n _.. v. _..
.... _... _... _ >... _._ _ u..
... _ ~. _,,,. - - -..
a...
.g n
- i.. /+.k' n
Comn riealth Edison x'-
[ dr' Quad.:C(ads Nuctcar Power Station h
3 Post Othee Box 210
/v d
'.JO.
'k ' ~~ [
Cordova. Illinois'61242
/'/ { h j 1"',.
JUNs 1975 %
Telephone 309/654 2241 ilJK-75-298 D
n cne tum C
A a' A
t-r. as:p y.,Q' <N M um5 (O/.
y a.,w o A
Teiecopy:
Region lil, Attention:
Mr. C. Fel e rabend
- 77 ig 4
Hay 29, 1975
=
~ '
'J. Keppler, Re'gional ' Di rector
.~ ~
Directorate of Regulatory Operations Region lli U. S. iluclear Regulatory Commission 799 Rooseve.it Road Glen Ellyn, l'Illnois 60137
Reference:
Quad-Ci ties fluclear Power Station, Uni t 1 Docket No. 50-254, DPR-29 Appendix A, Sections 1.0.A.2, 3.1, 6.6.B.I.a
Dear Mr. Keppler:
The purpose of this letter is to provide you with notification of an Ab-
. normal Occurrence as requi red by Techni cal Speci fi cation 6.6.B.'l.a.-wi thin -
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.
, At 11 :00, a.m. cri itay 20, 1975, while performing routine surveillancCtesting- ~~
l-
~
on the electrohydraulic control system low pressure sensors, pressure switch I-5600-PS-3 tripped at 890 PS! C, which is below the Techni. cal Speci fication limit 'f > 900 PSIG. The swi tch was then recalibrated to 935 PSI G.
o Due to the f requency of setpoint drif t beyond the limi ts for these swi.tches, the surveillance f requency has been increased from quarterly to weekly and-an action i tem has been issued to-the station Nuclear Engineering Department, to investigate possible replacement switches.
This occurrence was discussed by telephone with Mr. Feierabend of your ~ office on May 29, 1975 Further information wi11 be provided by Abnormal Occurrence Report A0'50-254/75-15 which will be submitted within 10 days ~of the'date-of" this occurrence.
Very truly yours, COMMONWEALTil EDISON COMPAllY QUAD-CITIES NUCLEAR POWER STATION
/W(/^/
p,r.w it.':.Ej h A
.Ah r
y je
-N. J. Kalivianakis Station Superintendent NJK/SRH/lk cc:
Director-of Of fice of Nuclear Reactor Regulation J. S. Abel 8306170149 750606:
PDR ADOCK 05000254 e**%.