ML20086H007
| ML20086H007 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/18/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086H006 | List: |
| References | |
| AO-75-13, NUDOCS 8401130241 | |
| Download: ML20086H007 (1) | |
Text
.
m L
q e
/k Ensa D E.t. / r' E f PitILADELPHIA ELEC17 TIC COMPMW
_ l p.
4 Peach Dottom Atonic Power Station i
Delta, Pennnylvania
'h M WM h
17314 February 18, 1975 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region i United States Nucicar Regulatory Co:s:lission 631 Park Avenue King of Prussia, Pennsylvania 19406 Subicer:
_Abnorr si Occurrence 24-IIour Notification W
Confir:2ing R. S. Fleischmann's phone conversation with Mr. Walt Bsunack, Region 1 United States Nuclear Regulatory Coc::nission on February 17, 1975.
-.y
Reference:
Licence Number DPR-56 Technical Specification
Reference:
3.4.B.1 m
R part No -
90-273-75-13 Report Date:
February 17, 1975 Occurrence Dato:
February 16, 1975 Facility:
Pecch Bottem Atonic Power Station R.D. 1. Dalta. Fennoyivania 17314 7
2 Identification of Occurrence:
3A Standby Liquid Control Pump crippcd.
.; g Conditions Prior to Occurrence:
Unit 3 at approxinately 99.8%.
(
Description of Occurrence:
While perfor..ing the Stendby Liquid Control Pucp Functions 1 Test, ST 6.1. the "3A" pump failed to start on two attempts; in each case the circuit breaker tripped. Af ter nanually resetting the breaker the third tire, the pu::rp ran satisfactorily.
?_
Desiguccion of Apparent Cause of Occurrence:
The cause for these circuit breaker trippings is under investigation.
Analysis of Occurrence
- 1 Tho safety significance of this occrrrence is minical since the 3D pu=p operated antisfectorily several clinutes before the 3A pu=g tripped. Further, within s:inutes af ter the initial tripping the 3A was operated satisfactorily.
Corrective Action:
Subcoquent to the trippins. the spu:p vcs started five tittec; circuit brecker operation was monitored. Each start was successful. Investigation is continuing.
Failuro Dats:
None.
Very truly youra, fYhW&#
^
W. T. Ullrich, Superintendent Peach Lottom Atomic Power Station 1 --