_
o O
PHILADELPHIA ELECTRIC COMPANY
- g.
2301 M ARKET STR"ET
< k, <
i
< CZY '
j s
PHILADELPHIA, t'A.19101
[
c4 gm 7
121 m e 41-4 00 0
,,, gut
]
f U.
, a w(
'Q E
- (t
/
% b #yfky' b'
October 14, 1974 Mr. A. Giambusso Deputy Director of Reactor Projects United States Atomic Energy Cormiission Directorate of Licensing Washington, DC 20545
Dear Mr. Giambusso:
Subject:
Abnormal Occurrence The following occurrence was reported to Mr. Walt Bounack, A.E.C. Region 1 Regulatory Operations Office on October 4,1974.
i Written notification was made to Mr. James P. O'Reilly, Region I Regu-3 latory Operations Office on October 7,1974.
In accordance with Section 6.7.2.A of the Technical Specifications, Appendix A of OPR-56 for Unit 3 Peach Bottom Atomic Power Station, the following report is being submitted to the Directorate of Licensing as an Abnormal Occurrence:
q
Reference:
License Number DPR-56 Technical Specification Reference Table 3 2.B j
Report No.:
50-278-74-12 i
Report Date:
October 14, 1974 e
[d Occurrence Date:
October 4,1974 Facility:
Peach Bottom Atomic Power Station R.D. 1, Delta, Pennsylvania 17314 Identification of Occurrence:
1 Setpoint drif t on the RCIC turbine high reactor water level k
in a direction less conservative than specified in the Technical sensor
~
h Speci ficati ons.
4 Conditions Prior to Occurrence:
n Unit 3 Start-Up, reactor critical, reactor pressure less than k
200 ps i.
l fsf g401230616 741014 QDRADOCK 0500027J 1076/.-
k CW'Y WWf REGION / A- (
a-.
-}
Mr. A. Giambusso p
p) age 2 October 14, 1974 V
g_,
Description of Occurrence:
During.a routine instrument calibration surveillance test, the setpoint of one of the RCIC turbine high reactor water level sensors, LIS-3-2-3-101A, was found to have drifted outside the limit called for in the Technical Specifications. The prescribed setpoint for this de-vice is145". The device was found to trip at 45.1".
Designation of Apparent Cause of Occurrence:
The wheel on the cam follower was found to be binding, requir-ing greater motion on the cam to trip the switch.
Analysis of Occurrence:
Since the setpoint was minor, and would not have prevented the sensor from providing a high level signal to the RCIC turbine trip logic, this occurrence has minimal safety implications.
Corrective Action:
The cam follower assembly was replaced; setpoint adjusted and checked for repeatability; and the instrument functionally checked per the applicable surveillance test prior to returning it to service.
L Failure Data:
These dif ferential pressure switches have required frequent recalibrations to correct setpoint shifts.
Since the start-up of Unit 2, setpoint shif ts cn the instruments in this service have required re-calibration on 24 occasions.
Shif ts to values in excess of Technical er Specification limits occurred six tines including this occurrence. - Most of these deviations were only slightly beyond the' required setpoints and did not cons.titute a safety hazard.
Very truly yours,
/
. J. Cooney s
.A
't Gen't Superintendent d
Generation Division cc:
Mr. J. P. O'Reilly Director, Region 1 United States Atomic Energy ' Commission King of Prussia, PA