ML20085D473
| ML20085D473 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/16/1972 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Block E US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20085D475 | List: |
| References | |
| NUDOCS 8307250701 | |
| Download: ML20085D473 (1) | |
Text
- - - - - - _ _ - - -
p
.,c Q
. mj
- 7 m.
u *,p-n
-w.
g
/
~
Carolina Power & Light Compan R
Raleigh, North Carolina 27602 f-}
)
June 16, 1972 t
S S
- % !b s
i N
D 4
Robinson File No. 2-0-4-a 77
.sh Mr. Edward J. Block, Acting Director Directorate of Licensing U. S. Atomic Energy Commission Washington, D. C.
20545 H. B. ROBINSON UNIT NO. 2 License DPR-23 BINDING OF "A" CONTAINMENT SPRAY PUMP e
Dear Mr. Block:
In accordance with Paragraph 6.6.1.c, Technical Specifications, the following abnormal occurrence is reported.
While performing a= routine equipment check it was discovered that "A" containment spray pump would not rotate freely when turned by hand. The pump was disassembled and inspected.
It was found that the, impeller alignment ring was galled and binding on the casing alignment e
seal ring. A new impeller, impeller alignment seal ring and casing alignment ring were installed. The pump was reassembled and test run i
satisfactorily. This is documented in Periodic Test No. 2.3 performed on June 7, 1972.
The reactor was shutdown during this period for repairs not i
related to the above problem.
1 Yours very truly, s
p E. E. Ut. ley Manager Bulk Power Supply 7,. :
Ih JBM/kf
. ~, -
{D,j2]el f i
/,c,p e cc: Mr. C. D. Barham
- Nd d ',<
'5
> - it "
l ZGJ
-Mr. N. B. Bessac'.
.c
,c Mr. Bs J. Furr
. W,,
u-l c-q Q..
1
- n
_ =- +.
,~
ggye. 5 n. :
~
.m Jw
~
~
8307250701 720616 PDR ADOCK 05000261 S
QfQy z+
pgp
__.