NRC MONTHLY OPERATING REPORT DOCKET NO:
50-361 UNIT NAME:._liggrd_.- 2 DATE: _.3/18/91 COMPLETED BY:
M. M. Farr TELEPHONE:
(714) 368 9787 OPERATING STATUS
- 1.. Unit Name:
San Onofre Nuclear Generatino Station. Unit 2 2.
Reporting Period: -January 1991
.3.
Licensed Thermal Power 'MWt):
'i390
-4.
Nameplate Rating (Gross-MWe):
1127 i
5.
Design Electrical Rating -(Net MWe):
1070
- 6. Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity.(Net MWe):
1070 8.
If-Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report --Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net-MWe):
NA
- 10. Reasons For Restrictions, If Any:
NA This Month Yr.-to Date Cumulative 11.
Hours _'.In Reporting Period 672.00 1.416.00 66.049.00
- 12. -
Number'0f. Hours Reactor Was Critical 672.00 1.416.00 48.175.56 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.00 l-14.-
Hours 6ererator On-Line 672.00 1.416.00 47.218.42 L
~15.
. Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.
. Gross Thermal Energy. Generated (MWH)L 2.249.772.66 4.753.407.56 154.237.392.28 17 1 : Gross Electrical-Energy Generated-(MWH) 770.431.QQ 1.629.186.50 52.336.680.50' 18.'
~ Net Electrical Energy Generated (MWH) 2.35.596.00 1.555.674.00 49.608.196.24 l19.. ' Unit-Service Factor 100.00%
100.00%
71.49%
20.
' Unit' Availability. Factor 100.003-100.00%
71.49.%
321.
Unit Capacity-Factor (Using MDC: Net) 102.30%.
102.68% _
70.19%
I.2 - -Unit Capacity Factor (Using DER Net) 102.30%.
102.68% _.
70.19%:.
23i, Unit Forced Outage Rate 0.00%
0.00%
6.01%
- 24.. Shutdowns _ Scheduled Over Next 6 Months (Type, %;e, and Durat t,i of Each):
NA 25.
LIf Shutdown At End Of Report Period, Est. mated Date of Startup:
NA
' 26..
. Units Inziest Status (Prior To Commerc'al Operation):-
Forecast Achieved INITIAL CRITICALITY NA-NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA mor.feb/2 9103250321 910318 PDR ADOCK 05000361 R
n
,.k -
i
- AVERAGE DAILY lEiT POWER t.EVEL DOCKET NO:
50-361 UNIT NAME:
SONGS - 2 DATE: _- 3/i s /91 COMPLETED BY:
M. M. Farr TELEPHONE: -(714) 366-9787 i
MONTih February 1991 d
' DAY AVERAGE' DAILY ~ POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
'(MWe-Net)
(MWe-Net) l q
l 1105.71 17 11K 17 2
'885.29 18 1102,16 3:
-1091.08 19; f,N2 08 l
z 4
-1104'.75
.20 1101.63 5
1106.00-21 1101.13 i
6 1104.08 22 1096.96
-i 47-1101.38 23 1105.79 8 --
1103.29 24 1106.13 9L 1079.83
- 25 1104.67-
-l)
L 10 -
1106.83-26-1105.21 s
_e
.1
-11' 1105.96-27 1104.71
- .12
-1106.'71-28 1105.42 i
131 1106-67 14:
1106.50-15.
1098.96 1
16-1101.79-1 9/
4
- mor.feb/3
.O
'I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-361' UNIT NAME: SONGS - 2 REPORT MONTH:
February 1991 DATE:
3/18/91
~
COMPLETED BY:
M. M. Farr TELEPHONE:
(714) 368-9787 Method oi-Cause & Corrective Shutting Duration Down LER System Component Action to No.
Date Type (Hot'rs) Reason Reactor No.
Code' Code' Prevent Recurrence 2
t 3
PIA NA NA NA NA NA NA NA NA NA
'F-Forced
' Reason:
Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
3-Automatic Scram.
C-Refuel ing 4-Continuation from D-Regulatory Restriction E-Operator Training & License Examination Previous Month S
5-Reduction of 20%
IEEE Std 803A-1983 F-Administrative G-Operational Error (Explain) or greater in the H-Other (Explain) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other (Explain) mor.feb/4
)
1
SUMMARY
OF-0PERATING EXPERIENCE FOR-THE MONTH DOCKET N0:- _5r 361 UNIT NAME:
SONGS - 2 DATE:
3/18/91' COMPLETED BY:
M. M. Farr TELEPHONE:
(714) 368 9787 4
QLt.t Ilme Event February 1-
'0001' Unit isiin Mode 1 at 100% reactor power.
Turbine
- load at 1151 MWe gross.
LFebruary 2 0100 - Commenced-reactor power decrease to 80% for circulating water system heat treatment.'
0515 Reactor ~at 80% power.
i
-2200_ ' Commenced _ reactor power increase to 100% following completion of heat treating operations.
l I ebruary 3
' 0305 Reactor at 100% power.-
F February 28 12400 Unit is in Mode 1 at 100% reactor power. Turbine load l
at.ll53 MWe gross.
i 1
eI
-ae v
k I
i t
mor'. feb/5 -
, _ =
m m
+
REFUELING INFORMATION DOCKET NO:
50-361 UNIT NAME: M S.-2 DATE:
3/16;il COMPL ETfD BY:
M. M. Farr Tl.
"9NE:
(714) 368 9787 MONTH:
February 1991
- 1. Scheduled date for next refueling shutdown.
Cycle 6 refueling outage is forecast for July 1991.
- 2. Scheduled date for restart following refueling.
Restart from Cycle 6 refueling outage is forecast for October 1991.
- 3. Will refueling or resumption of operai;;r, thereafter require a Technical Specification change or other license amendment?
No.
What will these be?
Not applicable.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not upplicable.
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None.
mor.feb/6
i REFUELING INFORKATION DOCKET N0:
50-361 UNIT NAME:
SONGS - 2 DATE:
3/18/91 COMPLETED BY:
M. M. Farr TELEPHONE:
(714) 368-9787 MONTH:
February 1991
- 6. The number of fuel assemblies, a)
In the core.
217 b)
In the spent fuel storage pool.
446 (376 Unit 2 Soent Fuel Assemblies and 70 Unit 1 Soent Fuel Assemblies
- 7. Licensed spent fuel storage capacity.
1542
- Intended change in spent fuel storage capacity.
None Expanded from 800 to 1542 by License Amendment No. 87 - Facility modification is scheduled to be completed by April 1991.
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 2001 (full off load capability) mor.feb/7
NRC MONTHLY OPERATING REPORT DOCKET N0:
50 362 UNIT NAME: _ SONGS - 3 DATE:
3/18/91 COMPLETED BY:
M. M. Farr TELEPHONE:
(7141 3 @ -9787 OPERATING STATUS 1.
Unit Name:
San Onofre Nuclear Generatina Station. Unit 3 2.
Reporting Period:
February 1991 3.
Licensed Thermal. Power (MWt):
3390 4.
Nameplate Rating (Gross MWe):
1121
-5.
Design Electrical Rating (Net MWe):
1080 6.
Maximum Dependable Capacity (Gross NWe):
1127 7.
Maximum Dependable Capacity (Net MWe): __
1080 8.
If Changes occur In capacity Ratings (ltems Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level.To Which Restricted, If Any (Not MWe):
NA
- 10. Reasons for Restrictions, If Any:
NA This Month Yr.-to-Date cumulative 11.
Hours In Reporting Period 672.00 1.416.00 60.600.00 12.
Number Of Hours Reactor Was Critical 672.00 1.416.00 45.643.97 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.00_
14.-
Hours Generator On-Line 672.00 1.416.00 44.392.49 15.
Unit Reserve Shutdown Hours 0.00 0.00 0. 00__
- 16..
Gross Thermal Energy Generated (MWH) 2.251.388.56 4.759.357.22 141.056.998.78
-17.
Gross Electrical Energy Generated (MWH) 765.725.50 1.633.200.00 47.884.882.50 18.
Het Electrical Energy Generated (MWH) 728.836.00 1.554.675.00 45.179.584.33 19.
Unit Service Factor 100.00%
100.00%
73.25%
20.
Unit Availability Factor 100.00%
100.00%-
73.25%
21.
Unit Capacity Factor (Using MDC Net) 100.42%
101.66%
69.03%
l 22.
Unit Capacity Factor (Using DER Net) 100.42%
101.66%
69,03%
23.
Unit Forced Outage Rate 0.00%
0.00%
7.54%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test-Status (Prior To Comnercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA mor.feb/8
~
3 ; gs. z.
.+
AVERAGE DAILY UNIT POWER LEVEL DOCKETEN0: ' 50-361-UNIT NAME:
SONGS - 3 DATE:- 3/18/91 COMPLETED BY:
M, M. Farr 4
TELEPHONE:
(714) ?68-9787
-)
. MONTH:= February 1991 l
4 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)'
(MWe-Net) l
-1=
1093.00 17 1046.88 s5 2-1097.21-18 1099.63 P
13'-
1098.38'--
19-1101.92 4-1099.21' 20
'102.33 5:
- 1099.13 21 1078.21 6
1097.58 22 1094.13
'7^
1098.38 23 1100'.42 8~'-
1092.58 24 1099.04
) -1097.13 25 1097.21 10!
1096.04-26 1098.~33 t11:
~1096.08-27 1098.92 12 1095.00-28 1099.54 lu 113:
1095.79-
'14 1096.29' W
1067.58 x
L15 -
- 18 l'6' =
832'.25-g 1-
.mor.feb/9
UNIT SHUT %WNS AW POWER REDUCTIONS :
DOCKET Not 50-362-
~
' UNIT NAME:~ SONGS REPORT MONTH:'
February 1991 DATEt: 3/18/91-
'... ~
COMPLETED BY:
M.' M.:Farr TELEPHONE:- (714) 368-9787 Method of-
' Shutting' '
Cause & Corrective-Duration 1 l
Down
'LER
~ System Component Action to No.
Date Type
- (Hours) Reason *- Reactor' -
No.
Code' Code '
Prevent Recurrence.
5
'i
.55 910216 S
0.00
-B.
5
..NA KE
.COND
. Reduced power to 80% to-
~
support condenser water box cleaning.
- ' Reason:'
'tethed:
'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual-B-Maintenance or Test.
2-Manual Scram.-
C-Refueling' 3-Automatic Scram.
D-Regulatory ; Restriction 4-Continuation from E-Operator Training & License Examination
.. Previous Month 5
F-Administrative 5-Reduction of 20%
1EEE Std 803A-1983 G-Operational Error ~(Explain) or greater in the H-Other (Explain) past 24~ hours 6-Other (Explain) mor.feb/10
=.
a.:. -
.=
c.?
$UMMARY 0F CPERATING EXPERIENCE FOR THE MONTH DOCKET NO:
50 362 UNIT NAME: SONGS - 3 DATE:
3/18/91 i
. COMPLETED BY:
M. M. Farr TELEPHONE:
(714) 368-9787 QA18 limt Event
-February 1
'0001
. Unit ~is in Mode 1.at 100% reactor power. Turbine load at 1150 MWe gross.
February 15 1955 - Commenced reactor power decrease to 80%' for circulating
. water system heat treatment.
2225 Reactor at 80% power,-
)
February :16
~0200:
Commenced reactor power increase to 100% following.
completion:of heat treating operations.
0650 Reactor at 100% power.
February 281 2400 Unit is in Mode 1 at 100% reactor power.
Turbine load atJ1144 MWe gross.
- February 28 2400 Unit is in Mode _1 at 100% reactor power. Turbine. load at 1150 MWe gross.
w
?.
( ':
mor.feb/11
j --
REFUELING INFORMATION m?
DOCKET NO:.
50-362-4 UNIT NAME:. SONGS - 3 DATE:
3/18/91 COMPLETED BY:
M. M. Farr TELEPHONE:-
(714) 368 9787 y
9
~ MONTH:
February'1991 1.-. Scheduled'date for next refueling shutdown.
Cycle 6 refueling outage is forecast for January 1992,
- 2. Scheduled date for restart following refueling.
s
'Restr.rt from Cycle 6 refueling outage is forecast for April 1992.
- 3. Will refueling-or resumption of operation thereafter require a Technical
- Specification change-or other license amendment?
Nottyet specifically determined. Under evaluation.
,What'will these be?~
~
' Not yet specifically determined.. Under evaluation, m-L4. Scheduled date.for submitting' proposed licensing action and supporting.
L information.'
Not.yet'.specifically deterndned.- Under evaluation.
.5 important-licensing considerations associated with refueling, e.g.-new or a
- different
- fuel design:or supplier, unreviewed-desijn or performance analysis methods,isignificar.t changesLin fuel-design, new operating procedures.
Not yet specifically determined. Under evaluation.
y t
moi.feb/12
t
'4
?
rg I
k 1
p e
.REFUELII.G INFORMATION DOCKET.NO:
50-362-UNIT NAME:
SONGS -
DATE:
3/1a/91 ca COMPLETED BY:
-M. M. Farr TELEPHONE:-
(714) 368-9787-J,
} MONTH:
February 1991-6.1The number of fuelt assemblies.
~
a)- In :thel core.
217 b)- Iri the spent ' fuel storage pool..
-445'(376 Unit 3 Soent
~
Fuel Assemblies and 69 Unit 1 SDent fuel Assemblies t
i7blicensed' spent! fuel lstoragecapacity.
1542 *
-IntendedLchangetin spent.. fuel. storage capacity..
None
- . Expanded.from 800 to-1542 by License' Amendment No. 77 - Facility-modificationlis scheduled to be completed by September.1991.
i8.gProjected dateLof lastLrefueling trat canLbe discharged to: spent fuel. storage.
pool assuming p'resenticapacity.
- Approximately 2003)(full 'off load. capability)-
m L
1 y
l ls L
4 E,.
mor.feb/131 l-l--
l:-
.-.._,.2_
.s
,_