Telecopy Ao:On 750528,pressure Switch 1-5600-PS-3 Tripped Below Tech Spec Limit.Switch Recalibr.Surveillance Frequency Increased from Quarterly to Weekly
ML20084S652
Person / Time
Site: Quad Cities 
Issue date: 05/29/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084S642 List:
References
NJK-75-298, NUDOCS 8306170149
Download: ML20084S652 (1)


Text

n _.. v. _..

.... _... _... _ >... _._ _ u..

... _ ~. _,,,. - - -..

a...

.g n

i.. /+.k' n

Comn riealth Edison x'-

[ dr' Quad.:C(ads Nuctcar Power Station h

3 Post Othee Box 210

/v d

'.JO.

'k ' ~~ [

Cordova. Illinois'61242

/'/ { h j 1"',.

JUNs 1975 %

Telephone 309/654 2241 ilJK-75-298 D

n cne tum C

A a' A

t-r. as:p y.,Q' <N M um5 (O/.

y a.,w o A

Teiecopy:

Region lil, Attention:

Mr. C. Fel e rabend

  • 77 ig 4

Hay 29, 1975

=

~ '

'J. Keppler, Re'gional ' Di rector

.~ ~

Directorate of Regulatory Operations Region lli U. S. iluclear Regulatory Commission 799 Rooseve.it Road Glen Ellyn, l'Illnois 60137

Reference:

Quad-Ci ties fluclear Power Station, Uni t 1 Docket No. 50-254, DPR-29 Appendix A, Sections 1.0.A.2, 3.1, 6.6.B.I.a

Dear Mr. Keppler:

The purpose of this letter is to provide you with notification of an Ab-

. normal Occurrence as requi red by Techni cal Speci fi cation 6.6.B.'l.a.-wi thin -

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

, At 11 :00, a.m. cri itay 20, 1975, while performing routine surveillancCtesting- ~~

l-

~

on the electrohydraulic control system low pressure sensors, pressure switch I-5600-PS-3 tripped at 890 PS! C, which is below the Techni. cal Speci fication limit 'f > 900 PSIG. The swi tch was then recalibrated to 935 PSI G.

o Due to the f requency of setpoint drif t beyond the limi ts for these swi.tches, the surveillance f requency has been increased from quarterly to weekly and-an action i tem has been issued to-the station Nuclear Engineering Department, to investigate possible replacement switches.

This occurrence was discussed by telephone with Mr. Feierabend of your ~ office on May 29, 1975 Further information wi11 be provided by Abnormal Occurrence Report A0'50-254/75-15 which will be submitted within 10 days ~of the'date-of" this occurrence.

Very truly yours, COMMONWEALTil EDISON COMPAllY QUAD-CITIES NUCLEAR POWER STATION

/W(/^/

p,r.w it.':.Ej h A

.Ah r

y je

-N. J. Kalivianakis Station Superintendent NJK/SRH/lk cc: