AO 74-33:on 740615,standby Diesel E-2 Failed.Caused by Scavenging Air Blower Seizing.Blower & Drive Gears Replaced. Filter & Intake Passages Cleaned & New Filters Installed
ML20086K482
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/25/1974
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Giambusso A
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19289B767 List:
References
AO-74-33, NUDOCS 8401270141
Download: ML20086K482 (3)


Text

- - - - _ _ - - - - - - - - - - - - - - - - - - - - - --- . - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - _ - - - _ - - ------ _ ---- _

,s

[g

, (. * '

L) U .. .

d .;. . ,

  • \

PHILADELPHIA ELECTRIC COMPANY \

9-li i 1 .\

2301 MARKET STREET $ Ik gt.;'r; ,. ,,*u1.j/k-h].y PHILADELPHI A. PA.19101

.\

e

.. ( M?

ew. ,

(21si e414ooo <Y/'

'S,pg- sk D,2 June 25, 1974 I

Mr. A Giambusso Deputy Director of Reactor Projects '9 0 2 r/ rr United States Atomic Energy Commission Directorate of Licensing Washington, DC 20545

Dear Mr. Giambusso:

Subject:

Abnormal Occurrence The following occurrence was reported to Mr. R. A. Feil, A.E.C. Reglen -

Regnhiory Q. .-t;.a.- Mfi c o or. . im o- 15, 1 0 **4 . Wri t ton notification was made to Mr. James P. O'Reilly, Region i Regulatory Operations Office on June 17, 1974. In accordance with Section 6.7.2.A of the Technical Specifications, Appendix A of DPR-44 for Unit 2 Peach Bottom Atomic Power Station, the following report is being submitted to the Directorate of Licensing as an Abnormal Occurrence.

Reference:

License Number DPR-44, Amendment Number 1 Technical Specification 3.9.A, 3.9.B, 3.5.F Report No.: 50-277-74-33 Report Date: June 25, 1974 i Occurrence Date: June 15, 1974 Faci 3.ty: Peach Bottom Atomic Power Station R.D. 1, Delta, Pennsylvania 17314 Identification of Occurrence:

Failure of the E-2 Standby Diesel.  ;

Conditions Prior to Occurrence:

vi I

,I The reactor was critical at 62s5 power. \f , _ , , ,

i U00*

8401270141 740625 DR ADOCK 05000277 00PV SMN')titjo01()N .

PDR

-~- - -,r --

r - .--z a n>, ,- ,- w r - - ~ - - ~ - - * - - - ,r

U V s,.

Mr. A. Giambusso June 25,' 1974 Page 2 Description of Occurrence:

During the loss of power test program for Peach Bottom Unit 3, the E-2 diesel failed to attain rated speed and voltage af ter receiving a simulated automatic start signal. This unit had been successfully started five times just prior to the failure.

Designation of Apparent Cause of Occurrence:

The scavenging air blower had seized causing extensive damage to the blower drive gears. The scavenging air blower supplies the combustion air to the cylinders during starting and light load operation.

Analysis of Occurrence:

Failure of the scavenging air blower resulted in an inoperable diesel generator. The other three diesel generators were being tested at the time of the E-2 failure. Therefore, their operability was immediately verified. Testing was immediately begun on the Core Spray, LPCI and HPSW systems. Since the operational status of the other three diesel generators was immediately known, this occurrence has minimal entnty e39 nit 3canen Corrective Action:

Following the occurrence, the scavenging air blower and drive gear. assembly were removed and inspected. The intake air filters were removed and the air passageway between the filters and the blowers in-spected. This inspection disclosed the presence of small weld beads.

An inspection of the intake filter supports indicated that the weld beads could have originated from these assemblies. It is, therefore, believed that the failure of the scavenging air blower resulted from foreign material (weld beads) entering the blower and causing it to seize. This in turn resulted in the failure of the drive gear assemblies.

The filter and intake passages were cleaned and new filters installed. The defective blower and drive gears were replaced. The diesel was returned to service and surveillance tested on June 17, 1974.

This work was accomplished under the direction of a manufacturer's representative.

An inspection of the intake air passages, the intake air filter assembly, and the blower drive gears was also performed on the other three diesel generators. Some weld beads were also found and i

t

.m. . s, O O o

} Mr. A. Giambusso

>- June 25,-.1974 Page 3 B

1 removed from the intake air passages on these units. The intake air filters were replaced and the units returned to service. All work on

the diesel generators was completed on June 21, 1974.

Failure Data:

This is the first diesel failure of this type.

i Very truly yours,

/ /

f M. J Cconey Ass - Gen'l Sup rintendent Generation Division 3

cc: Mr. J. P. O'Reilly Director, Region 1 United States Atomic Energy Commission 631 Park Avenue

. - '.ing cf Pru::::i::,, PA 1904e i

1 1

i 4

f i

P i

1

?

p y y + .--yqw. w s ee,-- m-. ,e,s y g g g g9.r*yg--w-g-W++-g-4 y 9- . y 3pny---=~#*+--- y M1maeweum

  • er*-y"'u aw e-e-- --wg- p+-,- w-------we gwyg g-pe.