AO BFAO-742W:on 740108,main Steam Inboard Isolation Valves FCV 1-26 & FCV 1-51 Failed to Close as Required.Cause Unknown.Adjustment of Auto-Ponent Flow Control Valves Restored Valve Closure Timing to Acceptable Limits
ML20085M227
Person / Time
Site: Browns Ferry 
Issue date: 01/17/1974
From: Eric Thomas
TENNESSEE VALLEY AUTHORITY
To: Oleary J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20085M231 List:
References
AO-BFAO-742W, NUDOCS 8311080132
Download: ML20085M227 (2)


Text

1 O

w O

TENNESSEE VALLEY AUTHOAITY MM CHATTANOOGA, TENNESSEE

\\T e

37401 y

L ' u-i January 17, 1974

)

@@fj 9

Lu.

p.sg 5 an221974-se ep

~

ATW M Mr. John F. O' Leary, Director g % [S :088 Directorate of Licensing

//

Office of Regulation 34 u l

U.S. Atomic Energy Co= mission Washington, DC 20545 i

Dear Mr. O' Leary:

l TENNESSEE VALLEY AUTHORITY - BROWNS FERRY NUCLEAR PLANT UNIT 1 -

DOCKET NO. 50-259 - FACILITY OPERATING LICENSE DPR ABNOR:RL l

OCCURRENCE REPORT BFAO-742W l

The enclosed report is to provide details concerning FCV 1-26 and FCV l-51 main steam inboard isolation valves which failed to close i

within 3-5 seconds as required by technical specifications which occurred on Browns Ferry Nuclear Plant unit 1 on January 8, 1974, and is submitted in accerdance with Appendix A to Regulatory i

Guide 1.16, Revision 1, October 1973.

f Very truly yours, TENNESSEE VALLEY AUTHORITY 7

L l 4+%

E. F. Tho=as Director of Power Production Enclosure i

CC (Enclosure):

I Mr. Norman C. !!oseley, Director Region II Regulatory Operations Office, USAEC 230 Peachtree Street, NW.

Atlanta, Georgia 30303

//

l c1 COPY SENT REGIO I

l 8311080132 740117 i

i QDRADOCK 05000259 i

g /\\

l

.1

_ gz1 PDR

\\t

\\ zt

\\

u

__. _ _ _. i.

q

'~

Q O

r:

ABNORMAL OCCURRDICE REPORT y

Report No.--BFAO-Th2W Beport Date--January 17,197h Occurrence Date--January 8, 1974 Facility--Browns Ferry Nuclear Plant unit 1 Identification of Occurrence J

FCV l-26 and FCV l-51 main steam inboard isolation valves failed to close within 3-5 seconds as required by technical specifications.

Conditions Prior to Occurrence The reactor was operating at a thermal power of1,709 m.

I Description of Occurrence While conducting a required surveillance test FCV l-26 and FCV 1-51 closed in 5 3 seconds and 6.2 seconds, respectively.

t Designation of Accarent Cause of Occurrence The exact cause of failure is unknown. The main steam isolation valve dashpots are fitted with a 3/4" Auto-Ponent Flow Control Valve with micrometer adjustment for controlling the speed of valve closure.

e Analysis of Occurrence The outboard isolation valve FCV was operable and would have closed within the required time had a containment isolation signal occurred.

Corrective Action, A single adjustment of the Auto-Ponent Flow Control Volves restored the valve closure timing to acceptable limits. Surveillance Instruction SI k.7.D.l.b(1) was cetisfactorily performed.

Failure Ihta This type of control valve (Auto-Ponent Flow Control) has no record of previous failure.

Valve Data:

3%" Auto-Ponent Flow Control' Valve, Knob-Type - Auto-Ponent Dreving No. FK-750

_