Telecopy AO 75-52:on 750819,reactor Bldg 3A Exhaust Radiation Monitor RIS-3-17-452A High Radiation Trip Setpoint Exceeded Tech Spec Limits.Caused by Setpoint Drift.Setpoint Adjusted,Calibr Checked & Test Successfully Rerun
ML20086H600
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/20/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20086H598 List:
References
A-75-52, A0-75-52, NUDOCS 8401180148
Download: ML20086H600 (1)


Text

[.

s

/

PHILA~ELTRA E*,ECTRIO CC"PANY /

Peach s o *. t c = Atenie Power Station I

Oedta, Fe.asylvants e

17330

,u ; -.: ~ ~ -

    • C;;- ' ~ ~ ~ -;_;sy,,

,.W

4..e,-

~ ~ ' ^ ^ ^ * * ~

~,

Unitei E rte: A enic E ercy Cennic-ion

/ /

' 2CL.'

/

Directorate of Regulat ery Operttions

/Jl,y,. M M h W (,

j 631 Pa ri Ayer:ue e,

h King of Prussia, Pesnsylvania 19kO6 Sutfect:

Abnerrsi Seeurtence ?L-Ecur Notificat'en

- " ~ * * ~ " ~

  • Co= fir =ing W.

T. Ullrich's phone eenversation with Mr. Walt launack, Region 1, 'Jnited St stes Nucicar Regulatory Oc==is.sica on August 20 1975.

Reference:

  • icense Nu=ter OPR-56 Technical Specification

Reference:

3.2.D Report Eo.:

50-278-75-52 Report Date:

August 20 1975 Occurrence Date:.

August 19, 1975 Facility:

Peach 3ctten Ate =ie Power Station R.D.

1, Delta, Pennsylvania 1731h Identification of Occurrence:

~

3A Reactor Building Exhaus.t Rad monitor.(RIS-3-1T h52A) High Badiation trip set point exceeded Technical Specification limits.

" CoEditions Prior to Occurrence:

Unit 3 was operating at 555 power.

Description of Occurrence.

While performing ST k.2 - Reactor Building Exhaust Radiation =onitor functional test, it was discovered that the 3A Radiation nonitor as found High Radiation trip setpoint was 2h cr/hr.

The Technical Specification limit is ( 16 nr/hr.

Designation of Apparent Cause of Occurrence:

Instrument s etpoint -dF;l ft.

Analysis of Occurrence:

The device is one of four arranged in a one-out-of-two twice logic (which initiates a Group III isolation on reactor zone ventilation exhaust high radiation) such that the high trip setpoint would not have prevented the isolation fro = actuating at the correct.pcint.

For this reason, and.the fact that the device was still functional, the ssfety implication of this cecurrence is nininal.

Corrective Action:

The setpoint was adj ust ed. the calibration checked, a=d the surveillance test was successfully rerun on the 3A nonitor.

Failure Data:

No previcus failures of this type.

Very truly yours,

~

sn f,

,, ff % *w W.

T. Ullrich. S ur. o r i st e n te:-

Peach 2cttd Ato=tc

.:ver Station rjs/bic /gfd 8401180148 750829 PDR ADOCK 05000278 g