ML20085C867
| ML20085C867 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 12/16/1974 |
| From: | Kalivianakis N COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20085C865 | List: |
| References | |
| NJK-74-417, NUDOCS 8307130175 | |
| Download: ML20085C867 (1) | |
Text
. - _ _
i Commepw'ealth Edison
-~ M Ced CW iaucar Pa..er Staton f.
. I'
'd f
~
i
/
~2 1
~
- Ai Pos:Off:d v h 216 V
/
C J
( DC Cordova.1;i:rns 612 '2
/
/y/, t'![{I/4.fp Telephone 309/ 654-2241 l l$((t J,l NJK-7b-417
[i -
\\,1~
f,
.1 (Q N t
Telecopy:
Region III, Attention:
Mr. C. Feierabend D) s December 16, 1974 J. Keppler, Regional Director Directorate of Regulatory Operations Region III U. S. Atomic Energy Commission j
799 Roosevelt Road Glen Ellyn, Illinois 60137
Reference:
Quad-Cities !iuclear Power Station,. Unit 1 Docket !!o. 50-254, DPR-29 Appendix A, Sections 1.0.A.2, 3 3.B.3.b.,
6.6.B.l.a
Dear l's. Keppler:
The purpose of this letter is to provide you with notificaticn of an Abnormal Occurrence as required by Technical Specification 6.6.B.l.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.
While pulling rods for startup of Unit 1 on December 16, 1974 r
the RWH computer failed and did not annunciate.
This failure l
of the RWM occurred during startup below 10% power and allowed the operator to withdraw an out-of-sequence rod without a rod block or alarm.
This move occurred 5 rods after the RWM failure.
~
The rod sequence error was recoEnized by visual observation of the rod position display panel.
The out-of-sequence rod i
was returned to its in-sequence position and the RWM was re-turned to operation.
This error was corrected within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
L I
This occurrence was discussed by telephone with Mr. Knopp of your. office on December 16, 1974.
Further information will be i
provided by Abnormal Occurrence Report A0 50-254/74-39 which will g.
be submitted within 10 days of the date of this occurrence.
Of E.
O
.Very truly yours,
$n COICIOHWEALTH EDISO:! COMPAi!Y 0
QUAD-CITIES,N' CLEAR POWER STATION c
'/I i,;th%
(
V!;
r N. J. Kalivianakis >
n ct Station Superintendent q
ma.m NJK/BBP/1k
~~
cc:
Directorate of Licensing
'J..S. cAbel g
A
~
6CN REdh
/
- // O [t Qu:d Citi car Powot Station N
d' i/ 7 Cordova, Illinois 61242 f
Post Othec 216 ly V
Telephone 309/654-2241 l
NJKL 74-417 '
g Telecopy:
Regi~on III, Attention:
Mr; C. Feierabend-I i
December 16, 1974 i
f J.. Keppler, Regional Director-
[
Directorate of ' Regulatory-Operations g
Re gion:. III U'. S.. Atomic: Energy Commi'asion-799 Roosevelt Road I
Glen *.Ellyn, 1111noi's 60137'
Reference:
Quad-Cities Huolear-Power: Station,.Uhit 1 0
Docket No. 50-25% DPR-29 i
(
Appendix A. Sections.1.0. A.2,. 3 3.B. 3.b.,s 6. 6. B:..l. a t
1
Dear-MP..Keppler:
!s.
i The purpose. of thib-letter is. to provide you with. notification.
t of an Abnor.tal Occurrence at. required-by. Technical Specification._
l 6.6.D.1.a. withint 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of' the occurteence.
[
}
While: pulling rods for startup. of Unit.1 on December-16,.1974~
l the RUM computer failed: andEdidinot. armunciate.
This: failure;
[
of the 11EM ocEurred during startup; below 10% power-andi allowed' l
the cperator* to withdraw. annout-of-sequence rod without a rod l
g block or a-larm This move occurred 5. Pods after the RWM failure.
I
[
Ther rod sequence
- error was recogni' zed Er vibual observati'orn of' the rod position display panel.
The out-of--sequence rod-was returned to. its in-sequence positidn. and the. RWM' was re-j turned.to operation.
This error-was corrected. within; 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />sw
)
7 hic occurrence was discussed by-telephone-with_Mr. Knopp of' i
your office on. December 1
16. 1974..
Further information~ will be i
3 l
provided by Abnormal Occurrence Report AO: 50-254/74-39; which. Will be submitted' within 10 days. of the date of this. occurrence.
j
.Vbry truly yours,
[,,
COMMONWEALTH EDISOM COMPAlW QUAD. CITIES ~. N CLEAR POWER STATION 1 f
k E
H. J.. Kalivianakis k'c -
Statierr Superintandent r4 c)y g
~
NJK/BBP/1k g
4 cc:
Directorate: of Li' censing
'}:
J. S.
Abel j
if
,, - s u tv t-00-
-