ENNESSEE VALLEY A CAITY CHATTANOOGA, TENNESSEE 37401 July 5, 1973 40 ammivensany 05Er"N n Mr. F. E. Kruesi, Director Directorate of Regulatory Operations

  • O U.S. Atomic Energy Comission Washington, DC 205k5 50' g 6i

Dear Mr. Kruesi:

This is an interim report on the failure of Limitorque operators of suppression pool spray valves FCV-1-Th-72 and FCV-1-74-58 during construction of Browns Ferry Nuclear Plant unit 1.

Initial report of the failure was made on June 4, 1973, by telephone to DRO Inspector W. S. Little.

The subject failure was discovered on May 28, 1973. We are con-tinuing our investigation of the failure and the corrective action to be taken. We expect to submit the final report on this deficiency by July 30, 1973 Ve truly ours, f

~

MW J. E. Gilleland [

Assistant to the Manager of Power CC: Mr. Norman C. Moceley, Director Directorate of Regulatory Operations U.S. Atomic Energy Comission Region II - Suite 818 230 Peachtree Street, NW.

Atlanta, Georgia 30303

- u -\

8307080565 731116 -

PDR ADOCK 05000259 P PDR f

J 3 0571