ML20086J068

From kanterella
Jump to navigation Jump to search
Telecopy AO 75-6:on 750121,RSCS 30% Rated Power Interlock PS-3-3-250A Failed.Caused by Minor Leakage from Bourbon Tube Resulting in Buildup of Moisture in Switch Case.Switch Assembly Replaced,Calibr & Checked
ML20086J068
Person / Time
Site: Peach Bottom 
Issue date: 01/22/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J066 List:
References
AO-75-6, NUDOCS 8401230093
Download: ML20086J068 (1)


Text

% 6 PL $ $. U. y -WWC6d. 'W.

O

-it he-a Peach Bottour Atomic Power Station Delta. Pennsylvania 17314 January 22. 1975 Mr. James P. O'Reilly Director United States Atomic Energy Cossaission Directorate of Regulatory Operations 631 Park Avenue King Of Prussia, Pennsylvania 19406

Subject:

Abnormal Occurrence 24-Hour Notification Csafirming R. S. Fleiscimann's phone conversation with Tom Shedlowsky, A.E.C. Region 1 Regulatory Operations Of fice on January 22. 1975.

Reference:

License Number DPR-56 Technical Specification

Reference:

3.3.B.3.a c

ss'??// s\\

i a ~N) h, Report No.;

S0-278-75-6

,g[yp,

.a Report Date:

January 22, 1975

[

Occurrence Date: January 21. 1975 u/.s O, //'/,D--k N

Fccility:

Peach Bottom Atonic Power Station 2

@tf R.D. 1. Delta, Pennsylvania 17314 ID 4,'?

.. ' A'

~i c:

.,L.

. ~6 47,'f

'f,Cl.

Identification of Occurrence:

q kY.

Y Failure of P5-3-3-250A, RSCS 30% rated power interlockE cedician. Prine en (k currence:

Unit 3 shutdown.

Description of Occurrence:

During a routine instru: ment surveillance test, PS-3-3-250A was found to have suffered corrosion damage which rendered it inoperable.

The corrosion resulted from a buildup of noisture in the switch housing.

l Designation of Apparent Cause of Occurrence:

Minor leakage f ron the bourdon tube resulting in a building of moisture in the switch case.

Analysis of Occurrence:

accause either the PS-250A or PS-2503 switch servea independently to arm ths RSCG -

lielov. 30% rated power, the failure.of only one of these evitches han einisal safet; implications.

Corrective Action:

The entire switch assembly was replaced in kind, calibrated, and checked in accordance with the applicable surveillance test.

Failure Data:

None previous.

g123OO93750131 ADOCK 05000278 g

PDR Very truly yours, 9 13 W. T. Ullrich, Superin*,endent Peach Bottom Atomic Power Station

- - ' * - * - +

  • m.-.-...

.,,