ML20086G947

From kanterella
Jump to navigation Jump to search
Telecopy AO 75-20:on 750408,level Switch LS-5222 Failed to Operate RHR Loop B High Point Vent SV-5222.Caused by Broken Wire on LS-5222.Wiring Repaired & Level Switch Successfully Tested
ML20086G947
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/09/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086G946 List:
References
AO-75-20, NUDOCS 8401130077
Download: ML20086G947 (1)


Text

{}

\\)

y

/

PHIiADELPHIA D.TCTRIC COMPANY Peach Botton Atomic Power Statica Delta, Pennsylvania 17314 April 9, 1975 tfr. Jasws P. O'Reilly, Director Of fice of Inspection and Enforcement 4

  1. t.

En t States Nuclear Regulatory Cc d ssion gg 42/41;42., 4 631 Park Avenue King of Prussia, Pennsylvania 19406

Subject:

Abnornal occurrence _24-!!our Notification Confirming V. T. U11 rich's phone conversation with }tr. Valt Launack, Region I United States Nuclear Regulatory Cc=sission, on April 9,1975.'

Rcference:

License Nuaber DTR-56

.cehnteel-e; c eif feceies -u f aa.ce:- 4.5.G -

Report No.:

50-278-75-20 Report Date:

April 9, 1975 Occurrence Date:

April 8, 1975 Facility:

Peach Lotton Atomic Power Station E.D. 1 Delta, Pennsylvania 17314 Identification of Occurrence:

Pailure of LS-5222 to operate SV-5222 (RER loop "B" high point veut on lov accumstator level).

Conditions Prior to Occurrence:

Unit 3 cpe) ating at approx 1nately COI.

Descriptics of Occurrence:

Lair.u a routine instrur:ent surveillance test, the svitch function of LS-5222 which picks up SV-5222 to cpen the RER Loop "B" high point vent failed to cperate.

Th* alarm function of the switch did. operate properly.

Designation of Apparent Cause of Occurrence:

Eroken wire on LS-5222.

Analysis of Occurrence:

Since the FTA loop was full prior to the test, the low acct::mulator level alatT2 was proven functional, exd the operator vestid respend to the lov level alarn to ensure that the systata was t:.aintained full, the safety implications of this failure are niniral.

Corrective Action:

Investigation revealed that a vire within the LS-5222 switch case had been pinched and brs en.

The virin3 was repaireI end the lovel switch succescfully tested in cecordance with the applicable surve.111ance test.

N Failure Data:

One previous, reported am 50-277-75-4.

Very truly yours, N W5%{ O '

W. T. Ullrich; Superintendent Peach tottco Atonic Power Station C

e 8401130077 750418 PDR ADOCK 05000278 S

PDR

-