Forwards Catawba Unit 1 1995 Interim Plugging Criteria 90 Day Rept, Dtd June 1995. Rept Re Detailed Assessment of 630 Vs 610 Bobbin Probe Comparison & Analyst Error,As Committed to in TS Amends 130/124
ML20086F459
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/07/1995
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086F462 List:
References
NUDOCS 9507130131
Download: ML20086F459 (1)


Text

,' ll l  !

  • ! Dukehnver Company D.L Rtns Catauba Nuclear Genention Department Hce lyesident \

4800 ConcordRoad (803pl3205 Onice York, SC29745 (803Mi3426 Fat i l DUKEPOWER l

July 7,1995 l tU. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555

Subject:

Catawba Nuclear Station, Unit 1 Docket No. 50-413 Technical Specification Amendment No. 130/124 for FOL NPF-35/NPF-52 Renewal Of Steam Generator Tube Interim Plugging Criteria for Unit 1 Cycle 9 Report on "630" vs. "610" Bobbin Probe Comparison and Analyst Error Assessment

Reference:

NRC Issuance of subject Amendment Dated March 17,1995 Ietter to NRC from Duke Power, Catawba Nuclear Station, dated June 26,1995, conceming same subject.

1 1

Attached is the complete report on the detailed assessment of the 630 vs. 610 Bobbin Probe l comparison and analyst error, as committed to in the subject Technical Specification Amendment and referenced letter from Duke Power Co.

Pursuant to 10 CFR 50.91 (bXI), the appuriate South Carolina official is being provided a copy of this amendment supplemental information.

Very truly y rs, D. L. Rehn ,

Attachments DT/