l NRC MONTHLY OPERATING REPORT DOCKET NO: 50-361 UNIT NAME: ._liggrd_.- 2 DATE: _.3/18/91 COMPLETED BY: M. M. Farr TELEPHONE: (714) 368 9787 ;
OPERATING STATUS
- 1. . Unit Name: San Onofre Nuclear Generatino Station. Unit 2
- 2. Reporting Period: -January 1991 -!
.3. Licensed Thermal Power 'MWt): 'i390
-4. Nameplate Rating (Gross-MWe): 1127 i
- 5. Design Electrical Rating -(Net MWe): 1070
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity.(Net MWe): 1070 _ !
- 8. If-Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report --Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net- MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to Date Cumulative
- 11. Hours _'.In Reporting Period 672.00 1.416.00 66.049.00
- 12. - Number'0f. Hours Reactor Was Critical 672.00 1.416.00 48.175.56
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 l- 14.- Hours 6ererator On-Line 672.00 1.416.00 47.218.42 L ~15. . Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. . Gross Thermal Energy. Generated (MWH)L 2.249.772.66 4.753.407.56 154.237.392.28 17 1 : Gross Electrical- Energy Generated-(MWH) 770.431.QQ 1.629.186.50 52.336.680.50' 18.' ~ Net Electrical Energy Generated (MWH) 2.35.596.00 1.555.674.00 49.608.196.24 l19.. ' Unit-Service Factor 100.00% 100.00% 71.49%
- 20. ' Unit' Availability. Factor .
100.003- 100.00% 71.49.%
321. Unit Capacity-Factor (Using MDC: Net) 102.30%. 102.68% _ 70.19%
I.2 - -Unit Capacity Factor (Using DER Net) 102.30%. 102.68% _. 70.19%:.
23i , Unit Forced Outage Rate -
0.00% 0.00% 6.01%
! 24. . Shutdowns _ Scheduled Over Next 6 Months (Type, %;e, and Durat t,i of Each):
NA
! 25. LIf Shutdown At End Of Report Period, Est. mated Date of Startup: NA
' 26.. . Units Inziest Status (Prior To Commerc'al Operation):- Forecast Achieved INITIAL CRITICALITY NA- NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA mor.feb/2 9103250321 910318 PDR ADOCK 05000361 R PDR
n
, .k -
i
- AVERAGE DAILY lEiT POWER t.EVEL DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: _- 3/i s /91 COMPLETED BY: M. M. Farr TELEPHONE: -(714) 366-9787 i
MONTih February 1991 d
' DAY AVERAGE' DAILY ~ POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
'(MWe-Net) (MWe-Net) lq l 1105.71 17 11K 17 -!
2 '885.29 18 1102,16 z
3: -1091.08 19; ,, f,N2 08 l 4 -1104'.75 .20 1101.63 5 1106.00- 21 1101.13
. i 6 1104.08 22 1096.96 -i 47- 1101.38 23 1105.79 8 -- 1103.29 24 1106.13 9L 1079.83 :25 1104.67- -l)
L 10 - - 1106.83- 26- 1105.21 s e .1
-11' 1105.96- 27 1104.71 '
- .12 i
-1106.'71- 28 1105.42 131 1106-67
, 14: 1106.50- ;
1
- 15. 1098.96 16- 1101.79-1 9/ 4
- mor.feb/3
.O
'I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-361' UNIT NAME: SONGS - 2 REPORT MONTH: February 1991 DATE: 3/18/91 ~
COMPLETED BY: M. M. Farr TELEPHONE: (714) 368-9787 Method oi-Shutting Cause & Corrective Duration Down LER System Component Action to 2 t Reactor 3 No. Code' Code' Prevent Recurrence No. Date Type (Hot'rs) Reason NA NA NA NA NA NA NA NA NA PIA 3
Method: "IEEE Std 805-1984
'F-Forced ' Reason:
A-Equipment Failure (Explain) 1-Manual S-Scheduled 2-Manual Scram.
B-Maintenance or Test C-Refuel ing 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month S 5-Reduction of 20% IEEE Std 803A-1983 F-Administrative G-Operational Error (Explain) or greater in the H-Other (Explain) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other (Explain) mor.feb/4
)
1
SUMMARY
OF-0PERATING EXPERIENCE FOR-THE MONTH DOCKET N0:- _5r 361-UNIT NAME: SONGS - 2 DATE: 3/18/91' COMPLETED BY: M. M. Farr TELEPHONE: (714) 368 9787 4 QLt.t Ilme Event February 1- '0001' Unit isiin Mode 1 at 100% reactor power. Turbine
- load at 1151 MWe gross.
LFebruary 2 0100 - Commenced- reactor power decrease to 80% for circulating water system heat treatment.'
0515 Reactor ~at 80% power. '
i
-2200_ ' Commenced _ reactor power increase to 100% following _
completion of heat treating operations. l I February 3 ' 0305 Reactor at 100% power.-
February 28 12400 Unit is in Mode 1 at 100% reactor power. Turbine load l
,' at.ll53 MWe gross. i 1
eI
-ae v k I i
t mor'. feb/5 -
, _ = -- m __.- _m + ,-.
REFUELING INFORMATION DOCKET NO: 50-361 UNIT NAME:3/16;il M S.-2 DATE: _
COMPL ETfD BY: M. M. Farr Tl. "9NE: (714) 368 9787 MONTH: February 1991
- 1. Scheduled date for next refueling shutdown.
Cycle 6 refueling outage is forecast for July 1991.
- 2. Scheduled date for restart following refueling.
Restart from Cycle 6 refueling outage is forecast for October 1991.
- 3. Will refueling or resumption of operai;;r, thereafter require a Technical Specification change or other license amendment?
No.
What will these be?
Not applicable.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not upplicable.
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None.
mor.feb/6
i REFUELING INFORKATION DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE: 3/18/91 COMPLETED BY: M. M. Farr TELEPHONE: (714) 368-9787 MONTH: February 1991
- 6. The number of fuel assemblies, a) In the core. 217 b) In the spent fuel storage pool. 446 (376 Unit 2 Soent Fuel Assemblies and 70 Unit 1 Soent Fuel Assemblies
- 7. Licensed spent fuel storage capacity. 1542
- Intended change in spent fuel storage capacity. None
- Expanded from 800 to 1542 by License Amendment No. 87 - Facility modification is scheduled to be completed by April 1991.
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 2001 (full off load capability) mor.feb/7
NRC MONTHLY OPERATING REPORT DOCKET N0: 50 362 UNIT NAME: _ SONGS - 3 DATE: 3/18/91 COMPLETED BY: M. M. Farr TELEPHONE: (7141 3 @ -9787 _
OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generatina Station. Unit 3
- 2. Reporting Period: February 1991
- 3. Licensed Thermal. Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1121
-5. Design Electrical Rating (Net MWe): 1080
- 6. Maximum Dependable Capacity (Gross NWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): __ 1080
- 8. If Changes occur In capacity Ratings (ltems Number 3 Through 7)
Since Last Report, Give Reasons: NA
- 9. Power Level.To Which Restricted, If Any (Not MWe): NA
- 10. Reasons for Restrictions, If Any: NA This Month Yr.-to-Date cumulative
- 11. Hours In Reporting Period 672.00 1.416.00 60.600.00
- 12. Number Of Hours Reactor Was Critical 672.00 1.416.00 45.643.97
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00_
14.- Hours Generator On-Line 672.00 1.416.00 44.392.49
, 15. Unit Reserve Shutdown Hours 0.00 0.00 0 . 00__
- 16. . Gross Thermal Energy Generated (MWH) 2.251.388.56 4.759.357.22 141.056.998.78
-17. Gross Electrical Energy Generated (MWH) 765.725.50 1.633.200.00 47.884.882.50
- 18. Het Electrical Energy Generated (MWH) 728.836.00 1.554.675.00 45.179.584.33
- 19. Unit Service Factor 100.00% 100.00% 73.25%
- 20. Unit Availability Factor 100.00% 100.00%- 73.25%
- 21. Unit Capacity Factor (Using MDC Net) 100.42% . 101.66% 69.03%
l
- 22. Unit Capacity Factor (Using DER Net) 100.42% 101.66% 69,03%
- 23. Unit Forced Outage Rate 0.00% 0.00% 7.54%
! 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test-Status (Prior To Comnercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA mor.feb/8
~ -
3 ; gs
. z. ,
l
.+
AVERAGE DAILY UNIT POWER LEVEL DOCKETEN0: ' 50-361-UNIT NAME: SONGS - 3 DATE:- 3/18/91 COMPLETED BY: M, M. Farr 4 TELEPHONE: (714) ?68-9787 -)
' 4 . MONTH:= February 1991 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)' (MWe-Net) l -1= 1093.00 17 1046.88 ,
s5 2- 1097.21- 18 1099.63 P
13'- 1098.38'-- 19- 1101.92 4- 1099.21' 20 '102.33 5: :1099.13 21 1078.21 .
6 1097.58 22 1094.13 .,
'7^ 1098.38 23 1100'.42 8~'- 1092.58 24 1099.04
)
-1097.13 25 1097.21 10! 1096.04- 26 1098.~33 t11: ~1096.08- 27 1098.92 '
12 1095.00- 28 1099.54 lu 113: 1095.79-
,. '14 1096.29' W "
x L15 - 1067.58
- 18 l'6' = 832'.25- ,
g 1-
.mor.feb/9
~
UNIT SHUT %WNS AW POWER REDUCTIONS : DOCKET Not 50-362-
' UNIT NAME:~ SONGS REPORT MONTH:' February 1991 DATEt: 3/18/91- '...~
COMPLETED BY: M.' M.:Farr TELEPHONE:- (714) 368-9787 Method of-
' Shutting' '
Cause & Corrective-Duration 1 -
Down 'LER ~ System Component Action to Code5 '
l No. Date Type :(Hours) Reason *- Reactor' -
No. Code' Prevent Recurrence.
'i~
, .55 910216 S 0.00 -B. 5 ..NA KE .COND . Reduced power to 80% to-support condenser water box cleaning.
4 2
F-Forced - ' Reason:' . . 'tethed:
'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual-B-Maintenance or Test. 2-Manual Scram.-
C-Refueling' 3-Automatic Scram.
D-Regulatory ; Restriction 4-Continuation from E-Operator Training & License Examination .. Previous Month 5 F-Administrative . 5-Reduction of 20% 1EEE Std 803A-1983 G-Operational Error ~(Explain) or greater in the H-Other (Explain) past 24~ hours 6-Other (Explain) mor.feb/10
=. a.:. - . .= -- - -- - - - - - - _ . _ .-
c.? -..-
$UMMARY 0F CPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50 362 UNIT NAME: SONGS - 3 DATE: 3/18/91 i
. COMPLETED BY: M. M. Farr TELEPHONE: (714) 368-9787 QA18 limt Event
-February 1 '0001 . Unit ~is in Mode 1.at 100% reactor power. Turbine load at 1150 MWe gross.
February 15 1955 - Commenced reactor power decrease to 80%' for circulating
. water system heat treatment.
2225 Reactor at 80% power,- )
February :16 ~0200: Commenced reactor power increase to 100% following.
completion:of heat treating operations.
0650 Reactor at 100% power.
February 281 2400 Unit is in Mode 1 at 100% reactor power. Turbine load atJ1144 MWe gross.
- February 28 2400 Unit is in Mode _1 at 100% reactor power. Turbine. load at 1150 MWe gross.
w '
?.
( ':
mor.feb/11
, j -- . -.
REFUELING INFORMATION m
4 ?
DOCKET NO:. 50-362-UNIT NAME: . SONGS - 3 DATE: 3/18/91 COMPLETED BY: M. M. Farr y TELEPHONE:- (714) 368 9787 9 '
% ~ MONTH: February'1991 1.-. Scheduled'date for next refueling shutdown.
Cycle 6 refueling outage is forecast for January 1992, s
, 2. Scheduled date for restart following refueling.
'Restr.rt from Cycle 6 refueling outage is forecast for April 1992.-
- 3. Will refueling-or resumption of operation thereafter require a Technical
- ,. - Specification change- or other license amendment?
Nottyet specifically determined. Under evaluation.
,What'will these be?~
~
' Not yet specifically determined.. Under evaluation, m-L4. Scheduled date .for submitting' proposed licensing action and supporting. ,
L ; information.'
Not.yet'.specifically deterndned.- Under evaluation.
.5 important-licensing considerations associated with refueling, e.g.-new or a
- different
- fuel design:or supplier, unreviewed-desijn or performance analysis methods,isignificar.t changesLin fuel-design, new operating procedures.
. Not yet specifically determined. Under evaluation.
y t
moi.feb/12
t '4 ? rg I k 1
p ;
e
.REFUELII.G INFORMATION
'. DOCKET.NO: 50-362-UNIT NAME: SONGS -
DATE: 3/1a/91 ca COMPLETED BY: -M. M. Farr TELEPHONE:- (714) 368-9787-J,
} MONTH: February 1991- .
~
6.1The number of fuelt assemblies.
a)- In :thel core. 217 b)- Iri the spent ' fuel storage pool. .
~
-445'(376 Unit 3 Soent Fuel Assemblies and 69 Unit 1 SDent fuel t Assemblies i7blicensed' spent! fuel lstoragecapacity. 1542 *
-IntendedLchangetin spent.. fuel. storage capacity. . None
- . Expanded.from 800 to-1542 by License' Amendment No. 77 - Facility-modificationlis scheduled to be completed by September.1991.
i8.gProjected dateLof lastLrefueling trat canLbe discharged to: spent fuel. storage.
pool assuming p'resenticapacity.
- Approximately 2003)(full 'off load. capability)-
m ,
L -
1 %
y l
ls L 4 E ,.
mor.feb/131 l-l--
l:-
, . . . . . _ . _ . .-.._,.2_ . .s_ _ _ - .
. ._ , ,_