ML20086G947
| ML20086G947 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/09/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086G946 | List: |
| References | |
| AO-75-20, NUDOCS 8401130077 | |
| Download: ML20086G947 (1) | |
Text
{}
\\)
y
/
PHIiADELPHIA D.TCTRIC COMPANY Peach Botton Atomic Power Statica Delta, Pennsylvania 17314 April 9, 1975 tfr. Jasws P. O'Reilly, Director Of fice of Inspection and Enforcement 4
- t.
En t States Nuclear Regulatory Cc d ssion gg 42/41;42., 4 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
Abnornal occurrence _24-!!our Notification Confirming V. T. U11 rich's phone conversation with }tr. Valt Launack, Region I United States Nuclear Regulatory Cc=sission, on April 9,1975.'
Rcference:
License Nuaber DTR-56
.cehnteel-e; c eif feceies -u f aa.ce:- 4.5.G -
Report No.:
50-278-75-20 Report Date:
April 9, 1975 Occurrence Date:
April 8, 1975 Facility:
Peach Lotton Atomic Power Station E.D. 1 Delta, Pennsylvania 17314 Identification of Occurrence:
Pailure of LS-5222 to operate SV-5222 (RER loop "B" high point veut on lov accumstator level).
Conditions Prior to Occurrence:
Unit 3 cpe) ating at approx 1nately COI.
Descriptics of Occurrence:
Lair.u a routine instrur:ent surveillance test, the svitch function of LS-5222 which picks up SV-5222 to cpen the RER Loop "B" high point vent failed to cperate.
Th* alarm function of the switch did. operate properly.
Designation of Apparent Cause of Occurrence:
Eroken wire on LS-5222.
Analysis of Occurrence:
Since the FTA loop was full prior to the test, the low acct::mulator level alatT2 was proven functional, exd the operator vestid respend to the lov level alarn to ensure that the systata was t:.aintained full, the safety implications of this failure are niniral.
Corrective Action:
Investigation revealed that a vire within the LS-5222 switch case had been pinched and brs en.
The virin3 was repaireI end the lovel switch succescfully tested in cecordance with the applicable surve.111ance test.
N Failure Data:
One previous, reported am 50-277-75-4.
Very truly yours, N W5%{ O '
W. T. Ullrich; Superintendent Peach tottco Atonic Power Station C
e 8401130077 750418 PDR ADOCK 05000278 S
-