ML20086H579
| ML20086H579 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/03/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086H578 | List: |
| References | |
| AO-75-55, NUDOCS 8401180039 | |
| Download: ML20086H579 (1) | |
Text
1 4
v
~
. ~..
l
- g..
4
[
Ph'ILADELPHIA ELECTRIC CCMPANY t
Peach Lo'.to= Atc=ic Power Station Delta,. Pennsylvania l
173M+
September 3, 1.975-Mr. J a=e s P. O'Reilly, Director Office of Inspection and Enforcement 11
- ed States 5.: clear Regulatory Connission 631 Part Avenue King of' Prussia, Pennsylvania 19h06
Subject:
Abnormal Occur: ance 24-Hour Motification Confirming R.
S.
Pleischmann's phone conversation with Mr. Walter Baunack, Region 1. United States suelesr Ber.ulatory Com=ission an September 3. 1975c Refereree:
License Jusber DPR-56 Technical Specification'
Reference:
3.7.D.1 Report No.:
50-278-75-55 Report'Date:
September 3, 1975 Occurrence Date:
September 2, 1975 Facility:
Peach Botto= Atomic Power Station R.D. 1 Delta, Pennsylvania 1731h Identification of Occurrence:
The dryvell floor drain inboard isolation valve (AO-3-20-82) failed to close 'Euring surveillance testing.
C or.di tions Prior to Occurrence:
Hot standby.
Description of Occurrence:
During the perfor ance of a surveillance test,-AO-3-20-82 failed to close when given an isolation signal.
Designation of Apparent Cause of Occurrence:
Under investigation.
Analysis of Occurrence:
The safety in;11 cations 'of this failure are minimal because the outboard isolation valve did cloce from the isolation signal.
~
Corrective Action:
)
The outboard isolation valve was left in the closed position.
Failure Data:
AO-50-273-TI.-26 saa Ao-So-277-TA-T-l Very tru h yours.
- =. - -. ~..
I l
W. T. Ullrich, Superintendent i
' Peach Boston Atomie Power Station s
f.
I s.
s s
s, y
1.
s i
.a L;
s B401180039 750903 PDR ADOCK 05000278 s
/-
3 5
J0PY SENT REGION 7
' -