ML20084S895

From kanterella
Jump to navigation Jump to search
Informs That Permanent Repairs to RHR Sys Pipe Restraints Completed
ML20084S895
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/15/1977
From: Banks H
CAROLINA POWER & LIGHT CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NG-77-685, NUDOCS 8306200057
Download: ML20084S895 (1)


Text

,_

~

o O

@@&I&

Carolina Power & Light Company lE BLE COP 3 June 15, 1977 File: NG-3513 (R) Serial: NG-77-685 Mr. Norman C. Moseley, Director U. S. Nuclear Regulatory Co= mission Region II, Suite 818 230 Peachtree Stre d , N.W.

Atlanta, Georgia 30303 H. B. 203tNSON SIEAM ELECTRIC PLANT UNIT NO. 2 "ACKET 50-261

  • LIC"NSE NO. DPR-23 ER SYS'.Ti PIPE RESTRAINTS Dear Mr. Moseleyt In January 1976 the Nuclear Regulatory Commission was notified by phone about certain Residual Heat Removal System pipe restraints at the H. B. Robinson Plant that were in need of repair. These restraints are located on the pipes between each RHR pump and its respective heat exchanger.

Following the notification, plant maintenance and engineering personnel examined and temporarily repaired each of the restraints.

Ebasco Services then provided assistance in designing permanent repairs on the affected supports. These permanent corrections have now been completed and the supports are functioning satisfactorily.

Yours very truly, H. R. Banks Manager Nuclear Generation HSZ/CSB/ pap -

8306200057 770615 PDR ADDCK 05000261 P PDR .

336 Fayettevdle Street . P. O. Box 1551. Raleigh. N. C. 27602

= . _ . _ _ _ _