ML20086G048
| ML20086G048 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/18/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086G029 | List: |
| References | |
| A-75-56, A0-75-56, NUDOCS 8401100031 | |
| Download: ML20086G048 (1) | |
Text
(
L, I
?
N t
j
.e f
{
1 PHILADELPHIA ELECTRIC' COMPANY Peach Botton Atomic Power Station
~
Delta, Pennsylv.ania
+
17314 i
"i -.
T-
.' ' wT"~~~fIF -s.
J r -
_' ~ ~ ~ + ~~ '
- ^~--.?~~--
m.
M.y E
..-_ s % i n... w a s
~
Office of Inopection and Enforcement
.A
[,(/M t.9.3447'kd-Uni
.Etates Nuricar Regula. tory Connico-ion
. 53.UprhJ.3'.e._nue _... _,__
}'
Ki n c o f78 u n a i a.. venrisylvan:n 2%OF__
w r1
]
- -----, surr.senur.ac=c-s, xneswA-- -. - a
-~==sen
~
i Suh.i ec t :.
.Abnc er.nL Oc curr enc e.2 L--Hour. 'Iotifien. tion I
Confirning W. T. U11 rich's phone conversation with Mr. Jim Partlov, Region.1, United States.liuelear Reguintory/Conniasi-- -
uguet-1-Tr16Tryg
Reference:
License-Ilumber DPR-4h h.T.B.3.n Technical Specification
Reference:
__ s
.m-c
..-i;-gu i
m y v i-.
v..
l
- Report Date:
August.It?. 1975 Occurrence Date:. Au g u st-17, 1975
,4 Facility:
Pench Botton Atomic Power Station R.D.
1, Delta.. Pennsylvania 17314 j
~
Identification.of Occurrence:
Standby Gas Treatment Systen Fan.(OBV20)s failed to "AUT0" start..
i Conditions Prior to Occurrence-Unit 2 shutdown. f Description of Occurrence:
During the performance of ST 1.3. PCIS Logie Systen Functional Test, the "B"
fan failed to " AUTO" start with.the "A"
fan in " Pull To Lock" and a reactor building ventilation isolation signal.
Designation of Apparent Cause of Occurrence: -
Under investigation.
Analysis of Occurrence:
During the test, on the reactor building ventilation isolation signal.
the "A" SBGTS fan started autenatically.
In addition,'the "B"
fan operated satisfactorily manually.
Safety implications are, therefore.
minimal.
~
Corrective Action:
Corrective maintenance vill be performed subsequent to identifying the problem.
Failure Data:
A previous failure of this type was reported as AO Su-277-7L-50.
t
}
Yery truly yours.
SVWd W.
T.
Ullrich, Superintendent Peach Botton Atomic Power Station s
J va-g4o1100031 750827 j,
PDR ADOCK 05000 j
i s
-