ML20086J111
| ML20086J111 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/31/1974 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20086J115 | List: |
| References | |
| AO-74-39, NUDOCS 8401230187 | |
| Download: ML20086J111 (2) | |
Text
--
~
O S
PHILADELPHIA ELECTRIC COMPANY hA
...-'Il /
2301 MARKET STREET gs
[.
I f.-.(d(k'S'f..-
PHILADELPHIA. PA.19101 e,
saisi e4i-4ooo
~.
i
.,,o-j.
December 31, 1974 6:s/
x
.,1 sj I;.- -Q W
'O Hr. A. Giambusso Deputy Director of Reactor Projects United States Atomic Energy Commission Directorate of Licensing Washington, D.C.
20545
Dear Mr. Giambusso:
Subject:
Abnormal Occurrence The following occurrence was reported to Mr. Walt Baunack, A.E.C. Region 1 Regulatory Operations Of fice on December 21, 1974.
L Written notification was made to Mr. James P. O'Reilly, Region 1 Regulatory Operations Office on December 23, 1974 In accordance with Section 6.7.2.A of the Technical Speci fications, Appendix A of DPR-56 for Uni t 3 Peach Bottom Atomic Power Station, the following report is being submi tted to the Di rectorate of Licensing as an Abnormal Occurrence.
F
Reference:
License Number DPR-56 Technical Specification
Reference:
3.7.0 c
Report No.:
50-278-74-39 Report Date:
December 31, 1974 Occurrence Date: December 21, 1974 Faci li ty:
Peach Bottom Atomic Power Station R.D. #1, Delta, Pennsylvania 17314 Identification of Occurrence:
Drywell equipment drain sump isolation valve A0-3-20-74
{
failed to close on a PCIS isolation.
Conditions Prior to Occurrence:
Unit 3 operating at 3182 MWT, 96.6% power.
Startup Test 27, Turbine Trip had just been performed causing reactor scram and group 2 and 3 PCIS isolation.
Description of Occurrence:
7 y
During the PCIS isolation, A0-3-20-94 failed to isolate.
C.
The valve also failed to isolate on a manual closure signal.
/'
B401230187 741231 g
PDR ADOCK 05000278 S
PDR y
COPY SPMr REGM
<W
F
~
O O
Mr. A. Giambusso December 31, 1974 Page 2 Designation of Apparent Cause of Occurrence:
The solenoid valve which de-energizes to bleed the air off the diaphram stuck in the energized position preventing valve closure.
Analysis of Occurrence:
The other isolation valve in this line, A0-3-20-95, did close to isolate the line. Therefore, there is minimal safety im-pli ca tion.
Corrective Action:
The solenoid valve was rebuilt and satisfactory operation was veri fied wi thin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of the occurrence.
Failure Data:
Similar occurrences were reported as Abnormal Occurrence Report Numbers A0-50-277-74-7 and A0-50-278-74-26.
Very truly yours, h-f>LC M. J. Cooney Asst. Gent. Supt.
Genera tion Division cc: Mr. James P. O'Reilly Director, Region 1 l-United States Atomic Energy Commission -
631 Park Avenue King of Prussia, PA
'19406 l
~