Telecopy Ao:On 750417,during Hydrostatic Testing of Check Valves,Valves 2-220-20B & 67B Failed & 2-263-2-31H Leaked Excessively.Work Request 1274-75 Issued to Repair Valves
ML20084U162
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/18/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084U160 List:
References
NJK-75-208, NUDOCS 8306270081
Download: ML20084U162 (1)


Text

-~

s _ - __m.. _

s y -

Common- ith Edisan U

.! 7 . Quad -

Citie+. erating Station 'i

(( w. . p/ , Cordova,1;tinois61242 g

, Post O!!ico Box 216 j Tctcphone 303/GS4-2241

(*, ,. -

flJK-75-208 .

t Telecopy: Region ill, Attention: Mr. C. Felerabend j j ,- , 3 April 18, 1975 l [ APho , ) j

,/) .

my,O

m c( o S .a

.h / ,4M 4

J. Keppler, Regional Director V/\

J l

Directorate of Regulatory Operations M hyV . 'C U fs N '

. Reglon IIi ^'nC'/

  1. d dLh ?

i U. S. Iluclear Regulatory Comission .

799 Roosevelt Road Glen Ellyn, i11inois 60137

Reference:

Quad-Cities Huclear Power Station, Unit 2 Docket flo. 50-9/ C DPR-30 Appendix A,~ Sections 1.0.A.2, 3 7.D.1, 6.6.B.I.2 i

Dear Mr. Keppler:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.l.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

At 5:00 PM on April 17, 1975, during a hydrostatic test of Unit 2 reactor vessel instrument line flow check valves 2-220-203 and 2-220-678 failed to operate properly; and valve 2-263-2-31H leaked excessively. A work request (1274-75) has been issued to repair the valves.

1 This occurrence was discussed in person with Mr. Felcrabend of your office on April 18, 1975 F,urther informatlon will be provided by Abnormal Occurrence Report A0 50-265/75-12 which will be submitted within 10 days of the date of this occurrence.

t Very truly yours, COMMONWEALTH EDISON COMPAtlY QUAD-CITIES NUCLEAR POWER STATION (w) y O

..wo , j

11. J. Kalivianakis Station Superintendent HJ K/SRH/vm cc: Directorate of Licensing J. S. Abel 4362 o

f- -

Commor/e.;alth Edison t[Vm

  • f, .

Quad Citic. )nerating Station Q,'[%,d-Post O!!icet./. /16 Cardova,1:linois 61242

h. -Jy/

Q$ Telephone 330/654-2241 NJ K-75-208 Telecopy: Region lit, Attention: ftr. C. Felerabend ,f .f. ' '

April 18, 1975 ~.h</

t

-t M,?'o ,'

., ' L i. .,

..)'.*J

,,~ 'w e) pJ

$, ,... ,([

J. Keppler, Regional Director Directorate of Regulatory Operations

\ Q ' y [ "! AW -

Region ill ~ 'WM-/ 'b.dk p \ v )

U. S. tiuclear Regulatory Co: mission

  • l 799 Roosevelt Road i Glen Ellyn, Illinois 60137 i

Reference:

Quad-Cities fluclear Power Station, Unit 2 '

Docket flo. 50-265, DPR-30

- Appendix A, Sections 1.0.A.2, 3.7 0.I, 6.6.8.1.2 i

Dear Hr. Keppler:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.I.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

At 5:00 PM on April 17, 1975, during a hydrostatic test of Unit 2 reactor vessel instrument line flow check valves 2-220-203 and 2-220-67B failed to operate prop < rly; ano valve e-263-1-3iii icoked w.ussiv:,1/. f. ::rk rc:;t ett ( 3 ')?h-79 has been issued to repair the valves.

This occurrence was discussed in person with Mr. Felerabend of your office on April 18, 1975 Further information will be provided by Abnormal Occurrence Report A0 50-265/75-12 which will be submitted within 10 days of the date of this occurrence.

Very i:ruly yours, ,.

COMMONWEALTH EDISON COMPANY QUAD-CITIES tlUCLEAR POWER STATION

. < . +n y#

j 4

!. J. Kallvianakis Station Superintendent m?

NJK/SRH/vmm cc: Directorate of Licensing ,

- e J. S. Abel g 4362 a ~ m

-- v.