Telecopy Ao:On 750326,pressure Suppression Valves AO-2-1601- 23,56 & 63 Failed to Close in Required Time.Solenoid for Valve AO-2-1601-63 Replaced & Air bleed-offs Readjusted
ML20084U178
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/26/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084U176 List:
References
NJK-75-156, NUDOCS 8306270114
Download: ML20084U178 (1)


Text

P T' 1

,- p V

- Coaunonwealth Edison

-b( OM-Cibes Geerst: rig SWbn Pos1 Office Go= 218

-- O Comm. tums 01242 Tetephont 3N/654-2241 NJK-/5-156 Telecopy Region lit, Attention: Mr. C. Feierabend March 26, 1975 J. Kepp l e r , Ret; i ona l Director Directorate of Regulatory Operations Region iI1 U. 5. Nuclear Regula tory Conni ss ion 799 Roosevelt Road Glen Ellyn, fliinois 6Cl37

Reference:

Quad-Cities Nucicer Power Stet i on, Unit 2 Occhet No. 50-265, OPR-30 Appe nsf i x A, Sections 1.0 A.2, Tahle 371

Dear Mr. Nepp le r :

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.1.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

I At 4:00 a.m. on March 26. 1975. with Unit 2 in the cold shutdown condition for

efue!!:9, su r .e ! ! un:_e testing uf the priuery cent.a4muent isciatica valves in t h e. prr.sure suppre,. inn y tem re ven i c ri that vaive AO 7-LEG i-63 unulti nnt r. i t tn n ,

and valves Au z-16u1-z3 and Au 2-1601-56 took 17.2 seconds and 14.1 seconds tn close respectively. This was in violation of closing tirre requirernents (< 10 _

seconds) in Table 3.7.1 of Technical Specifications.

The solenoid was replaced for valve A0 2-1601-63 and the valve was closed successfully in 4.2 seconds. The air bleed-off s were readjusted on valves A0 2-1601-23 and A0 2-1601-56. The valves were then retim?d at 7 seconds .1nd 6.8 seconds respectively. All repairs and retesting were completed on the same day as that of the occurrence.

This occurrence was discussed by telephone with Mr. Feierabend of your office on March 26, 1975 Further information will be provided by Abnormal Occurrence l Report A0 50-265/75-10 which will be subrei tted within 10 days of the date of this occur r en ce .

l Very truly yours, i C0hMONVEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION j /// y

,/y/-O&MUAf N. J. Kal ivianal ! s Sta-ici ut, ns +

tin ! c.,; ' a j < '

.t. :

d.

8306270114 PDD_Anru~ u 750402 (? LL -