Text
.,
g-g'-
m r
W V'
TENNESSEE VALLEY AUTHORITY C"*19 ?" f*\\-
CHAa a ANCOGA, TENNESSEE ti iCI 3 7 4 C 'I d
/ / M.?
- /Y] 'I(&
h&G l= L %:)
8[3 SW'&issN6N December 7, 1973 Pg, R\\
PET "r
S-
' un gj
- ygpHu274 a p"Cl3197< 5:..;s ^w"t-J, yn~b;^
y-w ym t.1fkyg g
t e... -suf vvc g,.'**~
j 9% Li%
Mr. John F. O' leary, Director
- t. rig',
jy i i
-<\\^
Directorate of Licensing Office of Regulation y"IN U.S. Atouic Energy Co:niscion Washington, DC 20545
Dear Mr. O' Leary:
TSNIESSEE VALIEY AUTHORITY - EROWNS FERRY NUCLEAR PLANT UHIT 1 -
DOCKET NO. 50-259 - FACILITY OPERATING LICENSE DPR AENOMAL OCCURRENCE REPORT LFAO-734Mi The enclosed report is to provide details concerning n main steamline high-flow pressure switch malfunction Q ich occurred on Browns Ferry Nuclear Plant unit 1 on November 30, 1973, and is submitted in-accordance with Appendix A to Regulatory Guide 1.16, Revision 1, t
l October 1973 Very truly yours, 1
TEUNESSEE VAIlff' AUTHORITY:
1
)
ks Q7xc#
l E. F.-Thomac Director of Power Production Enclosure ~
-CC(Enclosure):
Mr. Norman C. Moseley, Director-
. Region-II Regulatory Operations Office,. USAEC l
230 Peachtree Street, Inl. ~
-Atlanta, Georgia -30303 -
1 --
l_
V ll
_ \\ l ~'b
-g Mi 8311080616 731207 l
7"/ '
,gggu<3 -
PDR ADOCK 05000259
'1
. _..g
_ ;.PDR.___
y
/ nA
~
- am ma n.
~
=
7-.
ABNORMAL OCCURRENCE REPORT
. Report No.--BFAO-73% W Report Date--December 7,1973 Occurrence Date--Hovember 30, 1973 Facility--Browns Ferry Nuclear Plant unit 1 Identification of Occurrence Unit 1 main steamline high-flow pressure switch malfunction.
Conditions Prior to Occurrence j
Reactor was at 25-percent thermal power during startup testing.
ll Description of Occurrence During routine daily instrument checks, main steamline high-flow pressure I
switch PdIS-1-25D was found not indicating correctly.
Analysis of Occurrence One switch from each of the four steamlines is connected in a series to establish one trip logic in a one out of two taken twice trip system in the primary containment isolation control system. The other 15 switches
~
were indicating correctly.
Corrective Action A replace =ent differential pressure switch, Earton Model 278, was installed, calibrated, functionally tested, and placed in. service. A bench test of the failed switch indicated that the low-pressure bellows was leakira.
Failure Data Barton Model 278; serial No. 278-2990.
Switch Date~
Failure Corrective Action 1 PdIS-1-25D 11/30/73 Faulty indication-
~ Replaced' pressure switch-e 4
4 e
8 e