b%
(~')
Gs s
/
PHILADi3.FUIA FTn M IC CD'IPAUT Peach Bottou Atocic Power Station Delta. Pennsylvenia
'17314 April 29.1975 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement
- A 4 d s'"4 Un States Nuclear Regulatcry Cossrission h
G31 Park Avenue Kin 3 of Fruosia. Festnsylvenia 19406 Subicct:
Abnorns1 Ocet-rrence 24-Ecur Notification _
u1y _ ttt 1 et ch's chno,.,-arv*-* n-f e.13st1*lLLU1 * """"ack _Rc*fam 1
.Aygding
- Am.-1 -<: w~m Gia* *"-% sic.te: s,_Cerisdian eta"yil_29.1915
_ _ _ ww-m_
. =,
n:m_ mumm _m. _ me __~_w_-
_..m_____....--
~ F5ferenc I.1[en$ tiNNAM e M TFZ 4 F " " -
- * -- ~ ~ "
~ ~ -
Technical Specification
Reference:
_3.9.5.3
- limpart i.a. t sU-177-r75-31 d 273-75-25 m,nost n,-
mar <v so_ ic75 E*iademtere415es'WdensetEl>34*S$?P -=--
W-
=GiA
- =m:56 Facility:
Peach Botton Atomic Power Station R.D.1. Delta. Per*.sylvania 17314 Identification of Occurrence:
Failure of the F,-2 diesel geacrator.
Conditions Prior to Cecurrenca:
Unit 2 at 92Z ymerr. Unit 3 at 100%.
Description of Occurrence:
The E-2 diesel generator failed to flash its fiald during a startins sequeces, resultima in the insbility of the severator to susemin a :y load.
Designation of Apparest Cause of Occurrence:
A stu11 particle of dirt or other foreign unterisi is ba11esed to have inter-fared with the field flashing logic relays. The contacts were manually cycled a.ad the diesel ganarator was restarted successfully.
Analysis of Occurrence:
The safety implications of this occurrence ars =inimal beesuna this occurrence had no offect on the remaining diecals and one diasal is considered redundant.
In addician, the amount of time that the diesel was inoperable was less thzs an The martusi cycling of the field f1==hing relays was followed fmediately by hour.
two satinfactory starts.
Corrective Actica:
The masual cycling of the field flashie w relays apparently removed thm suspect p.artir.le of foreign material because the correct logic cequence was wirnessed during subsequent starts.
Failate Dsta:
No previous failurus of this type.
Very truly yours.
N?M$ 8 U. T Ullrich. Superintendent Pescis Bottem Ars==ic Foner Station hK05000g77 07 750508 S
-,