AO 75-7:on 750123,mode Switch Failed to Consistently Initaite Full Scram Signal When Moved to Shutdown Position. Caused by Intermittent Switch Contact Function.Mode Switch Replaced
ML20086J059
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/02/1975
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
Shared Package
ML20086J056 List:
References
AO-75-7, NUDOCS 8401230080
Download: ML20086J059 (2)


Text

n s.-

~.. -

d PHILADELPHIA ELECTRIC COMPANY 1

2301 MARKET STREET PHILADELPHIA. PA.19101 (2151 841-4o00 February 2, 1975 Mr. A. Giambusso Director, Division of Reactor Licensing

.0f fice of Nuclear Reactor Regulations United States Nuclear Regulatory Conmission Washington, DC 20555

Dear Mr. Giambusso:

Subject:

Abnormal Occurrence The following occurrence was reported to Mr. Tom Shedlowsky, NRC Region i Office of Inspection and Enforcement on January 24, 1975 Written notification was made to Mr. James P. O'Reilly, Region 1 Office of Inspection and Enforcement on January 24, 1975 In accord-ance with Section 6.7.2.A of the Technical Specifications, Appendix A of DPR-56 for Unit 3 Peach Rottom Atomic Power Station, the following report is oeing submitted to the Directorate of Reactor Licensing as an Abnormal Occurrence.

Reference:

License Number DPR-56 Technical Specification

Reference:

Table 3 1.1 Report No.:

50-278-75-7 Report Date:

February 2, 1975 Occurrence Date:

January 23, 1975 Facility:

Peach Bottom Atomic Power Station R.D. #1, Del ta, Pennsy lvania 17314 Identification of Occurrence:

Failure of the mode switch to consistently initiate a full scram signal when moved to the shutdown position.

Conditions Prior to Occurrence:

Unit 3 shutdc,wn.

Description of Occurrence:

Af ter insertion of all rods and placement of the mode switch in SHUTDOWN, the mode switch was placed in the REFUEL position to enable the movement of a single control rod. The mode switch failed to allow the motion of a control rod and the switch was then cycled to the 8401230000 750207 PDR ADOCK 0500027 -

S

)

0 0

.~

Mr. A. Giambusso February 2,1975 Page 2 S'HUTDOWN position and back to the REFUEL position to clear the problem.

This time the mode switch failed to initiate a full scram when moved to the SHUTDOWN position.

Designation of Apparent Cause of Occurrence:

Intermittent switch contact function.

Analysis of Occurrence:

Because the reactor was shutdown with all control rods in-serted, and because the Manual Scram System was operable, the failure of the full scram capability of the mode switch in the SHUTDOWN posi-tion has minimal safety implications.

Corrective Action:

The mode switch was cy: led many times between SHUTDOWN and REFUEL, and it intermittently failed to initiate full scrams. The mode switch was replaced.

Failure Data:

None.

Very truly yours, M.

. Cooney As t Gen' t Superintendent Generation Division cc:

Mr. J. P. O'Reilly, Director Office of Inspection and Enforcement Region i United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406