DukeIswer O>mpany T. C hidirms hkGuire Nudear Generation Depanment Vrce hesident I?i.00Hayrs Ferrylioad(AfGon?)
(704)87548W Huntenmile, NC28078B985 (701)8754809 Fat DUKEPOWER
~ June 19, 1995 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
McGuire Nuclear Station Docket Nos:
50-369 and 370 Use of Alternative Pressure Test Requirement (Code Case N-416-1) For Welded Installation of Valve 1NI-158.
l l
Dear Sir:
On April 29, 1993, McGuire Engineering and Maintenance installed replacement valve 1NI-158 into class 2 piping of the Safety Injection System.
At that time, McGuire Unit 1 was committed to the 1986 edition of Section XI of the ASME Boiler and Pressure Vessel Code.
The second interval had begun on December 1, 1992.
Hydrostatic testing of the repair at that time would have created a hardship to the plant.
Thus the hydrostatic test was deferred since it was not required until the end of the second interval (November 30, 2002).
By letter dated February 22, 1995, Duke Power proposed to apply Code Case N-416-1 as alternative pressure test rules for welded repairs or installation of replacement items by welding in Class 1,2 and 3 piping at McGuire Units 1 and 2.
By Letter dated March 27, 1995, The Nuclear Regulatory Commission authorized the use of Code Case N-416-1 pursuant to 10 CFR 50.55a (a) (3 ) (ii).
Regarding the installation welds of the replacement valve 1NI-158, in that (a) NDE was performed in accordance with the methods and acceptance crAreria of subsection NC-5000 of the 1992 Edition of The ASME Code Section III; (b) a VT-2 visual examination was performed in conjunction with a system leakage test, using the 1992 Edition of Section XI in accordance with para. IWA-5000, at nominal operating pressure and temperature, and (c) use of this case was documented on the applicable NIS-2 Form, McGuire has invoked Code Case N-416-1 in this matter.
Therefore, no further action is planned in this matter.
If there are any questions regarding this matter, please contact Dwin Caldwell at extension (704) 875-4328 Very Truly y rs, W
Ted McMeekin Vice President, McGuire Nuclear station 0300ja POR ADOCK 05000369
-glf; 0
9507050223 950619 e waw P
y-.
,e ib.S. Nuclear-RegulatoryCommission.
June 19, 1995 Page 2/3 xc:
Mr.
S. D.
Ebneter A9ministrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St.,
NW, Suite 2900 Atlanta, Ga.
30323 Mr. Victor Nerses
- i U.S. Nuclear Regulatory Commission Office of Nuclear. Reactor Regulation Mail Stop'14H25 Washington, D.C.
20555 i
Mr. Robert E. Martin U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.
20555 Mr. George F. Maxwell NRC Resident Inspector McGuire Nuclear Station l
l l
i i
l l
1
4 o
4 o
4
' June 19, 1995 U.S. Nuclear Regulatory Commission Page 3/3 bxc:
ELL / Topic (EC050)
Jesse O. Barbour (EC07J)
Jerry Goodman (EC07J)
G. A.
Copp (EC050)
Z.
L. Taylor (CN01RC)
E.
Burchfield (ON01RC)
W.
R. Cross Kay L.
Crane Dwin E.
Caldwell P.
T.
Vu John M.
Washam i
(
-