ML20085H556

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1995 for McGuire Nuclear Station
ML20085H556
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 05/31/1995
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20085H407 List:
References
NUDOCS 9506210238
Download: ML20085H556 (10)


Text

OPERATING DATA REPORT DOCKET ND 50-369 BATE June 15. 1995 1 FERATING STATUS COMPLETED BY R.A. Williams l TELEPHDNE 704-382-5346 l

1. Unit Nase: McGuire 1
2. Reporting Period: May 1,' 1995-May 31, 1995 .l
3. Licensed Thersal Power (MWti: 3411 .
4. Nameplate Rating (Gross MWe): 13054 Notes *Naseplate Rating
5. Design Electrical Rating (Wet MWe): 1180 (Gross MWe) calculated as
6. Maxinus Dependable Capacity (6 toss MWe): 1171 1450.000 MVA x .90 power  ;
7. Maxieus Dependable Capacity (Net rWel: 1129 factor per Page lit, l B. If Changes Occur in tapacity Ratings (Itees Number 3 Through 7) Since Last NURE6-0020. l Report. Give Reasons: j
9. Power Level To Which Rectricted, if Any (Net MWe):
10. Reason For Restrictions, If any:

This Month Yr.-to-Date Cuaulative

11. Hours In Reporting Feriod 744.0 3623.0 118319.0
12. Nuster Of Hours Reactor Was Critical 744.0 3592.7 83952.1
13. Reactor Reserve Shutdown Hours - - -
14. Hours 6enerator On-Line 744.0 3583.5 63096.1
15. Unit Reserve Shatdown Hours - - - 16. Gross Thersal Energy Generated (MWH1 2533705 12154362 259986788
17. Gross Electrical Energy Generated (MWH) 865678 4198384 89350107
18. Net Electrical Energy Generated (MWH) 833085 4041290 85348658
19. Unit Service Factor 100.0 98.9 70.2
20. Unit Availability Factor 100.0 98.9 70.2
21. Unit Capacity Factor (Using MDC Net) 99.2 98.8 62.9 E2. Unit Capacity Factor (Using DER Net) 94.9 ob5 61.1
23. Unit Forced Datage Rate 0.0 1.1 14.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 29..lf Shut Down At End Of Report Period. Estiaated Date of Startup:

25. Units in Test Status (Prior to Coseercial Operation)s Forecast Achieved l i INITIAL CRITICAL!iY i l

j INITIAL ELECTRICITY COMMERCIAL OPERAi!DN l

L m R

~. ,

0 l

OPERATING CATA REPORT DOCKET NO 50-369 UNIT McGuire 1 2 ATE hne 15. 1995 ,

COMPLETED BY R.A. Williams !

l TELEPHONE 704-382-5346 MONTH May,1995 ,

LE AVERABE CAILY POWER LEVEL LAR AVERAGEDAILYPOWERLEVEL (MWe-Net) (MWe-Het) 1  !!20 17  !!26 2 1117 18 1126 3 1119 19  !!25 4 _, 1125 20 1117 5 1128 21 1119 6 1125 22 1117 7 1125 23 1117 5 1122 24 1119 9 1124 25 1118 10  !!28 l

26 1114 1

!! 1130 27 1107 12 1124 28 1109 13 1118 29 1113  !

14 1120 30 1114

)

15 1121 31 1108 16 1119 l

i l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 1 UNIT NAME nwuixs 1 ,

DATE uo/1:>f sp _

REPORT MONTH May 1995 COMPLETED BY x. A. W1111aps TELEPHONE t ius j -Ja z-:>J40 (1) 2) _

(4) (5)

E HOD T A OF LICENSE

' N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE -

O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO.- CODE CODE PREVENT RECURRENCE.

i' NO SHUTDOWNS OR REDUCTION S >

?

i t

9 1

(1) (2) (3) (4)

F Forced Reason- Method:- Exhibit G' --Instructions S Scheduled. A-Equipment FailureB-Maintenance or test (Explain)-

~1-Manual' for Preparation of Data 2-Manual-Scram EntW'Sneets.For Licensee '

C-Refueling 3-Automatic Scram Event Report-(LER .

.D-Regulatory R9strictiot) , , 4-Other (Explain) . File (NUREG-0161))

E- rator Trainin

  • . F- @ Administrative g &, License-Examination ~ (5gxhibitI-SameSource G-Operator Error (Explain)

H-Other (Explain) h

. . _ . . . . ., _ ,,. ,_. . . - - . , ~ . . ,m. . ,...,w .,-,,-,nc .-. _ , _ ,

l

. a DOCKET: 50-369 UNIT: McGuire 1 Date: 06/15/95 NARRATIVE

SUMMARY

! MONTH: May 1995 McGuire Un it 1 began the month of May operating at 100% full power. The unit f operated at or near 100% full power for the entire month. ,

I 1

l l

i i

I l

t l

i I t

l Prepared by: R. A. Williams

, Telephone: (704)-382-5346 I

i L

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire. Unit i
2. Scheduled next refueling shutdown: December 1995
3. Scheduled restart following refueling: January 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF-ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 151
8. Present licensed fuel pool capacity: 1All Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE: June 15. 1995 Name of

Contact:

R. A. Williams Phone: (7041-382-5346 1

l

1 .

l .

OPERATING DATA REPORT l DOCKET NO 50-370 DATE June 15. 1995 OPERATING STATUS COMPLETED BY , R.A. Williams TELEPHONE 704-382-5346

1. Unit Hase: McGuire 2
2. Reporting Period: May 1, 1995-May 31, 1995
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (Gross MWeh 1305e Notes eNaseplate Rating l

l 5. Design Electrical Rating (Net MWel: 1180 (Gross MWe) talculated as

! 6. Maxinua Dependable Capacity (6 toss NWe):  !!71 1450.000 MVA : .90 power l 7. Maxisus Depenfable Capacity (Net MWe):  !!29 factor per Page lii, l 8. If Changes Occur in Capacity Ratings (! tees Nusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons:

9. Poner Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictions, If any:

This Month Yr.-to-Date Cuaulative l

!!. Hours In Reporting Period 744.0

12. Nusber Df Hours Reactor Was Critical 3623.0 98615.0 )

744.0 3247.9 76800.7 l

13. Reactor Reserve Shutdown Hours --0-- - - 14. Hours Generater On-Line 744.0 3197.2 75781.8
13. Unit Reserve Shutdown Hours - --0-- --0--
16. Gross Thersal Energy Generated (MWH) 2534654 10731231 248576645
17. Gross Electrical Energy Generated (MWH) 878170 3744567 86792165
18. Net Electrical Energy Generated (MWHI 846136 3598977 83221323
19. Unit Service Factor 100.0 88.3 76.8
20. Unit Availability Factor 100.0 88.3 76.8
21. Unit Capacity Facter (Using MDC Natl 100.7 88.0 74.0
22. Unit Capacity Factor (Using DER Net) 96.4 84.2 71.5
23. Unit Forced Outage Rate 0.0 4.7 6.6
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None l 25. If Shut Down At End Cf Report Peried. Estisated Date of Startup:

26. Units In Test Status (Prior to Coseercial Operatien): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION

OPERAllNS DATA REPORT l I

DOCKET ND 50-370 l

!! NIT McGuire 2 DATE June 15. 1995 COMPLETED BY R.A. Williams TELEPHONE 704-302-5346 MONTH M2Y. 1995 E AVERAEE DAILY POWER LEVEL pay. AVERAGE DAILY POWER LEVEL (Me-Net) IWe-Net) 1 1143 17 1140 2 1140 19 1141

, 3  !!42  !? 1140 4 1144 20 1133 5 1143 21 1136 6 iMt 22 1134 7 1141 23 1134 -

8 1140 24  !!35 9  !!42 25 1134 10 1140 26 1132 ,

11  !!45 27  !!26 12 1143 28 1128 l 13  !!37 29  !!31 14 1139 30 1131 15 1139 31 1126 14 1136

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 ..

UNIT NAME nuzU1K2; 2 DATE ue/lo/wo .

REPORT MONTH May 1995 COMPLETED BY M. A. Williams TELEPHONE tsue)-Juz-oJ40 (1) 2) g_ (4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)F Forced (2) (3) (4)

S Scheduled Reason

  • Method:-

1-Manual Exhibit G --Instructions for Preparation of Data A-Equipment FailureB-Maintenance or test (Explain) 2-Manual Scram EntU Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulaton R9striction. , ,

4-Other (Explain) File'( W G-Ol61))

E-OgeratorTraining& License Examination bb b$ $h E H-O er (Explain) (Explain) xhibit I - Same Source

1 .

[

l r

I DOCKET: 50-370 UNIT: McGuire 2 l

Date: 06/15/95 f

l NARRATIVE

SUMMARY

MONTH: May 1995 McGuire Unit 2 began the month of May operating at 100% full power. The unit operated at or.near 100% full power for the entire month, t i l

F l

t Prepared by: R. A. Williams  ;

Telephone: (704)-382-5346 i

~. . - - , . . . . . ._-_-

4 i

I i

MONTHLY REFUELING INFORMATION REOUEST i 1. ' Facility name: McGuire. Unit 2 i:'-

2. Scheduled next refueling shutdown: April 1996 J
3. Scheduled restart following refueling: May 1996 i

i THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF

] ANY T.S. CHANGE OR . LICENSE AMENDMENT. THEREFORE,' QUESTIONS 4 5

THROUGH 6 WILL NO LONGER BE MAINTAINED-IN THIS REPORT.

4. Will refueling or resumption of operation'thereafter require a.
technical specification change or other' licence amendment?

I j If yes, what will these be?  !

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding.unreviewed safety questions?

I

. 5. Scheduled date (s) for submitting proposed' licensing action and i supporting information. -

6. Important licensing considerations.(new or different design or J supplier, unreviewed design or performance. analysis methods, j significant changes in design or new operating procedures) . j

~

7. Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 311
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE: June 15. 1995 Name of

Contact:

R. A. Williama Phone: (7041-392-5346 me+ - ~ -r-t