ML20086H004

From kanterella
Jump to navigation Jump to search
AO 75-13:on 750216,standby Liquid Control Pump 3A Tripped. Caused by One Phase Magnetic Trip Device Adjusted Marginally W/Respect to Normal Starting Current of Pump.All Devices on Breaker Recalibr to Accommodate Pum Starting Current
ML20086H004
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/26/1975
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086H006 List:
References
AO-75-13, NUDOCS 8401130236
Download: ML20086H004 (2)


Text

_ _ _.

O O

l PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STFtEET PHILADELPHIA. PA.19101 (2151841-4000 February 26,1975

.4

.,U

. ~

i

_Q v

Mr. A. Gianbusso, Director

'Mr T

Division of Reactor Licensing

k< *, /) k Office of Nuclear Reactor Regulations ej;,s j;

United States Nuclear Regulatory Comission

.x.-

O.p

  1. d

^ G/

Washington, D.C.

20$$$

y.

Dear Mr. Gianbusso:

[

Subject:

Abnormal Occurrence The following occurrence was reported to Mr. Walt Baunack, Office of Incpection and Enforecnent, Region 1, United States ReEulatory Cennission on February 17,1975 Written notification was made to Mr. Jance P, O',Reilly, Office of Inspection and Fnforecacnt, Region 1, un4 + M m +on n,,1no

% -,1 o n.,

c-4. e < n, n,

ww,,,y,,,17, 197g, In accordance with Section 6.7.2. A of the Tcchnical Specifications, Appendix A of DPR-56 for Unit 3 Peach Bottom. Atenic Pcwcr Station, the following report is being subnitted to the Directorate of Reactor Licensing as zn Abnormal Occurrence:

Referenec:

License Nunber DPR-56 Technical Specification

Reference:

3.h.B.1 Rcport No.:

50-278-75-13 Report Date:

February 26, 1975 Occurrcnce Date:

February 16, 1975 Facility:

Peach Bottem Ato.ic Power Station R.D.1, Delta, Pennsylvania 1731h Identification of Occurrence:

3A Standby Licuid Control Punp tripped.

C_onditions Prior to Occurrence:

Il@

<h / 0 p

e Unit 3 at approxinately 99.8%.

l' 8401130236 750226 2338 PDR ADOCK 05000270 S

PDR gy gr REGION

Mr. A. Gianbusto February 26, 1975 Q

Q Page 2 Descr.intion of Occurrence:

Maile perfoming the Standby Liquid Control Pump Functional Test, ST 6.1, the "3A" punp failed to start on two attmpts; in each case the circuit breaker tripped. After nanually resetting the breaker the third time, the pump ran satisfactorily.

Designation of Arn7 rent Cause of Occurrence:

Retoval of the breaker and calibration in a test facility indicated that one phase nagnetic trip device nas adjusted narginally uith respect to the nomal starting current of the pump.

Analysis of Occurrence:

Tho safety significance of this occurrence is nininal since the 33 pump operated satisfactorily several nin.ites before the 3A pump tripped. Further, vii.hin ninutes after the initial tripping the 3A was operated satisfactorily.

Corrective Action:

o All three phase nacnetic trio devices on the breaker were recalibrated to accomtodate nomal pump starting current.

Failure DcA:

None.

Very truly ycurs, M. J Cocncy Ass t Genil Superintendent Generation Division ec:

Mr. J. P. O'Reilly Dircutor Office of Inspection and Enforcencnt Regien 1 Unit <.d States Unclear Regulatory Con:ission 631 Park Avenue King of Pntssin, PA 19h06

..,...a