ML20086K454

From kanterella
Jump to navigation Jump to search
Telecopy AO 74-36:on 740702,improper Valving Found of Reactor High Pressure Scram Switch & Drywell High Pressure Scram Switch.Caused by Technician Error.Technicians Advised of Importance of Verifying Proper Valve Lineup
ML20086K454
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/03/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086K451 List:
References
AO-74-36, NUDOCS 8401270121
Download: ML20086K454 (1)


Text

-

o- . kg Q '

July 3, 1974 4

Kr. James P. O'Reilly, ector, - O .

United States Atocic Pnergy Cemiccion Directorate of Regulatory Operations -

631 Park Avenue -

King of Prussia. Pennsylvania 194Cf -

Subject:

Abnor-Al Occurrence 2f+-Hour Notification Confir:ein6 R. S. Pleiecheann'a phone convercation with Mr. Tom Shedlovaky A.E.C. Region 1 Regulatory Operatiene Office on July 3,1974 Licence Nu=ber DPR 44, Amendmen't Number 1  :

Reference:

Technical Specifi n tion Table 3 1.1 Report No.: 50-277-74-36 Report Date: July 3.197!+

Occurrence Date July 2, 1974 Facility: Peach Bottca Atomic Power Station R.D, 1, Delta, Pennsylvania 1731 ca tor HiEh Preasure Gcras evitch and a Drysell i

per v lv n5 High Precaure Scran entch.

. Conditions Prior to Occurrence: i Reactor at 99% power. .-

> c Deceription of Occur'rence: .;

Daring routine instrue.cnt curveinanced testing, ed out of PS-2-2-3-55c cervice, Ic.ediate (acactor High -

oun _:

Preocure Scram avt tch) was t ted instrumento revealed that another it h P 5-12k ryv 8 Pre ** SC #^*) "8 "" ,

Designation of Apparent Cause of Occurrence:The cauce for these occurrence instrumento to service cubcequent to performing surveillance tents.

Analycia of Occurrence:

Each of thece ovitches is part of a ceparate one-out-of-two-tvice ecran logic, and the defcating of any one cvitch in either logic would not haveTh defeated the safety systen logic.

cafety i=plications.  :

4 Corrective Action:

All other surveilbnce tested instrumente were checked for proper valve lineup i-=cdiately. The instrrent technicians were advised of the importance af verifying preper valve line-up followins ca$> tent. - ~  ?

Failure Dita: ,

This is the firct, occurrence of thic type on instro btli hoverk by ~

~

1i

surveillance tenting.

L C ll Very truly yourj\

5 Ii / ,D 9'b h N' r ~

8401270121 740712 PDR ADOCK 05000277 S

f 7

N h'Q >

q PDR ,

- tn N

W. T. Ullrich 5