Telecopy Ao:On 741010,explosion Occurred in Offgas Holdup Line Releasing Offgas from Ruptured Steam Jet Air Ejector Rupture Disc 1B.Load Reduced & Disc Placed in Svc
ML20085C929
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/10/1974
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NJK-74-325, NUDOCS 8307130238
Download: ML20085C929 (2)


Text

Ccmmonwecith Edison

  • ,e ;

9 -

.4 Pes: 0::(@ps ix.N 6 tat.on

. b Cad CA

- 'r'.

f V:=ItG A

. I comn ss w

  • / Te'cponc C9/654 2241

,..,f p

u.'

,t 3

~,,, :..L.l

"/.

' w... fin;:,

M

!!J K-7 4-325 Telecopy:

Region III, Attention:

tir. C. Feierabend October 10, 1974 J. Keppler, Regional Director Directorate of Regulatory Operations Region III U. S. Atomic Energy Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

Quad-Cities liuclear Pouer Station, Unit 1 Docket tio. 50-254, DPR-29 Appendix A, Sections 1.0.A.3, 1.0.A.5, and 6.6.B.l.a

Dear I4r. Keppler:

The purpose of this letter is to provide you with notifi-cation of an Abnormal Occurrence as required by Technical Specification 6.6.B.l.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

At 10:04 a.m. On October 10, 1974, with Unit 1 at 520 me, an explosion occurred in the Unit 1 off gas holdup line.

The 1B Steam Jet Air Ejector rupture disc ruptured releasing off gas to the steam jet air ejector room through the tur-bine building ventilation system to the main chimney.

The i

/

resultant reduction in the off-gas hold-up time caused an indicated increase from approximately 30,000 microcuries/

sec to approximately 100,000 microcuries/sec at the main chimney radiation monitors.

A GSEP condition ABEL was de-clared at 10:07 a.m.

The unit load was reduced to 320 We, the 1 A SJ AE was placed in service, and the 1B SJ AE was iso-

,i lated by 10: 30 a.n.

A reduction in radioactivity as indicated l

by the main chimney radiation monitors was noted and therefore dropped to pre-incident levels.

The 1A chimney filter was l

placed in service and the 1B' chimney filter was isolated by 10: 50 a.m.

Condition ABLE was terminated at, 11:04 a.m.

g71302387 o

ADOCK 05 pg 10G78 g

con sent annowI

~

~

o O

o Mr. J. Keppler October 10, 1974 i

This occurrence was discussed by telephone with Mr. C. Feierabend of your office en October 10, 1974 Further information will be provided by Abnormal Occurrence Report A0 50-254/74-29 which will be submitted within 10 days of the date of this occurrence.

Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION r

/ $ ',,5ff,. :.<s i

.v.4. ~-'3 N. J. Kali'vianakis Station Superintendent 9

NJK/CWS/lk cc:

Directorate of Licensing J. S. Abel 9

t f

O O

e