LER ER-77-010:on 770131,ice Loading on 345-kV Bus Tie & Station Power Lines Greater than Expected Due to Cooling Tower Plume Passing Lines.Caused by Environ Conditions & Cooling Tower Operation
ML20084U244
Person / Time
Site: Palisades 
Issue date: 02/14/1977
From: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
LER-ER-77-010, LER-ER-77-10, NUDOCS 8306280264
Download: ML20084U244 (2)


Text

a..

V, UCENSEE EVENT REP Paticad ;s

. ~.

CONTACL ELCCX:l l

l l

l l

l (PLEASE PRINT ALL REQUIRED INFORMATION) 1 6

UCENSEE L: CENSE LV?NT NAME LCENSE NUMBER TYPE TYFC

] l:!lIlPlAlLl1l l0l0l-!0l0l0l0l0l-l0l0l lLl1l1llI1l l 0 l1 l 7 89 14 15 25 26 30 31 32 AEPORT AEPCAT NPE SCUACE CCCxET NUMBER EVENT CATE REPCRT CATE hCONT l

  • l
  • l lTl

[LJ l015 l o !-l o l 2 l 5 l S l l 011 l 311 l 7 l 7l lol2l1lhl7l71 7 8 57 58 59 60 61 68 69 74 75 80 EVENT CESCA;PTION O2 l On Jsnusrr ?l.1077 ice lesdin: en the 3h5 kV bus tia andstationrevarlinesbatvaanl 7 89 CD l

03 l the Palisades Plant and the svitchyard were cbserved to be grester than normally ex-7 89 60 0

l pected due to the cooling tover plume passing the lines. Plant power level was held l

7 89 60 0

l at 60, until h PCP loss of flow vithout turbine renerator coastdcun could be analyzed l 7 89 a0

@ ] and croper operatien of both diesel generators verified.

(ER-77-10) l 60 7 89 psmes SYSTD 4 CAUSE CCMAGNENT CCMPCNENT CCCE CCCE CCMPCNENT CCCE SUPALER MANUFACTLFER VCLATCN O

lEl01 ICl l:l:1 zi zl zl l

1: l lzlzI:lzl lNl-7 89 10 11 12 17 43 44 47 48 CAUSE CESCBlPTICN Oe l Abnormal icing is due to environmental conditions and operation of the cooling towers. l GC 7 89 09 l FSAR Accident Analysis (See lh.71 does not consider h cu=o loss of flow incident l

' 99 80

, l vithout turbine generator assist as credible.

J 7 89 raC:uTy METHCC CF Status

% PCWER CTHER STATUS C!SCCN EAY C:SCCVERY CESCA:PT:CN h

d l0l6l0l l

NA l

lbl l Visual Obs of Tovers & Lines l

7 8 9

10 12 13 44 45 AS 80 FOAM CF ACTMTV CCNTENT AELEASE3 CF QELEASE AMOUNT CF ACTMTV LCCATICN CF AELEASE 1

l 3l NA NA l

7 8 9

10 11 44 45 80 PERSONNEL EXPCSURES NUMBEA TYCE CESC3!AT:CN 1 13 l 0l 0l 0l l 2l l

IIA I

7 89 11 12 13 cu PERSCNNEL INJUA:ES NUM8ER CESCR;PT!CN l0l0l0l l

NA l

14 7 89 11 12 80 PROP.ABLE CCUSEQ,UE:TCES 15 l None; loss of h PCP anal / sis indicates adequate MDN3R.

l 7 89 20 LCSS CA OAMAGE TO FAC!UTY W PE CESC31ptCN UA l

7 d9 1C 50 UUGUC:TY

'd!

A l

19 50 ADDITICNAL FACTCAS 19 l NA l

7 89 ea dl NA l

7 8i 8306280264 770214 80 PDR ADOCK 05000255 t

S PDR

a... ;

p

(~' )

s C/

V

.=tX.s 7

Consumers

?l 4 Power

. A

.., // Company sms con

/

' < ~ ~ '

uob J

o... om...; m w.

u.

........;..........~,., m e,.4,..co. m u..

..o February 14, 1977

. D\\

. ( 4 -vN'W, t A

Mr Ja=es G Keppler

/

Office of Inspection & Enforce =ent A,\\(,q 1 Region III s.-

q s-US :Tuclear Regulatory Co==ission g

.g' T99 Roosevelt Road 4-.%

"" W ~

Glen Illyn, IL 60137

,s DOCKET 50-255, LICE'ISE DPR 's I

PALISADES PLANT - IR-TT FOUR PCP LOSS OF FLO'4 On February 1,1977, we notified the II staff of increased icing on the trans-

=ission towers and lines between the Palisades P3 cnt and the 345 kV switchyard.

The consequences of a co=plete tower failure could result in a condition not specifically considered in the FSAR Section 1h.7

'de, therefore, initiated analysis to deter =ine the structural adequacy of the towers and lines as well as a h-pu=p loss of fl:V without steam generator coastdown. The 4-pu=p loss of flow analysis has been ec=pleted and trans=1tted to the NRC staff for review.

The results incicated the transient to be less severe than others presented in Section 1h.7 of the FSAR. Preliminary analyses of the trans=ission towers and lines have been co=pleted which indicate that a =argin of safety exists for observed ice loadings. Additional evaluations are being made to deter =ine if any modifications to the towers or lines are required.

David P Hoffnan (Signed)

David P Eoff=an Assistant Nuclear Licensing Ad=inistrator l