Commonwe.ilth FAlison Compan,.
3 liraidwmnl Generating Station Route oI. Ik)x H4 litat eville, !!. 60107-9619 Tel Hli-4W 2801 July 7,1995 BW/95-0074 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Station for the period June 1 through June 30,1995.
I 4
Yours truly, 1
4 y
T. J. Tulon Station Manager Braidwood Nuclear Station TJT/PS/dia o:\\corresp\\zcsteno\\bwdletrs. doc I
Attachments cc:
J. B. Martin, U.S.N.R.C., Region ill R. R. Assa, U.S.N.R.C.
1.D.N.S.
U.S.N.R.C. Resident inspector, Braidwood INPO Records Center D. L. Farrar, Nuclear Regional Service Mgr.
D. M. Saccomando, Nuclear Licensing Admin.
D. R. Eggett, Nuclear Engineering Dept.
K. Kaup, Site Vice President, Braidwood NFS, PWR Plant Support P. L. Habel, Unit 1 Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer I.D.N.S. Resident inspector, Braidwood J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.
b'!0006
/
9507130156 95,0630,,
/
pR
__C_,>._,
ooocx c5 oo, PDR i
i BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2
)
MONTHLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 l
n
a A. OPERATING DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 07/06/1995 Completed by: Paul Stanczak Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: June 1995 Gross Hours: 220
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
11.2Q Max Dependable Capacity (MWe-gross):
1175-Max Dependable Capacity (MWe-net):
11_22
- 3) Power level to which restricted (If Any):
None
- 4) Reasons for restrictions (If Any):
None This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
720.0 4,343.0 60,656.0
- 6) Hours Reactor Critical:
720.0 3,645.0 48,243.8
- 7) RX Reserve Shutdown Hours:
.0
.0
.0 I
- 8) Hours Generator on Line:
720.0 3,602.5 47,568.3
- 9) Unit Reserve Shutdown Hours:
.0
.0
.0
- 10) Gross Thermal Energy (MWHt):
2,435,624.6 11,862,028.9 151,736,951.2 r
- 11) Gross Elect. Energy (MWH):
832,911.0 4,105,566.0 50,609,388.0
- 12) Net Elect. Energy (MWH):
802,928.0 3,945,620.0 48,478,440.0
- 13) Reactor Service Factor:
100.0 83.9 79.5 1
- 14) Reactor Availability Factor.
100.0
_83.9
'79.5
- 15) Unit Service Factor:
100.0 82.9 78.4
- 16) Unit Availability Factor:
100.0 82.9 78.4
- 17) Unit Capacity Factor (MDC NET):
99.6 81.1 71.4
- 18) Unit Capacity Factor (DER NET):~
99.6 81.1 71.4
- 19) Unit Forced Outage Rate:
0.0 4.9 8.1
- 20) Unit Forced Outage Hours:
0.0 _
184.0 4214.5 i
- 21) Shutdown Schedule Over Next 6 Months:
N/A 22)If Shutdown at End of Reporting Period, Estimated Date of Startup:
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 07/06/1995
' Completed by: Paul Stanczak
~
Telephone: 815-458-2801' MONTH: June 1995 Qay MWe-net -
Qay MWe-net 1) 1130
- 16) 1122
- 2) 1129 *
.17) 1122
- 3) 1128
- 18) 1121
- 4) 1126
- 19) 1116 5) 1124
- 20) 1115 6) 1124
- 21) 1114 7) 1121
- 22) 1115 8) 1130
- 23) 1113-9) 1136
- 24) 1111 10) 1114 25) 1110 11) 982 26) 1108 12) 1117 27) 1101 13) 1130
- 28) 1104 14) 1127
- 29) 1106 15) 1124 *
' 30) 1119
- Due to condenser efficiency
. C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 07/06/95 Completed by: Paul Stanczak E
Telephone: 815-458-2801 REPORT PERIOD:
June 1995 LER Cause & Corrective Action No Date Type Hours Reason Method Number System Component to Prevent Recurrence a
N/A
- o
SUMMARY
Unit 1 entered the month of June 1995 with 100% capability.
I The unit operated routinely for the remainder of the month.
TYPE REASON METHOD SYSTEM & COMPONENT F9-Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet
. D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other 4
9 9
4 e
v<
41 I
D.
SAFETY /REUEF VALVE OPERATIONS Docket No.: 50 -456 Unit: Braidwood 1 Date: 07/06/95 Completed by: Tom Cole
. Telephone: 815-458-2801 i
Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None 4
9 e
l l
A. OPERATING DATA REPORT Docket No: 50 457 Unit: Braidwood 2 Date: 07/06/1995 Completed by: Paul Stanczak Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: June 1995 Gross Hours:
L2Q
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
112Q Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (If Any):
None
- 4) Reasons for restrictions (if Any):
None This Mo.
Yr to Date Cumulative j
- 5) Report Period Hours:
720.0 4,343.0 58,738.0
- 6) Hours Reactor Critical:
720.0 4,172.0 49,004.4
- 7) RX Reserve Shutdown Hours:
.0
.0
.0
- 8) Hours Generator on Line:
720.0 4,166.8 48,609.1
- 9) Unit Reserve Shutdown Hours:
.0
.0
.0
- 10) Gross Thermal Energy (MWHt):
2,431,947.5 13,955,724.4 153,413,834.6
- 11) Gross Elect. Energy (MWH):
823,655.0 4,817,421.0 50,837,210.0
- 12) Net Elect. Energy (MWH):
794,146.0 4,645,397.0 48,748,127.0
- 13) Reactor Service Factor:
100.0 96.1 83.4
- 14) Reactor Availability Factor:
100.0 96.1 83.4
- 15) Unit Service Factor:
100.0 95.9 82.8
- 16) Unit Availability Factor:
100.0 95.9 82.8
- 17) Unit Capacity Factor (MDC NET):
98.5 95.5.
74.1
- 18) Unit Capacity Factor (DER NET):
98.5 95.5 74.1
- 19) Unit Forced Outage Rate:
0.0 4.1 5.7
- 20) Unit Forced Outage Hours:
0.0 176.3 2947.6
- 21) Shutdown Schedule Over Next 6 Months:
N/A
- 22) If Shutdown at end of Reporting Period, Estimated Date of Startup:
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457-Unit: Braidwood 2 Date: 07/06/1995 Completed by: Paul Stanczak -
Telephone: 815-458-2801 MONTH: June 1995 Day My_VA-net Ray Mwe-net.
a a
1) 1098 16) 1112 2) 1108 17) 1104 3) 1112 18) 1080 4) 1045 19) 1106 5) 1103 20) 1103 6) 1071 21) 1103 7) 1110 22) 1062 8) 1111
- 23).
1103 9) 1116 24) 1104 10) 1119 25) 1103 11) 1107 26) 1102 12) 1119 27) 1107 13) 1117 28) 1108 14) 1110 29) 1111 15) 1108 30) 1112
- Due to condenser efficiency i --
C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 457 Unit: Braidwood 2 Date: 07/06/95 Completed by: Paul Stanczak Telephone: 815-458-2801 REPORT PERIOD:
June 1995 LER Cause & Corrective Action h
Date Type Hours Reason Method Number System Comoonent to Prevent Recurrence N/A
- "SUMMARP" Unit 2 entered the month of June 1995 at 100% capability. The unit operated routinely for the remainder of the month.
TYPE REASON METHOD SYSTEM & COMPONENT
- F.- Forced A-Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for l'
C - Refueling -
3 - Auto Scram Preparation of Data Entry Sheet i
D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H. - Other 3
9 l1..
s..
w..
,s.
.)
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 -457 Unit: Braidwood 2 Date: 07/06/95 Completed by: Tom Cole Telephone: 815-458-2801 Valves No. & Type Plant
- Date Actuated Actuation Condition Description of Event None I