JPN-95-029, Forwards Application for Amend to License DPR-59,proposing Changes to Ts,To Extend Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycle

From kanterella
(Redirected from JPN-95-029)
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,proposing Changes to Ts,To Extend Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycle
ML20085G340
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/15/1995
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085G345 List:
References
JPN-95-029, JPN-95-29, NUDOCS 9506200169
Download: ML20085G340 (2)


Text

. r

. 123 Main Street

' White Pains New York 10601

)

914 6814 840  ;

914 287 3Jo9 (FAX)

  1. b NewYorkPower wm_ .,. c n,. .. I tv Authority c~ "~ o"-  ;

1 June 15,1995  !

IPN 95-029 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555

Subject:

James A. Fit 2 Patrick Nuclear Power Plant Docket No. 50-333 Proposed Changes to the Te chnical Specifications Regarding Extension of the Control Rod System Surveillance Test intervals to Accommodate 24-Month Operatina Cycles (JPTS-95-OO1El

Reference:

1. NRC Generic Letter 91-04, " Changes in Technical -

Specification Surveillance Intervals to l

Accommodate 24-Month Fuel Cycle," dated April 2,1991.

Dear Sir:

j l

This application for an amendment to the James A. FitzPatrick Nuclear Power i Plant Technical Specifications proposes to extend the surveillance test intervals for the control rod system to support 24 month operating cycles. The proposed changes follow the guidance of Generic Letter 91-04 (Reference 1). Approval of these changes will eliminate the need to schedule mid-cycle outages to conduct these surveillance tests.

Surveillance test interval extensions that are justified will be denoted as being performed "every 24 months" or "at least once per 24 months" consistent with the guidance provided in Reference 1. Other surveillances currently performed "once each operating cycle," "at least once during each operating cycle," "each refueling," or similar notation, that are not being extended at this time will be denoted as being performed "at least once per 18 months."

The signed original of the Application for Amendment to the Technical Specifications is enclosed for filing. Attachments I and lli to this application contain the proposed changes to the Technical Specifications and a mark-up of the current Technical Specifications pages, respectively. Attachment 11 contains the associated .

Safety Evaluation for the control rod system.

9506200169 950615 i PDR ADOCK 05000333 P PDR

-In accordance with 10 CFR 50.91; a copy of this application and the associated attachments are being provided to the designated New York State official.

If you have any questions, please contact Ms. C. D. Faison.

Very truly yours,

/. .

Wil iam J.'Ca ill, Jr.

Chief Nuclear Officer cc: Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Officeof the Resident inspector U.S. Nuclear Regulatory Commission P. O. Box 136 Lycoming, NY 13093 Mr. C. E. Carpenter, Project Manager Project Directorate 1-1 Division of Reactor Projects -l/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16* Floor Albany, NY 12223 I

t-