ML20085F880

From kanterella
Jump to navigation Jump to search
Revised AO 74-08 Revises Corrective Action.Present Location of Restraint Anchor Places Anchor Bolts Partially in Tension & Partially in Shear
ML20085F880
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/13/1974
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20085F887 List:
References
AO-74-08, AO-74-8, NUDOCS 8308230537
Download: ML20085F880 (1)


Text

_ _ - _ _ _ _ _ - - _ _ _ _ _ _ - _ - - _ _ _ _

(w p LJ

/ CORSURIBIS 6 ~ Power (w,/ Company s a ]. U co nc,. o,,.co. : 2,2 w .i u.cn.gan Avenue. JaO non, Michigan 40201. Aten Code St 7 7HH 05bO August 13, 1974 Directorate of Licensing Re: Docket 50-255 US Atomic Energy Commission License DPR-20 Washington, DC 20545 Palisades Plant Gentlemen:

By letter dated July 19, 1974, Consumers Power Company l transmitted Abnormal Occurrence Report 74-08. This letter is written to revise the corrective action Paragraph 9a of that report. l Due to problems with the planned installation of the restraint anchor, it was not located such that the expansion anchor bolts were placed in shear. The present location of the restraint anchor places the anchor bolts partially in tension and partially in shear. Allowable stresses in this location exceed the design requirements.

Yours very truly, Ralph B. Sewell (Signed)

RBS/ds Ralph B. Sewell Nuclear Licensing Administrator CC: JGKeppler, USAEC l

.  ; s' d lL

) i

/

{,-

. t 'o !

tA v .h 9300230537 0 5 DR ADOCK 0 PDR ) g),

COPY SENT REGION u