Telecopy AO 74-36:on 740702,improper Valving Found of Reactor High Pressure Scram Switch & Drywell High Pressure Scram Switch.Caused by Technician Error.Technicians Advised of Importance of Verifying Proper Valve Lineup
ML20086K454
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/03/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086K451 List:
References
AO-74-36, NUDOCS 8401270121
Download: ML20086K454 (1)


Text

. kg Q July 3, 1974 o-O 4

Kr. James P. O'Reilly,

ector, United States Atocic Pnergy Cemiccion Directorate of Regulatory Operations 631 Park Avenue King of Prussia. Pennsylvania 194Cf Abnor-Al Occurrence 2f+-Hour Notification

Subject:

R. S. Pleiecheann'a phone convercation with Mr. Tom Shedlovaky Confir:ein6 A.E.C. Region 1 Regulatory Operatiene Office on July 3,1974 Licence Nu=ber DPR 44, Amendmen't Number 1

Reference:

Technical Specifi n tion Table 3 1.1 Report No.:

50-277-74-36 Report Date:

July 3.197!+

Occurrence Date July 2, 1974 Peach Bottca Atomic Power Station Facility:

R.D, 1, Delta, Pennsylvania 1731 i

per v lv n5 ca tor HiEh Preasure Gcras evitch and a Drysell High Precaure Scran entch.

. Conditions Prior to Occurrence:

i Reactor at 99% power.

c Deceription of Occur'rence:

Daring routine instrue.cnt curveinance testing, PS-2-2-3-55c (acactor High d ed out of cervice, Ic.ediate Preocure Scram avt tch) was oun ted instrumento revealed that another t

Pre ** SC #^*) "8 ""

P 5-12k ryv 8

it h Designation of Apparent Cause of Occurrence:The cauce for these occurrence instrumento to service cubcequent to performing surveillance tents.

Analycia of Occurrence:

Each of thece ovitches is part of a ceparate one-out-of-two-tvice ecran logic, and the defcating of any one cvitch in either logic would not haveTh defeated the safety systen logic.

cafety i=plications.

Corrective Action:

All other surveilbnce tested instrumente were checked for proper valve 4

The instrrent technicians were advised of the lineup i-=cdiately.

importance af verifying preper valve line-up followins ca$> tent.

?

~

Failure Dita:

on instro btli hoverk by This is the firct, occurrence of thic type

~

1i

~

surveillance tenting.

L C

ll 5

h Very truly yourj\\

h'Q

~

/,D 9'b N'

r Ii 8401270121 740712 q

f PDR ADOCK 05000277 N

S PDR 7

tn N

W. T. Ullrich 5