AO 75-15:on 750210,setpoint Shift Found on Recirculation Pump DPIS-2-2-138A.Caused by Setpoint Shift.Cam Follower Replaced & Properly Aligned.Switch Recalibr & Checked
ML20086K381
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/20/1975
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Giambusso A
Office of Nuclear Reactor Regulation
Shared Package
ML20086K384 List:
References
AO-75-15, NUDOCS 8401270056
Download: ML20086K381 (2)


Text

r i O O n&cs- , .

PHILADELPHIA ELECTRIC COMPANY ^J.' -

2301 MARKET STREET 8p"Holy ^g , .

PHILADELPHIA. PA.19101 \as;w. A7 a '> o,ftr hp 215 841-4ooo 9 4. 4. ;g b . rpl/

February 20,1975 Mr. A. Giambusso Director Division of Reactor Licensing Office of Nuclear Reactor Regulations United States Nuclear Regulatory Cce:nission Washington, D.C. 20555

Dear Mr. Gianbusso:

Subject:

Abnor.nal Occurrence The follo: ring occurrence was reported to Mr. Valt Baunack, Office of Inspection and Enfortcruent, Region 1, United States Nuclear Regulatory Cc: mission on February -11,1975. Written notification was made to Mr. James P. O'Reilly, Office of Inspection and Enforcetent, Region 1, United States Nuclear Regulatory Co: mission on February 11, In accordance with Section 6.7 2.A of the Technical Specifications, 1975 Appendix A of DPR-hh for Unit 2 Peach Bottom Atomic Power Station, the following report is being submitted to the Directorate of Reactor Licensing as an Abnomal Occurrence.

Reference:

License Number DPR-hh Technical Specification

Reference:

Table 3 2.B Report No.: 50-277-75-15 Report Date: February 20, 1975 Occurrence Date: February 10,1975 Facility: Peach Bottom Atcciic Power Station R.D. 1, Delta, Pennsylvania 1731h g _ Identification of 0::currence:

Setpoint shift on dPIS-2-2-138A, Recire. Pump AP which

, initiates LPCI loop selection logic.

2092 Conditions Prior to Occurrence:

Unit 2 at 90% power.

8401270056 750220 PDR ADOCK 05000277 s PDR

.a

jFebmary P0,1975 '

Pega 2 "' l f_ . O Description of Gecurrence:

O .

During mutino instrument surveillance testing, dPIS-2-2-138A was found to trip at 0 9 paid. The Technical Specification limit is 2 paid 11.

h* nation of Aeparent Cause of Occurrence:

Setpoint shift.

Analysis of Occurrence:

This minor setpoint shift has minimal safeyf implications since it is part of a one-of-two-twice logic and is also redundant in the other LPCI systet.

  • Corrective Action: _

'Ihe cem follower was found to be defective. It was replaced, ,

and properly aligned. The switch was recalibrated and check for proper calibration per the applicable surveillance test.

Failure Data:

This is the first failure of this type on switches in this serviCo.

Verf truly yours,

/^

M. Cooney As t Gen'1 Supe intendent Generation Division