010 89100681000 10/26/89 AP
-0.7221 10.000 10.013 0.013 0.003 0.003 -0.003 AL 10.000 10.013 0.013 89110198000 11/21/89 AP
-0.7221 10.000 10.019 0.019 0.006 0.009 0.005 l
AL 10.000 10.019 0.019 89112228000 12/20/89 AP
-0.7221 10.000 10.015 0.015 -0.004 0.005 0.005 AL 10.000 10.015 0.015 89122707000 01/19/90 AF
-0.7221 10.000 10.016 0.016 0.001 0.003 0.006 AL 10.000 10.016 0.016 90012992000 02/13/90 AF
-0.7221 10.000 10.012 0.012 -0.004 -0.007 0.002 AL 10.000 10.012 0.012 90021411000 02/25/90 AF
-0.7221 10.000 10.006 0.006 -0.006 -0.009 -0.007 AL 10.000 10.006 0.006 90022606000 03/26/90 AF
-0.7221 10.000 10.016 0.016 0.010 0.000 -0.003 AL 10.000 10.016 0.016 90040449000 04/23/90 AF
-0.7221 10.000 10.019 0.019 0.003 0.007 0.004 AL 10.000 10.019 0.019 90042042000 04/26/90 AF
-0.7221 10.000 10.018 0.018 -0.001 0.012 0.002 AL 10.000 10.018 0.018 90042316000 05/02/90 AF
-0.7221 10.000 10.019 0.019 0.001 0.003 0.007 AL 10.000 10.019 0.019 90050355000 05/10/90 AF
-0.7221 10.000 10.019 0.019 0.000 0.000 0.013 AL 10.000 10.019 0.019 90051540000 06/14/90 AF
-0.7222 10.000 10.020 0.020 0.001 0.002 0.004 AL 10.000 10.020 0.020 90062419000 07/09/90 AF
-0.7221 10.000 10.019 0.019 -0.001 0.000 0.000
1 NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET pREuN. CCN NO.
picE Or f
CCN CONVER$10N:
Project or DCP/MMP M/A Calc No.
Mra nD CCN NO.
CCN-Subject NI Subchannel Gafn Calibration As-Found / As tef t Data Sheet No.
71 l
REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE
)
O BOCKHORST 09/07/93 QUINN 09/10/93 REV IND AL 10.000 10.019 0.019 90071141000 07/16/90 AF
-0.7221 10.000 10.012 0.012 -0.007 -0.007 -0.006 AL 10.000 10.012 0.012 90072325000 08/07/90 AF
-0.7221 10.000 10.016 0.016 0.004 -0.004 -0.003 AL 10.000 10.016 0.016 90081593000 08/30/90 AF
-0.7221 10.000 10.018 0.018 0.002 -0.001 -0.001 AL 10.000 10.018 0.018 90090929000 09/27/90 AP
-0.7221 10.000 10.015 0.015 -0.003 0.003 -0.005 AL 10.000 10.015 0.015 90100160000 10/25/90 AF
-0.7221 10.000 10.016 0.016 0.001 0.000 -0.003 AL 10.000 10.016 0.016
(
l 90110047000 11/30/90 AF
-0.7221 10.000 10.020 0.020 0.004 0.002 0.008 AL 10.000 10.020 0.020 90120349000 12/21/90 AF
-0.7221 10.000 10.013 0.013 -0.007 -0.002 -0.003 AL 10.000 10.013 0.013 f
90122071000 01/21/91 AP
-0.7221 10.000 10.016 0.016 0.003 0.000 -0.002 AL 10.000 10.016 0.016 91012915000 02/20/91 AF
-0.7221 10.000 10.015 0.015 -0.001 -0.005 0.000 AL 10.000 10.015 0.015 91030405000 03/22/91 AF
-0.7221 10.000 10.018 0.018 0.003 0.005 0.002 AL 10.000 10.018 0.018 f
91040069000 04/09/91 AF
-0.7221 10.000 10.017 0.017 -0.001 0.001 -0.003 AL 10.000 10.017 0.017 91041901000 05/07/91 AF
-0.7221 10.000 10.019 0.019 0.002 0.004 0.006 AL 10.000 10.019 0.019 91051452000 05/20/91 AF
-0.7221 10.000 10.020 0.020 0.001 0.002 0.004 i
AL 10.000 10.020 0.020 91052582000 05/31/91 AF
-0.7221 10.000 10.018 0.018 -0.002 0.001 0.003 AL 10.000 10.018 0.018 91060732000 06/21/91 AF
-0.7221 10.000 10.029 0.029 0.011 0.010 0.011 AL 10.000 10.029 0.029 91070551000 07/20/91 AF
-0.7221 10.000 10.021 0.021 -0.008 0.001 0.004 AL 10.000 10.021 0.021 91080168000 08/08/91 AF
-0.7221 10.000 10.019 0.019 -0.002 0.001 0.000 AL 10.000 10.019 0.019 91081134000 09/06/91 AF
-0.7221 10.000 10.017 0.017 -0.002 -0.012 -0.003 AL 10.000 10.017 0.017 91091378000 10/04/91 AF
-0.7221 10.000 10.020 0.020 0.003 -0.001 0.002 AL 10.000 10.020 0.020 91101273000 10/29/91 AF
-0.7221 10.000 10.009 0.009 -0.011 -0.010 -0.020 AL 10.000 10.009 0.009 91110829000 11/26/91 AF
-0.7221 10.000 10.009 0.009 0.000 -0.008 -0.012 AL 10.000 10.009 0.009 91120814000 12/26/91 AF
-0.7221 10.000 10.006 0.006 -0.003 -0.014 -0.013 AL 10.000 10.006 0.006 i
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET PREtin. CCN NO.
PAGE OF CCN CONVER$10N:
)
Project or DCP/MMP M/A Calc No.
J tFA ni?
CCN NO.
CCN-Subject NI Subchannel Gain Calibration As.Found / As Lef t Data Sheet No.
72 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE D
80CKHOR$T 09/07/93 QUINN 09/10/93 REV
[NO 1
1 l
Unit 3 Channel B Amplifier A-12
{
MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89011219000 01/27/89 AF
-0.7621 10.000 9.989 -0.011 AL 10.000 9.989 -0.011 89021059000 02/24/89 AF
-0.7621 10.000 10.003 0.003 0.014 j
AL 10.000 10.003 0.003 i
89030718000 03/24/89 AF
-0.7621 10.000 9.998 -0.002 -0.005 AL 10.000 9.998 -0.002 89033628000 04/07/89 AF
-0.7621 10.000 10.000 0.000 0.002 0.011 j
AL 10.000 10.000 0.000 1
89040974000 04/14/09 AF
-0.7671 10.000 10.000 0.000 0.000 -0.003 l
AL 10.000 10.000 0.000 89042181000 05/14/89 AF
-0.7611 10.000 9.999 -0.001 -0.001 0.001 0.010 AL 10.000 9.999 -0.001 1
89052590000 06/12/89 AF
-0.7621 10.000 10.000 0.000 0.001 0.000 -0.003 AL 10.000 10.000 0.000 89061700000 07/03/89 AF
-0.7621 10.000 10.000 0.000 0.000 0.000 0.002 j
AL 10.000 10.000 0.000 89070481000 07/07/89 AF
-0.7621 10.000 10.000 0.000 0.000 0.001 0.000 AL 10.000 10.000 0.000 89071803000 08/07/09 AP
-0.7621 10.000 10.000 0.000 0.000 0.000 0.000 AL 10.000 10.000 0.000 89081208000 09/01/89 AF
-0.7621 10.000 9.997 -0.003 -0.003 -0.003 -0.002 AL 10.000 9.997 -0.003 89090941000 09/29/89 AF
-0.7621 10.000 10.000 0.000 0.003 0.000 0.000 AL 10.000 10.000 0.000 89100681000 10/26/89 AF
-0.7621 10.000 9.999 -0.001 -0.001 -0.001 -0.001 AL 10.000 9.999 -0.001 89110198000 11/21/89 AF
-0.7621 10.000 10.002 0.002 0.003 0.005 0.002 AL 10.000 10.002 0.002 89112228000 12/20/89 AF
-0.7621 10.000 9.999 -0.001 -0.003 -0.001 -0.001 AL 10.000 9.999 -0.001 89122707000 01/19/90 AF
-0.7621 10.000 10.002 0.002 0.003 0.003 0.005 AL 10.000 10.002 0.002 90012992000 02/13/90 AF
-0.7621 10.000 9.996 -0.004 -0.006 -0.006 -0.004 AL 10.000 9.996 -0.004 90021411000 02/25/90 AF
-0.7621 10.000 9.997 -0.003 0.001 -0.002 -0.002 AL 10.000 9.997 -0.003 90022606000 03/26/90 AF
-0.7621 10.000 10.001 0.001 0.004 -0.001 -0.001 AL 10.000 10.001 0.001 90040449000 04/23/90 AF
-0.7621 10.000 10.000 0.000 -0.001 0.004 0.001 AL 10.000 10.000 0.000 90042042000 04/26/90 AF
-0.7621 10.000 9.999 -0.001 -0.001 0.002 -0.003 AL 10.000 9.999 -0.001 90042316000 05/02/90 AF
-0.7621 10.000 10.001 0.001 0.002 0.000 0.005 AL 10.000 10.001 0.001 90050355000 05/10/90 AF
-0'.7621 10.000 9.999 -0.001 -0.002 -0.001 0.002 AL 10.000 9.999 -0.001 90051540000 06/14/90 AF
-0.7621 10.000 10.000 0.000 0.001 0.001 -0.001 AL 10.000 10.000 0.000 90062419000 07/09/90 AF
-0.7621 10.000 10.001 0.001 0.001 0.000 0.001
NES&L DEPARTMENT j
ICCN N0/
CALCULATIONSHEET PREuN. CCN NO.
PACE 0,
CCN CONVERSION:
Project or DCP/MMP u/A Calc No.
3 U A of?
CCN No. CCN-Subject NT Subchannel Gain Calibration As-Found / As teft Data Sheet No.
73 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE REV O
SOCKHORST 09/07/93 QUINN 09/10/93 IND AL 10.000 10.001 0.001 90071141000 07/16/90 AF
-0.7621 10.000 9.996 -0.004 -0.005 -0.003 -0.003 AL 10.000 9.996 -0.004 90072325000 08/07/90 AF
-0.7621 10.000 9.998 -0.002 0.002 -0.002 -0.003 AL 10.000 9.998 -0.002 90081593000 08/30/90 AF
-0.7621 10.000 9.999 -0.001 0.001 -0.002 0.000 AL 10.000 9.999 -0.001 90090929000 09/27/90 AF
-0.7621 10.000 9.999 -0.001 0.000 0.003 -0.001 AL 10.000 9.999 -0.001 90100160000 10/25/90 AF
-0.7621 10.000 9.999 -0.001 0.001 0.002 -0.001 AL 10.000 9.999 -0.001 90110047000 11/30/90 AF
-0.7621 10.000 10.002 0.002 0.003 0.004 0.007 AL 10.000 10.002 0.002
'90120349000 12/21/90 AF
-0.7621 10.000 9.993 -0.007 -0.006 -0.002 -0.001 AL 10.000 9.993 -0.007 90122071000 01/21/91 AF
-0.7621 10.000 9. 9 9'/ -0.003 0.004 0.001 0.002 AL 10.000 9.997 -0.003 91012915000 02/20/91 AF
-0.7621 10.000 9.995 -0.005 -0.002 -0.004 0.000 AL 10.000 9.995 -0.005 91030405000 03/22/91 AF
-0.7621 10.000 9.998 -0.002 0.003 0.005 0.002 AL 10.000 9.998 -0.002 91040069000 04/09/91 AF
-0.7621 10.000 9.997 -0.003 -0.001 0.000 -0.002 AL 10.000 9.997 -0.003 91041901000 05/07/91 AF
-0.7621 10.000 9.999 -0.001 0.002 0.004 0.006 AL 10.000 9.999 -0.001 91051452000 05/20/91 AF
-0.7621 10.000 10.000 0.000 0.001 0.002 0.003 AL 10.000 10.000 0.000 91052582000 05/31/91 AF
-0.7621 10.000 9.999 -0.001 -0.001 0.002 0.004 AL 10.000 9.999 -0.001 91060732000 06/21/91 AF
-0.7621 10.000 10.009 0.009 0.010 0.010 0.011 AL 10.000 10.009 0.009 91070551000 07/20/91 AF
-0.7621 10.000 10.000 0.000 -0.009 0.000 0.003 AL 10.000 10.000 0.000 91080160000 08/08/91 AF
-0.7621 10.000 9.999 -0.001 -0.001 0.000 0.000 AL 10.000 9.999 -0.001 91081134000 09/06/91 AF
-0.7621 10.000 9.999 -0.001 0.000 -0.010 -0.001 AL 10.000 9.999 -0.001 91091378000 10/04/91 AF
-0.7621 10.000 10.000 0.000 0.001 0.000 0.001 AL 10.000 10.000 0.000 91101273000 10/29/91 AF
-0.7621 10.000 10.076 0.076 0.076 0.077 0.067 AL 10.000 10.076 0.076 91110829000 11/26/91 AF
-0.7621 10.000 10.011 0.011 -0.065 0.012 0.011 AL 10.000 10.011 0.011 91120814000 12/26/91 AF
-0.7621 10.000 10.005 0.005 -0.006 0.005 0.006 AL 10.000 10.005 0.005
NES&L DEPARTMENT ICCN N0/
CALCULATIONSIEET PartiN. CCN NO.
PAGe ____ or CCN CONVERSION:
Project or DCP/MMP WA Calc No.
J-U A-M P CCW NO.
CCN-Subject NI Subchannel ' Geln Calibration As-Found / As*Lef t Data Sheet No. __ 74 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE 0
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 3 Channel C Amplifier A-10 MonthlQuarter 150 Da M.O.
Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89010182000 01/08/89 AF
-0.6902 10.000 10.029 0.029 AL 10.000 10.029 0.029 89011220000 02/07/89 AF
-0.6902 10.000 10.002 0.002 -0.027 AL 10.000 10.002 0.002 89021619000 03/06/89 AF
-0.6902 10.000 10.009 0.009 0.007 AL 10.000 10.009 0.009 89031319000 04/05/89 AF
-0.6902 10.000 10.009 0.009 0.000 -0.020 AL 10.000 10.009 0.009 89040976000 04/12/89 AF
-0.6902 10.000 10.016 0.016 0.007 0.014 AL 10.000 10.016 0.016 89042158000 04/29/89 AF
-0.6902 10.000 10.040 0.040 0.024 0.031 0.011 AL 10.000 10.040 0.040 89051056000 05/29/89 AF
-0.6902 10.000 10.014 0.014 -0.026 0.005 0.012 AL 10.000 10.014 0.014 89060400000 06/26/89 AF
-0.6902 10.000 10.003 0.003 -0.011 -0.013 -0.006 AL 10.000 10.003 0.003 89063024000 07/03/09 AF
-0.6902 10.000 10.003 0.003 -0.011 -0.048 -0.017 AL 10.000 10.003 0.003 89070483000 07/07/89 AF
-0.6902 10.000 10.004 0.004 0.001 -0.021 -0.023 AL 10.000 10.004 0.004 89071802000 07/25/89 AF
-0.6902 10.000 9.999 -0.001 -0.005 -0.015 -0.052 AL 10.000 9.999 -0.001 89072780000 08/24/89 AF
-0.6902 10.000 10.031 0.031 0.032 0.028 0.006 AL 10.000 10.031 0.031 89083534000 09/20/89 AF
-0.6902 10.000 10.060 0.060 0.029 0.056 0.046 AL 10.000 10.000 0.000 89092752000 10/16/89 AF
-0.6902 10.000 9.952 -0.040 -0.048 0.013 0.009 AL 10.000 9.952 -0.048 89102438000 11/09/89 AF ( -0.6902 10.000 9.993 -0.007 0.041 0.022 0.049 AL 10.000 9.993 -0.007 89111468000 12/08/89 AF
-0.6902 10.000 9.993 -0.007 0.000 -0.007 0.054 AL 10.000 9.993 -0.007 89121769000 01/05/90 AF
-0.6902 10.000 9.999 -0.001 0.006 0.047 0.028 AL 10.000 9.999 -0.001 90011301000 02/02/90 AF
-0.6902 10.000 9.999 -0.001 0.000 0.006 -0.001 AL 10.000 9.999 -0.001 90020705000 02/25/90 AF
-0.6902 10.000 10.000 0.000 0.001 0.007 0.048 AL 10.000 10.000 0.000 90022607000 03/27/90 AF
-0.6902 10.000 9.999 -0.001 -0.001 0.000 0.006 AL 10.000 9.999 -0.001 90040774000 04/23/90 AF
-0.6902 10.000 10.003 0.003 0 004 0.004 0.010 AL 10.000 10.003 0.003 90041983000 04/26/90 AF
-0.6902 10.000 10.001 0.001 0.002 0.005 0.006 AL 10.000 10.001 0.001 90042317000 05/02/90 AF
-0.6902 10.000 10.002 0.002 0.001 0.007 0.007 AL 10.000 10.002 0.002 i
90050293000 05/10/90 AF
-0.6902 10.000 10.000 0.000 -0.002 0.001 0.004 AL 10.000 10.000 0.000 90051542000 06/14/90 AF
-0.6902 10.000 10.003 0.003 0.003 0.002 0.008
NES&L DEPARTMENT ICCN NO/
CALCULATIONSHEET PRELIM. CCN NO.
PAGE OF CCN CONVER$!ON:
Project or DCP/MMP M/A Calc No.
.1-M A -fl17 CCN NO.
CCN-f Subject NI Subchannel Gain Calibration As Found / As teft Data sheet No.
75 ORIGINATOR DATE IRE DATE REV CRIGINATOR DATE 1RE DATE lREV O
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND AL 10.000 10.003 0.003 90062026000 07/10/90 AF
-0.6902 10.000 10.006 0.006 0.003 0.004 0.007 l
AL 10.000 10.006 0.006 90071145000 07/17/90 AF
-0.6902 10.000 10.000 0.000 -0.006 0.000 -0.001 AL 10.000 10.000 0.000 90072355000 08/09/90 AF
-0.6902 10.000 10.003 0.003 0.003 0.000 0.001 l
AL 10.000 10.003 0.003 90081594000 09/07/90 AF
-0.6902 10.000 9.999 -0.001 -0.004 -0.007 -0.001 AL 10.000 9.999 -0.001 90091588000 10/04/90 AF
-0.6902 10.000 9.997 -0.003 -0.002 -0.003 -0.006 AL 10.000 9.997 -0.003 90102097000 11/02/90 AF
-0.6902 10.000 9.994 -0.006 -0.003 -0.009 -0.012 AL 10.000 9.994 -0.006 90110393000 11/28/90 AF
-0.6902 1C.000 10.020 0.020 0.026 0.021 0.020 AL 10.000 10.020 0.020 90120210000 12/29/90 AF
-0.6902 10.000 9.996 -0.004 -0.024 -0.001 -0.007 AL 10.000 9.996 -0.004 91010217000 01/25/91 AF
-0.6902 10.000 9.997 -0.003 0.001 0.003 -0.002 AL 10.000 9.997 -0.003 91022061000 02/26/91 AF
-0.6902 10.000 10.001 0.001 0.004 -0.019 0.004 AL 10.000 10.001 0.001 91030753000 03/17/91 AF
-0.6902 10.000 10.001 0.001 -0.000 0.005 0.007 AL 10.000 10.001 0.001 91040981000 04/15/91 AF
-0.6902 10.000 10.000 0.000 -0.001 0.002 -0.021 i
AL 10.000 10.000 0.000 l
91041996000 05/13/91 AF
-0.6902 10.000 9.999 -0.001 -0.001 -0.003 0.002 l
AL 10.000 9.999 -0.001 91051814000 05/21/91 AF
-0.6902 10.000 10.001 0.001 0.002 -0.000 0.003 i
1 AL 10.000 10.001 0.001 91060733000 06/27/91 AF
-0.6902 10.000 9.996 -0.004 -0.005 -0.004 -0.006 AL 10.000 9.996 -0.004 no m.o.
07/25/91 AF ERR ERR ERR ERR AL ERR 91081133000 08/22/91 AF
-0.6902 10.000 10.001 0.001 ERR ERR ERR AL 10.000 10.001 0.001 91090321000 09/22/91 AF
-0.6902 10.000 10.001 0.001 0.000 ERR ERR AL 10.000 10.001 0.001 91100140000 10/17/91 AP
-0.6902 10.000 9.997 -0.003 -0.004 ERR ERR AL 10.000 9.997 -0.003 91102121000 11/14/91 AF
-0.6902 10.000 10.000 0.000 0.003 -0.001 ERR AL 10.000 10.000 0.000 l
91112195000 12/12/91 AF
-0.6902 10.000 10.002 0.002 0.002 0.001 ERR AL 10.000 10.002 0.002 1
1 i
l i
1
- _ _ ~ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _
NES6L DEPARTMENT ICCN N0/
CALCULATIONSHEET muN. CCN
=0.
PACE Or CCN CONVERSION:
Project or DCP/MMP M /A Calc No.
J.U A-W CCN NO.
CCN-Stbject N1 Subchannel Geln Calibration As Found / As Lef t Data
_ Sheet No.
76 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE
!RE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 3 Channel C Amplifier A-11 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89010182000 01/08/89 AF
-0.6588 10.000 10.004 0.004 AL 10.000 10.004 0.004 89011220000 02/07/89 AF
-0.6588 10.000 10.004 0.004 0.000 AL 10.000 10.004 0.004 89021619000 03/06/89 AF
-0.6588 10.000 10.008 0.008 0.004 AL 10.000 10.008 0.000 89031319000 04/05/89 AF
-0.6588 10.000 10.006 0.006 -0.002 0.002 AL 10.000 10.006 0.006 89040976000 04/12/89 AF
-0.6588 10.000 10.002 0.002 -0.004 -0.002 AL 10.000 10.002 0.002 8904215J000 04/29/89 AF
-0.6588 10.000 10.000 0.000 -0.002 -0.008 -0.004 AL 10.000 10.000 0.000 89051056000 05/29/89 AF
-0.6588 10.000 10.003 0.003 0.003 -0.003 -0.001 AL 10.000 10.003 0.003 89060400000 06/26/89 AF
-0.6588 10.000 10.000 0.000 -0.003 -0.002 -0.008 AL 10.000 10.000 0.000 89063024000 07/03/89 AF
-0.6588 10.000 10.002 0.002 0.002 0.002 -0.004 AL 10.000 10.002 0.002 89070483000 07/07/89 AF
-0.6588 10.000 10.002 0.001 -0.001 -0.002 -0.001 AL 10.000 10.001 0.001 89071802000 07/25/89 AF
-0.6588 10.000 10.001 0.001 0.000 0.001 0.001 AL 10.000 10.001 0.001 89072780000 08/24/89 AF
-0.6588 10.000 9.999 -0.001 -0.002 -0.003 -0.004 AL 10.000 9.999 -0.001 89083534000 09/20/89 AF
-0.6588 7.0.000 10.000 0.000 0.001 -0.001 0.000 AL 10.000 10.000 0.000 89092752000 10/16/89 AF
-0.6588 10.000 9.997 -0.003 -0.003 -0.004 -0.005 AL 10.000 9.997 -0.003 89102438000 11/09/89 AF
-0.6588 10.000 9.998 -0.002 0.001 -0.001 -0.003 AL 10.000 9.998 -0.002 89111468000 12/08/89 AF
-0.6588 10.000 9.994 -0.006 -0.004 -0.006 -0.007 AL 10.000 9.994 -0.006 89121769000 01/05/90 AF
-0.6588 10.000 9.996 -0.004 0.002 -0.001 -0.003 AL 10.000 9.996 -0.004 90011301000 02/02/90 AF
-0.6588 10.000 9.999 -0.001 0.003 0.001 -0.001 AL 10.000 9.999 -0.001 90020705000 02/25/90 AF
-0.6588 10.000 10.000 0.000 0.001 0.006 0.003 AL 10.000 10.000 0.000 90022607000 03/27/90 AF
-0.6588 10.000 10.006 0.006 0.006 0.010 0.008 AL 10.000 10.006 0.006 90040774000 04/23/90 AF
-0.6588 10.000 10.001 0.001 -0.005 0.002 0.007 AL 10.000 10.001 0.001 90041983000 04/26/90 AF
-0.6588 10.000 10.001 0.001 -0.005 -0.004 -0.000 AL 10.000 10.001 0.001 90042317000 05/02/90 AF
-0.6588 10.000 10.000 0.000 -0.001 -0.011 -0.004 AL 10.000 10.000 0.000 90050293000 05/10/90 AF
-0.6588 10.000 10.000 0.000 0.000 -0.006 -0.005 AL 10.000 10.000 0.000 90051542000 06/14/90 AF
-0.6588 10.000 10.004 0.004 0.004 0.003 -0.007
NES&L DEPARTMENT ICCN h0/
partiN. CCN No.
pAGr or CALCULATIONSIEET CCN CONVERSION:
Proj ect or DCP/MMP W/A Calc No.
J-UA-017 CCN NO.
CCN-Subject NT Subchannet Gain Calibration As.Found / As Lef t Data sheet No.
77 REV ORIGINATOR DATE
!RE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCKHORST 09/07/93 QU!NN 09/10/93 IND AL 10.000 10.004 0.004 90062026000 07/10/90 AF
-0.6588 10.000 9.997 -0.003 -0.007 -0.003 -0.009 AL 10.000 9.997 -0.003 90071145000 07/17/90 AF
-0.6588 10.000 9.998 -0.002 0.001 -0.002 -0.003 AL 10.000 9.998 -0.002 90072355000 08/09/90 AF
-0.6588 10.000 10.000 0.000 0.002 -0.004 0.000 AL 10.000 10.000 0.000 90081594000 0?/07/90 AF
-0.6588 10.000 9.997 -0.003 -0.003 0.000 -0.003 AL 10.000 9.997 -0.003 90091588000 10/04/90 AF
-0.6588 10.000 9.996 -0.004 -0.001 -0.002 -0.008 AL 10.000 9.996 -0.004 90102097000 11/02/90 AF
-0.6588 10.000 9.999 -0.001 0.003 -0.001 0.002 AL 10.000 9.999 -0.001 90110393000 11/28/90 AF
-0.6588 10.000 10.020 0.020 0.021 0.023 0.022 AL 10.000 10.020 0.020 90120210000 12/29/90 AF
-0.6588 10.000 9.998 -0.002 -0.022 0.002 -0.002 AL 10.000 9.998 -0.002 91010217000 01/25/91 AF
-0.6588 10.000 9.995 -0.005 -0.003 -0.004 -0.002 AL 10.000 9.995 -0.005 91022061000 02/26/91 AF
-0.6588 10.000 9.999 -0.001 0.004 -0.021 0.003 AL 10.000 9.999 -0.001 91030753000 03/17/91 AF
-0.6588 10.000 10.000 0.000 0.001 0.002 0.001 AL 10.000 10.000 0.000 91040981000 04/15/91 AF
-0.6588 10.000 10.000 0.000 0.000 0.005 -0.020 AL 10.000 10.000 0.000 91041996000 05/13/91 AF
-0.6588 10.000 9.998 -0.002 -0.002 -0.001 0.000 AL 10.000 9.998 -0.002 91051814000 05/21/91 AF
-0.6588 10.000 9.998 -0.002 0.000 -0.002 0.003 AL 10.000 9.998 -0.002 91060733000 OG/27/91 AF
-0.6588 10.000 10.004 0.004 0.006 0.004 0.005 AL 10.000 10.004 0.004 ERR ERR ERR ERR no m.o.
07/25/91 AF ERR AL 91081133000 08/22/91 AF
-0.6588 10.000 10.008 0.008 ERR ERR ERR AL 10.000 10.008 0.008 91090321000 09/22/91 AF
-0.6588 10.000 10.003 0.003 -0.005 ERR ERR AL 10.000 10.003 0.003 91100148000 10/17/91 AF
-0.6588 10.000 10.001 0.001 -0.002 ERR ET.R AL 10.000 10.001 0.001 91102121000 11/14/91 AF
-0.6588 10.000 10.000 0.000 -0.001 -0.008 ERR AL 10.000 10.000 0.000 91112195000 12/12/91 AF
-0.6588 10.000 10.003 0.003 0.003 0.000 ERR AL 10.000 10.003 0.003
NES&L DEPNRTMENT j
ICCN N0/
)
CALCULATIONSHEET paEuN. ccN NO.
pace Or 1
CCN CONVERSION:
Project or DCP/MF WA talc No.
J-UA-09 CCN NO.
CCN-
$@ ject NI $4channet Gain Calibration As 4ound / As l. eft Date Sheet No.
78 f
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND j
i l
l Unit 3 Channel C l
Amplifier A-12 I
MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift j
89010182000 01/08/89 AF
-0.7287 10.000 9.994 -0.006 AL 10.000 9.994 -0.006 1
89011220000 02/07/89 AF
-0.7207 10.000 9.992 -0.000 -0.002 AL 10.000 9.992 -0.008 89021619000 03/06/89 AF
-0.7287 10.000 9.999 -0.001 0.007 AL 10.000 9.999 -0.001 89031319000 04/05/89 AF
-0.7287 10.000 10.000 0.000 0.001 0.006 AL 10.000 10.000 0.000
)
89040976000 04/12/89 AF
-0.7287 10.000 9.997 -0.003 -0.003 0.005 AL 10.000 9.997 -0.003 89042158000 04/29/89 AF
-0.7287 10.000 9.990 -0.010 -0.007 -0.009 -0.004 AL 10.000 9.990 -0.010 89051056000 05/29/89 AF
-0.7287 10.000 9.999 -0.001 0.009 -0.001 0.007 AL 10.000 9.999 -0.001 89060400000 06/26/89 AF
-0.7287 10.000 10.000 0.000 0.001 0.003 0.001 AL 10.000 10.000 0.000 8906302400D 07/03/89 AF
-0.7287 10.000 10.000 0.000 0.001 0.011 0.001 AL 10.000 10.000 0.000 89070483000 07/07/89 AF
-0.7287 10.000 10.000 0.000 0.000 0.002 0.004 AL 10.000 10.000 0.000 89071802000 07/25/89 AF
-0.7287 10.000 10.000 0.000 0.000 0.001 0.011 AL 10.000 10.000 0.000 89072780000 08/24/89 AF
-0.7287 10.000 9.999 -0.001 -0.001 -0.001 0.001 AL 10.000 9.999 -0.001 89083534000 09/20/89 AF
-0.7287 10.000 10.000 0.000 0.001 0.000 0.001 AL 10.000 10.000 0.000
)
89092752000 10/16/89 AF
-0.7287 10.000 9.999 -0.001 -0.001 -0.001 -0.001 i
AL 10.000 9.999 -0.001 1
89102438000 11/09/89 AF
-0.7287 10.000 9.993 -0.007 -0.006 -0.006 -0.007 AL 10.000 9.993 -0.007 8912 468000 12/08/89 AF
-0.7287 10.000 10.000 0.000 0.007 0.000 0.000
)
AL 10.000 10.000 0.000 89121769000 01/05/90 AF
-0.7287 10.000 10.000 0.000 0.000 0.001 0.001 AL 10.000 10.000 0.000 90011301000 02/02/90 AF
-0.7287 10.000 9.999 -0.001 -0.001 0.006 -0.001 AL 10.000 9.999 -0.001 90020705000 02/25/90 AF
-0.7287 10.000 9.999 -0.001 0.000 -0.001 0.000 AL 10.000 9.999 -0.001 90022607000 03/27/90 AF
-0.7287 10.000 9.998 -0.002 -0.001 -0.002 0.005 j
AL 10.000 9.998 -0.002 90040774000 04/23/90 AF
-0.7287 10.000 10.004 0.004 0.006 0.005 0.004 AL 10.000 10.004 0.004 90041983000 04/26/90 AF
-0.7287 10.000 10.003 0.003 0.005 0.010 0.009 AL 10.000 10.003 0.003 90042317000 05/02/90 AF
-0.7287 10.000 10.003 0.003 0.000 0.011 0.010 AL 10.000 10.003 0.003 l
90050293000 05/10/90 AF
-0.7287 10.000 10.000 0.000 -0.003 0.002 0.007 1
AL 10.000 10.000 0.000 90051542000 06/14/90 AF
-0.7287 10.000 10.007 0.007 0.007 0.004 0.015 l
NES&L DEPFJUDMENT ICCN NO/
CALCULATIONSIEET pREtiN. CCN No.
PAGE or CCN CONVERSION:
Proj ect or DCP/MMP M/A Calc No.
J-MA m CCN NO.
CCN-Subject NI Subchannet Gain Calibration As Found / As Lef t Data Sheet No.
79 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV O
BOCKHORST 09/07/93 QUINN 09/10/93 IND AL 10.000 10.007 0.007 90062026000 07/10/90 AF
-0.7287 10.000 10.012 0.012 0.005 0.009 0.014 i
AL 10.000 10.012 0.012 90071145000 07/17/90 AF
-0.7287 10.000 10.002 0.002 -0.010 0.002 -0.001 1
AL 10.000 10.002 0.002 90072355000 08/09/90 AF
-0.7287 10.000 10.004 0.004 0.002 -0.003 0.001 AL 10.000 10.004 0.004 90081594000 09/07/90 AF
-0.7287 10.000 10.001 0.001 -0.003 -0.011 0.001 AL 10.000 10.001 0.001 90091588000 10/04/90 AF
-0.7287 10.000 10.000 0.000 -0.001 -0.002 -0.007 AL 10.000 10.000 0.000 90102097000 11/02/90 AF
-0.7287 10.000 10.005 0.005 0.005 0.001 -0.007 i
AL 10.000 10.005 0.005 90110393000 11/28/90 AF
-0.7287 10.000 10.027 0.027 0.022 0.026 0.025 AL 10.000 10.027 0.027 90120210000 12/29/90 AF
-0.7287 10.000 10.006 0.006 -0.021 0.006 0.002 AL 10.000 10.006 0.006 ERR ERR ERR ERR 91010217000 01/25/91 AF AL ERR 91022061000 02/26/91 AF
-0.7287 10.000 9.942 -0.058 ERR ERR ERR AL 10.000 9.942 -0.058 91030753000 03/17/91 AF
-0.7287 10.000 9.993 -0.007 0.0"1 ERR ERR AL 10.000 9.993 -0.007 91040981000 04/15/91 AF
-0.7287 10.000 9.995 -0.005
) s02 ERR ERR AL 10.000 9.995 -0.005 91041996000 05/13/91 AF
-0.7287 10.000 9.998 -0.002 0.003 0.056 ERR AL 10.000 9.998 -0.002 91051814000 05/21/91 AF
-0.7287 10.000 9.999 -0.001 0.001 0.006 ERR AL 10.000 9.999 -0.001 91060733000 06/27/91 AF
-0.7287 10.000 9.997 -0.003 -0.002 0.002 0.055 AL 10.000 9.997 -0.003
)
ERR ERR ERR ERR no m.o.
07/25/91 AP AL ERR 91081133000 08/22/91 AF
-0.7287 10.000 10.004 0.004 ERR ERR ERR AL 10.000 10.004 0.004 91090321000 09/22/91 AF
-0.7287 10.000 10.002 0.002 -0.002 ERR ERR AL 10.000 10.002 0.002 91100148000 10/17/91 AF
-0.7287 10.000 10.002 0.002 0.000 ERR ERR AL 10.000 10.002 0.002 91102121000 11/14/91 AF
-0.7287 10.000 10.000 0.000 -0.002 -0.004 ERR AL 10.000 10.000 0.000 91112195000 12/12/91 AF
-0.7287 10.000 10.005 0.005 0.005 0.003 ERR AL 10.000 10.005 0.005
)
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET PR E u s.
CCN NO.
Pace or CCN CONVER$10N:
Project or DCP/MMP WM Calc No.
J-W-dU CCN NO.
CCN-Subject NI Subchannel G8In Calibration AS*Found / As*Left Data Sheet No.
80 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 3 Channel D Amplifier A-10 MonthlQuarter 150 Da M.O.
Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89010355000 01/08/89 AF
-0.6672 10.000 10.009 0.009 AL 10.000 10.002 0.002 89011221000 02/08/89 AF
-0.6672 10.000 10.014 0.014 0.012 AL 10.000 10.014 0.014 89021871000 03/07/89 AF
-0.6672 10.000 10.033 0.033 0.019 AL 10.000 10.008 0.008 89031320000 04/06/89 AF
-0.6672 10.000 10.014 0.014 0.006 0.037 AL 10.000 10.014 0.014 89040978000 04/14/89 AF
-0.6672 10.000 10.003 0.003 -0.011 0.014 AL 10.000 10.003 0.003 89042179000 05/04/89 AF
-0.6672 10.000 10.000 0.000 0.005 0.000 0.031 AL 10.000 10.008 0.008 89051404000 06/03/89 AF
-0.6672 10.000 10.007 0.007 -0.001 -0.007 0.018 AL 10.000 10.007 0.007 89061042000 06/30/89 AF
-0.6672 10.000 10.008 0.008 0.001 0.005 0.000 AL 10.000 10.008 0.008 89070480000 07/07/89 AF
-0.6672 10.000 10.010 0.010 0.003 0.003 -0.003 AL 10.000 10.010 0.010 89071319000 07/27/89 AF
-0.6672 10.000 10.010 0.010 0.000 0.004 0.008 AL 10.000 10.010 0.010 89080382000 08/24/89 AF
-0.6672 10.000 10.007 0.007 -0.003 0.000 0.000 AL 10.000 10.007 0.007 89083637000 09/20/89 AF
-0.6672 10.000 10.011 0.011 0.004 0.001 0.005 AL 10.000 10.011 0.011 89092751000 10/16/89 AF
-0.6672 10.000 10.007 0.007 -0.004 -0.003 0.000 AL 10.000 10.007 0.007 89102727000 11/18/89 AF
-0.6672 10.000 10.008 0.008 0.001 0.001 -0.002 AL 10.000 10.008 0.008 89112055000 12/15/89 AF
-0.6672 10.000 10.029 0.029 0.021 0.018 0.019 AL 10.000 10.005 0.005 89122702000 01/12/90 AF
-0.6672 10.000 10.020 0.020 0.015 0.037 0.037 AL 10.000 10.020 0.020 90012246000 02/09/90 AF
-0.6672 10.000 10.015 0.015 -0.005 0.031 0.028 AL 10.000 10.015 0.015 90021281000 02/25/90 AF
-0.6672 10.000 10.022 0.022 0.007 0.017 0.039 AL 10.000 10.022 0.022 90022609000 03/27/90 AF
-0.6672 10.000 9.976 -0.024 -0.046 -0.044 -0.008 AL 10.000 9.976 -0.024 90041285000 04/23/90 AF
-0.6672 10.000 9.977 -0.023 0.001 -0.038 -0.028 AL 10.000 9.977 -0.023 90042318000 05/02/90 AF
-0.6672 10.000 9.976 -0.024 -0.001 -0.046 -0.044 AL 10.000 9.976 -0.024 90050296000 05/10/90 AF
-0.6672 10.000 9.972 -0.028 -0.004 -0.004 -0.043 AL 10.000 9.900 -0.100 90051543000 05/17/90 AF
-0.6672 10.000 9.972 -0.028 0.072 0.067 0.022 AL 10.000 9.972 -0.028 900519S4000 06/18/90 AF
-0.6672 10.000 9.971 -0.029 -0.001 0.067 0.067 AL 10.000 9.971 -0.029 90062678000 07/09/90 AF
-0.6672 10.000 9.975 -0.025 0.004 0.075 0.070
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET PeEtiN. CCN No.
9 ace or CCN CONVERSION:
Project or CCP/MMP M/A Calc No.
W A-W CCN NO.
CCN-Subject N1 Subchannel Gain Cellbration As-Found / As-Left Data Sheet No.
81 REV ORIGINATOR DATE 1RE DATE REV ORIGINATOR DATE IRE DATE D
BOCKHORST 09/07/93 QUINN 09/10/93 REV INO AL 10.000 9.975 -0.025 90071147000 07/17/90 AF
-0.6672 10.000 9.972 -0.028 -0.003 0.000 0.068 AL 10.000 9.972 -0.028 90072357000 08/09/90 AF
-0.6672 10.000 9.970 -0.030 -0.002 -0.001 0.070 AL 10.000 9.970 -0.030 90081595000 09/07/90 AF
-0.6672 10.000 9.968 -0.032 -0.002 -0.007 -0.004 AL 10.000 10.010 0.010 90091589000 10/05/90 AF
-0.6672 10.000 10.009 0.009 -0.001 -0.005 -0.004 AL 10.000 10.009 0.009 90102096000 11/02/90 AF
-0.6672 10.000 10.013 0.013 0.004 0.001 -0.004 AL 10.000 10.013 0.013 90110399000 11/28/90 AF
-0.6672 10.000 9.999 -0.001 -0.014 -0.011 -0.015 AL 10.000 9.999 -0.001 90120337000 12/26/90 AF
-0.6672 10.000 10.013 0.013 0.014 0.004 0.001 AL 10.000 10.013 0.013 90122205000 01/26/91 AF
-0.6672 10.000 10.018 0.018 0.005 0.005 0.008 AL 10.000 10.018 0.018 91020047000 02/26/91 AF
-0.6672 10.000 10.010 0.018 0.000 0.019 0.009 AL 10.000 10.018 0.018 91031354000 03/16/91 AF
-0.6672 10.000 10.016 0.016 -0.002 0.003 0.003 AL 10.000 10.016 0.016 91040039000 04/15/91 AF
-0.6672 10.000 10.017 0.017 0.001 -0.001 0.018 AL 10.000 10.017 0.017 91042019000 05/13/91 AF
-0.6672 10.000 10.016 0.016 -0.001 -0.002 0.003 AL 10.000 10.016 0.016 91052210000 06/01/91 AF
-0.6672 10.000 10.018 0.018 0.002 0.002 0.000 AL 10.000 10.018 0.018 91060734000 06/27/91 AF
-0.6672 10.000 10.014 0.014 -0.004 -0.003 -0.004 AL 10.000 10.014 0.014 91070553000 08/02/91 AF
-0.6672 10.000 10.010 0.010 -0.004 -0.006 -0.006 AL 10.000 10.010 0.010 91081232000 08/23/91 AF
-0.6672 10.000 10.019 0.019 0.009 0.001 0.002 AL 10.000 10.019 0.019 i
91090319000 09/20/91 AF
-0.6672 10.000 10.017 0.017 -0.002 0.003 0.001 1
AL 10.000 10.017 0.017 i
91092129000 10/17/91 AF
-0.6672 10.000 10.007 0.007 -0.010 -0.003 -0.011 AL 10.000 10.007 0.007 91102123000 11/14/91 AF'
-0.6672 10.000 10.020 0.020 0.013 0.001 0.006 AL 10.000 10.020 0.020 91112201000 12/16/91 AF
-0.6672 10.000 10.020 0.020 0.000 0.003 0.010 AL 10.000 10.020 0.020 1
1 NES&L DEPARTMENT 1CCN N0/
pRetiN. CCN NO.
PACE 02 CALCULATIONSHEET CCN CONVER$10N:
Oroject or DCP/194P MH Calc No.
J trA MP CCN No. CCN-Sheet No.
82 Subject N1 Subchannel Geln Calibration As Found / As tef t Data REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE REV D
BOCKHORST 09/07/93 ou!NN 09/10/93 IND l
Unit 3 Channel D Amplifier A-11 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89010355000 01/08/89 AF
-0.6636 10.000 10.005 0.005 l
AL 10.000 10.005 0.005 89011221000 02/08/89 AF
-0.6636 10.000 10.00' O.007 0.002 i
AL 10.000 10.007 0.007 89021871000 03/07/89 AF
-0.6636 10.000 10.009 0.009 0.002 AL 10.000 10.009 0.009 89031320000 04/06/89 AF
-0.6636 10.000 10.013 0.013 0.004 0.008 AL 10.000 10.013 0.013 89040978000 04/14/89 AF
-0.6636 10.000 10.011 0.011 -0.002 0.004 AL 10.000 10.011 0.011
)
89042179000 05/04/89 AF
-0.6636 10.000 10.017 0.017 0.006 0.008 0.012 i
j AL 10.000 10.017 0.017 89051404000 06/03/89 AF
-0.6636 10.000 10.017 0.017 0.000 0.004 0.010 AL 10.000 10.017 0.017 89061042000 06/30/89 AF
-0.6636 10.000 10.016 0.016 -0.001 0.005 0.007 AL 10.000 10.016 0.016 89070480000 07/07/89 AF
-0.6636 10.000 10.017 0.017 0.001 0.000 0.004 AL 10.000 10.017 0.017 89071319000 07/27/89 AF
-0.6636 10.000 10.016 0.016 -0.001 -0.001 0.005 AL 10.000 10.016 0.016 89080382000 08/24/89 AF
-0.6636 10.000 10.015 0.015 -0.001 -0.001 -0.002 AL 10.000 10.015 0.015 89083637000 09/20/89 AF
-0.6636 10.000 10.017 0.017 0.002 0.000 0.000 AL 10.000 10.017 0.017 89092751000 10/16/89 AF
-0.6636 10.000 10.016 0.016 -0.001 0.000 0.000 AL 10.000 10.016 0.016 89102727000 11/18/89 AF
-0.6636 10.000 10.016 0.016 0.000 0.001 -0.001 AL 10.000 10.016 0.016 89112055000 12/15/89 AF
-0.6636 10.000 10.022 0.022 0.006 0.005 0.006 AL 10.000 10.000 0.000 89122702000 01/12/90 AF
-0.6636 10.000 10.020 0.020 0.020 0.026 0.027 AL 10.000 10.020 0.020 90012246000 02/09/90 AF
-0.6636 10.000 10.050 0.050 0.030 0.056 0.055 AL 10.000 10.002 0.002 90021281000 02/25/90 AF
-0.6636 10.000 9.957 -0.043 -0.045 0.005 0.011 AL 10.000 9.995 -0.005 90022609000 03/27/90 AF
-0.6636 10.000 9.995 -0.005 0.000 -0.015 0.011 AL 10.000 9.995 -0.005 90041285000 04/23/90 AF
-0.6636 10.000 9.989 -0.011 -0.006 -0.051 -0.001 j
AL 10.000 9.989 -0.011 90042318000 05/02/90 AF
-0.6636 10.000 10.019 0.019 0.030 0.024 0.009 AL 10.000 10.019 0.019 90050296000 05/10/90 AF
-0.663G 10.000 9.984 -0.016 -0.035 -0.011 -0.056 AL 10.000 9.984 -0.016 90051543000 05/17/90 AF
-0.6636 10.000 9.985 -0.015 0.001 -0.004 -0.010 AL 10.000 9.985 -0.015 90051994000 06/18/90 AF
-0.6636 10.000 9.996 -0.004 0.011 -0.023 0.001 AL 10.000 9.996 -0.004 90062678000 07/09/90 AF
-0.6636 10.000 10.026 0.026 0.030 0.042 0.037
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET pReum. CCN NO.
PACE Or CCN CONVERSION:
Project or DCP/MMP W/a Calc No.
3-tra 01?
CCN NO.
CCN-Subject NI subchannet Gain Calibration As-Found / As-Lef t Data Sheet No.
83 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
80CKHORST 09/07/93 QUINN 09/10/93 REV IND AL 10.000 10.026 0.026 90071147000 07/17/90 AF
-0.6636 10.000 10.021 0.021 -0.005 0.036 0.002 E
13.000 10.021 0.021 90072357000 08/09/90 AF
-0.6636 10.000 10.010 0.010 -0.011 0.014 0.026 AL 10.000 10.010 0.010 90081595000 09/07/90 AF
-0.6636 10.000 10.005 0.005 -0.005 -0.021 0.020 AL 10.000 10.005 0.005 90091589000 10/05/90 AF
-0.6636 10.000 10.035 0.035 0.030 0.014 0.039 AL 10.000 10.035 0.035 l
90102096000 11/02/90 AF
-0.6636 10.000 10.029 0.029 -0.006 0.019 0.003 AL 10.000 10.029 0.029 90110399000 11/28/90 AF
-0.6636 10.000 10.036 0.036 0.007 0.031 0.015 AL 10.000 10.036 0.036 90120337000 12/26/90 AF
-0.6636 10.000 10.001 0.001 -0.035 -0.034 -0.009 AL 10.000 10.001 0.001 90122205000 01/26/91 AF
-0.6636 10.000 10.050 0.050 0.049 0.021 0.045 AL 10.000 10.000 0.000 91020047000 02/26/91 AF
-0.6636 10.000 9.973 -0.027 -0.027 -0.013 -0.012 AL 10.000 9.973 -0.027 91031354000 03/16/91 AF
-0.6636 10.000 10.033 0.033 0.060 0.082 0.054 AL 10.000 10.033 0.033 91040039000 04/15/91 AF
-0.6636 10.000 9.970 -0.030 -0.063 -0.030 -0.016 AL 10.000 10.003 0.003 91042019000 05/13/91 AF
-0.6636 10.000 9.998 -0.002 -0.005 -0.008 0.014 AL 10.000 9.998 -0.002 91052210000 06/01/91 AF
-0.6636 10.000 9.999 -0.001 0.001 -0.067 -0.034 AL 10.000 9.999 -0.001 91060734000 06/27/91 AF
-0.6636 10.000 9.971 -0.029 -0.028 -0.032 -0.035 AL 10.000 9.971 -0.029 91070553000 08/02/91 AF
-0.6636 10.000 9.996 -0.004 0.025 -0.002 -0.070 1
AL 10.000 9.996 -0.004 I
91081232000 08/23/91 AF
-0.6636 10.000 10.004 0.004 0.008 0.005 0.001
)
AL 10.000 10.004 0.004 91090319000 09/20/91 AF
-0.6636 10.000 9.998 -0.002 -0.006 0.027 0.000 AL 10.000 9.998 -0.002 91092129000 10/17/91 AF
-0.6636 10.000
- 9. 990 -0. 010
'J. 0 08 -0. 006 -0. 009 AL 10.000 9.990 -0.010 91102123000 11/14/91 AF
-0.6636 10.000 10.000 6.000 0.010 -0.004 0.029 AL 10.000 10.000 0.000 91112201000 12/16/91 AF
-0.6636 10.000 9.996 -0.004 -0.004 -0.002 0.000 AL 10.000 9.996 -0.004
NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET nEuN. CCN NO.
PACE or CCN Ct."VER$!ON:
Project or DCP/MMP WA Calc Wo.
l-"A-nD CCN NO.
CCN-Subject N1 Subchannel Gain Calibration As Found / As-teft Date Sheet No.
84 REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE 0
BOCKHORST 09/07/93 QUINN 09/10/93 REV IND Unit 3 Channel D Amplifier A-12 MonthlQuarter 150 Da Date Cal Cur.
Req'dCal Dat CD-Req " Drift " Drift " Drift 89010355000 01/08/89 AF
-0.6464 10.000 10.001 0.001 AL 10.000 10.001 0.001 89011221000 02/08/89 AF
-0.6464 10.000 10.001 0.001 0.000 AL 10.000 10.001 0.001 89021871000 03/07/89 AF
-0.6464 10.000 10.002 0.002 0.001 AL 10.000 10.002 0.002 89031320000 04/C6/89 AF
-0.6464 10.000 9.999 -0.001 -0.003 -0.002 AL 10.000 9.999 -0.001 89040978000 04/14/89 AF
-0.6464 10.000 9.999 -0.001 0.000 -0.002 AL 10.000 9.999 -0.001 89042179000 05/04/89 AF
-0.6464 10.000 10.002 0.002 0.003 0.000 0.001 AL 10.000 10.002 0.002 89051404000 06/03/89 AF
-0.6464 10.000 10.002 0.002 0.000 0.003 0.001 AL 10.000 10.002 0.002 89061042000 06/30/89 AF
-0.6464 10.000 10.001 0.001 -0.001 0.002 -0.001 AL 10.000 10.001 0.001 89070480000 07/07/89 AF
-0.6464 10.000 10.003 0.003 0.001 -0.000 0.003 AL 10.000 10.003 0.003 89071319000 07/27/89 AF
-0.6464 10.000 10.006 0.006 0.003 0.003 0.006 AL 10.000 10.006 0.006 89080382000 08/24/89 AF
-0.6464 10.000 10.005 0.005 -0.001 0.003 0.002 AL 10.000 10.005 0.005 89003637000 09/20/89 AF
-0.6464 10.000 10.009 0.009 0.004 0.006 0.006 AL 10.000 10.009 0.009 89092751000 10/16/89 AF
-0.6464 10.000 10.005 0.005 -0.004 -0.001 0.003 AL 10.000 10.005 0.005 89102727000 11/18/89 AF
-0.6464 10.000 10.006 0.006 0.001 0.001 0.003 AL 10.000 10.006 0.006 89112055000 12/15/89 AF
-0.6464 10.000 10.003 0.003 -0.003 -0.006 -0.003 AL 10.000 10.003 0.003 89122702000 01/12/90 AF
-0.6464 10.000 10.009 0.009 0.006 0.004 0.004 AL 10.000 10.009 0.009 90012246000 02/09/90 AF
-0.6464 10.000 10.004 0.004 -0.005 -0.002 -0.005 AL 10.000 10.004 0.004 90021281000 02/25/90 AF
-0.6464 10.000 10.000 0.000 -0.004 -0.003 -0.005 AL 10.000 10.000 0.000 90022609000 03/27/90 AF
-0.6464 10.000 10.005 0.005 0.005 -0.004 -0.001 AL 10.000 10.005 0.005 90041285000 04/23/90 AF
-0.6464 10.000 10.013 0.013 0.008 0.009 0.010 AL 10.000 10.013 0.013 90042318000 05/02/90 AF
-0.6464 10.000 10.009 0.009 -0.004 0.009 0.000 AL 10.000 10.009 0.009 90050296000 05/10/90 AF
-0.6464 10.000 10.000 0.008 -0.001 0.003 0.004 AL 10.000 10.008 0.008 90051543000 05/17/90 AF
-0.6464 10.000 10.009 0.009 0.001 -0.004 0.009 AL 10.000 10.009 0.009 90051994000 06/18/90 AF
-0.6464 10.000 10.008 0.008 -0.001 -0.001 0.003 AL 10.000 10.008 0.008 90062678000 07/09/90 AF
-0.6464 10.000 10.015 0.015 0.007 0.007 0.00'2 k
l NES&L DEPARTMENT ICCN N0/
CALCULATIONSHEET PREtiN. CCN NO.
Pace or j
CCN CONVER$10N:
Project or DCP/MMP W/A Calc No.
3-MA-00 CCN NO.
CCN-Subject WI subchannet Gain Calibration As Found / As-Left Data Sheet No.
85 l
REV ORIGINATOR DATE IRE DATE REV ORIGINATOR DATE IRE DATE O
BOCKHORsf 09/07/93 QUINN 09/10/93 REV IND J
AL 10.000 10.015 0.015 90071147000 07/17/90 AF
-0.6464 10.000 10.013 0.013 -0.002 0.004 0.004 AL 10.000 10.013 0.013 i
90072357000 08/09/90 AF
-0.6464 10.000 10.010 0.010 -0.003 0.002 0.002 AL 10.000 10.010 0.010 90081595000 09/07/90 AF
-0.6464 10.000 10.008 0.000 -0.002 -0.007 -0.001 AL 10.000 10.008 0.008 90091589000 10/05/90 AF
-0.6464 10.000 10.006 0.006 -0.002 -0.007 -0.002 AL 10.000 10.006 0.006 90102096000 11/02/90 AF
-0.G464 10.000 10.010 0.010 0.004 0.000 -0.005 AL 10.000 10.010 0.010 90110399000 11/28/90 AF
-0.6464 10.000 10.015 0.015 0.005 0.007 0.002 AL 10.000 10.015 0.015 90120337000 12/26/90 AF
-0.6464 10.000 10.005 0.005 -0.010 -0.001 -0.005
)
AL 10.000 10.005 0.005 90122205000 01/26/91 AF
-0.6464 10.000 10.010 0.010 0.005 0.000 0.002 AL 10.000 10.010 0.010 91020047000 02/26/91 AF
-0.6464 10.000 10.012 0.012 0.002 -0.003 0.006 AL 10.000 10.012 0.012 y
91031354000 03/16/91 AF
-0.6464 10.000 10.000 0.008 -0.004 0.003 -0.002 AL 10.000 10.008 0.008 91040039000 04/15/91 AF
-0.6464 10.000 10.009 0.009 0.001 -0.001 -0.006 AL 10.000 10.004 0.004 91042019000 05/13/91 AF
-0.6464 10.000 10.010 0.010 0.006 0.003 0.010 AL 10.000 10.010 0.010 91052210000 06/01/91 AF
-0.6464 10.000 10.010 0.010 0.000 0.007 0.005 AL 10.000 10.010 0.010 91060734000 06/27/91 AF
-0.6464 10.000 10.010 0.010 0.000 0.006 0.003 AL 10.000 10.010 0.010 91070553000 08/02/91 AF
-0.6464 10.000 10.009 0.009 -0.001 -0.001 0.006 AL 10.000 10.009 0.009 91081232000 08/23/91 AF
-0.6464 10.000 10.012 0.012 0.003 0.002 0.008 AL 10.000 10.012 0.012 91090319000 09/20/91 AF
-0.6464 10.000 10.011 0.011 -0.001 0.001 0.001 AL 10.000 10.011 0.011 91092129000 10/17/91 AF
-0.6464 10.000 10.001 0.001 -0.010 -0.008 -0.009 AL 10.000 10.001 0.001 j
91102123000 11/14/91 AF
-0.6464 10.000 10.010 0.010 0.009 -0.002 0.000 AL 10,000 10.010 0.010 91112201000 12/1G/91 AF
-0.6464 10.000 10.007 0.007 -0.003 -0.004 -0.002 AL 10.000 10.007 0.007 1